Firefly Open Source Community

Title: is RTC necessary for RK3288 / linux kernel? [Print This Page]

Author: bschiett    Time: 10/30/2016 04:28
Title: is RTC necessary for RK3288 / linux kernel?
Hi All
Is the RTC circuit in firefly rk3288 reload board necessary? I am designing my own board using the reload core module and don't need accurate date or time. I also will not use the ethernet PHY or wifi / BT chips. Does the RK3288 need the RTC, or does the kernel need to RTC?
Thanks
B

rtc.JPG (58.45 KB, Down times: 873)

rtc.JPG

Author: isle    Time: 10/31/2016 09:58
Hi bschiett
in the core module ,the 3288 need a 32k clock which is supplied by RTC


whithout this ,the rk3288 have no the temparature protection.
and the other thing ,when  go to sleep ,the rk3288 change it's clock from 24M to this 32K.
so we suggest you to hold it .

Author: bschiett    Time: 11/2/2016 05:01
isle Posted at 10/31/2016 09:58
Hi bschiett
in the core module ,the 3288 need a 32k clock which is supplied by RTC

thanks - in our application we don't want the linux kernel or rk3288 to sleep, we want it to keep running the same way non stop because it's an industrial application. How does the rk3288 use the 32k clock for temperature protection?
Author: isle    Time: 11/2/2016 09:56
Hi bschiett

here :



please refer to the chapter of CRU :
http://bbs.t-firefly.com/forum.p ... =275&extra=page%3D1



Author: bschiett    Time: 11/2/2016 16:59
isle Posted at 11/2/2016 09:56
Hi bschiett

here :

OK, thanks so much for the clarification. Does the RTC need to be powered all the time and does it have to be able to wake the CPU? In other words in the reload schematic there is the possibility to attach a battery and the RTC has the possibility to turn the PWR_EN signal on, is this necessary or not for our application?

Screen Shot 2016-11-02 at 09.58.58.png (40.54 KB, Down times: 845)

Screen Shot 2016-11-02 at 09.58.58.png

Screen Shot 2016-11-02 at 09.59.02.png (67.36 KB, Down times: 867)

Screen Shot 2016-11-02 at 09.59.02.png

Author: isle    Time: 11/3/2016 09:53
Hi bschiett
the battery is not necessary.
It need to  be attached only if you want  the CPU to be started automatically .
Author: bschiett    Time: 11/4/2016 18:12
isle Posted at 11/3/2016 09:53
Hi bschiett
the battery is not necessary.
It need to  be attached only if you want  the CPU to b ...

Thanks, so the 2nd circuit above to turn on PWR_EN via RTC is not essential?

If the MCU section of the schematic is removed because we don't need IR, this means PWR_EN_SYS will not be pulled high (because there is no MCU_VCC), so basically when the power is plugged in (VCC_SYS present) the user will have to press the POWER switch (SW3) to boot the system, correct? And to switch it off again press the POWER switch?


Author: isle    Time: 11/7/2016 10:22
Hi bschiett
Yes,It is not necessary.

Yes, when the MCU is gone,you can boot the system by press the POWER key.
Author: ellarog567    Time: 1/20/2026 10:19
Clicking the like button immediately—this is brilliant. The Exam Analytics-DA-201 price exam is here – wish me luck!
Author: ianbrow521    Time: 2/1/2026 04:42
通過AP-211考試認證,如同通過其他世界知名認證,得到國際的承認及接受,AP-211考試認證也有其廣泛的IT認證,世界各地的人們都喜歡選擇AP-211考試認證,使自己的職業生涯更加強化與成功,在KaoGuTi,你可以選擇適合你學習能力的產品。
Author: rickyou492    Time: 2/12/2026 07:14
I’m inspired by the message in this article, thank you for sharing! This is the Exam NSE4_FGT_AD-7.6 passing score exam I passed for my promotion and salary raise. It’s free for you today—hope you reach your career milestones!
Author: alanhil616    Time: 2/21/2026 18:11
世の中に去年の自分より今年の自分が優れていないのは立派な恥です。それで、IT人材として毎日自分を充実して、Experience-Cloud-Consultant-JPN問題集を学ぶ必要があります。弊社のExperience-Cloud-Consultant-JPN問題集はあなたにこのチャンスを全面的に与えられます。あなたは自分の望ましいSalesforce Experience-Cloud-Consultant-JPN問題集を選らんで、学びから更なる成長を求められます。心はもはや空しくなく、生活を美しくなります。




Welcome Firefly Open Source Community (https://bbs.t-firefly.com/) Powered by Discuz! X3.1