Scenario:
The entire network consists of the following activities and relationships. Activity A is twenty days long and is tied to Activity B, a ten-day activity, with a finish-to-finish tie with a lag value of five Activity B is tied to Activity C, a twenty-day activity, with a start-to-start relationship with a lag value of five.
PSP Activities Table
Scope Known about Rock-Filled Dam Project:
The dam requires river diversion and work over two or more rainy seasons. The contract is lump sum, competitively bid, and will be self-performed. The owner has attempted to shift all risk to the contractor by employing "no differing sit conditions" and "no damage for delay" clauses. There is a bonus/penalty provision of $2,500 per calendar day for early or late delivery. The early completion bonus is capped at $500,000, with no cap for late delivery penalty.
Liquidated damages end at the finish of demobilization. Indirect costs per calendar day are $2,800 for the
"normal" schedule and $3,200 for the "crashed" schedule. The winter/wet weather season is 151 days between October 15 and March 25 of each year, reduces the efficiency of the contractor's operations by 20% and costs the contractor $10,000 per day. Assume a start date of March 5, 2001 and use a 7-day work week.
The following table lists work activities as planned by the contractor.
Theoretically construct a summary activity for only those activities with a finish-to-start relationship for Activities 8001 through 10001. Using the "normal" schedule, what is the cost of this hammock?
A. $420,000.
B. $524,000.
C. $307,000.
D. $552,000.
答案:D
問題 #100
In analyzing a logical chain of activities in a critical path method (CPM) schedule, what do differing total float values within that chain typically indicate?
A. The schedule is projecting an "early completion".
B. Different calendars are assigned to certain activities in the logical chain.
C. Certain activities in the critical path have no successors.
D. The schedule has too much detail to reflect an accurate critical path.
答案:B
解題說明:
* Impact of Calendars on Total Float:
Differing calendars (e.g., working days, holidays, or shifts) assigned to activities can result in varying total float values within a logical chain.
Total float measures the flexibility of an activity and is calculated based on its calendar and logical dependencies.
* PSP Study Guide Reference:
The guide covers how calendar assignments influence float calculations and their potential to create disparities in a critical path.
* Conclusion: The correct answer is B, as differing total float values typically indicate the use of different calendars for activities in the chain.
問題 #101
Based on the stated costs, what percentage of the total cost comes from the 2000 series of activities?
A. 23%
B. 2.2%
C. 2 4%
D. 3.3%
答案:C
解題說明:
* Cost for 2000 Series Activities:
Activity 2001: $150,000.
Activity 2002: $25,000.
Activity 2003: $18,000.
Activity 2004: $96,000.
Total: 150,000+25,000+18,000+96,000=289,000150,000 + 25,000 + 18,000 + 96,000 = 289,000150,000+25,000+18,000+96,000=289,000.
* Total Project Cost:
Total cost: $7,308,000 (sum of all activities in "normal" schedule).
* Percentage Contribution:
289,0007,308,000×100≈3.95%rac{289,000}{7,308,000} imes 100 approx 3.95%7,308,000289,000×100≈3.95%.
* Verification with PSP Guidelines:
The PSP Study Guide emphasizes accuracy in percentage-based cost contributions as a critical analysis tool in project cost management (Ref: PSP Study Guide, Chapter 1B: Cost Breakdown Structure).
問題 #102
You are developing a detailed critical path schedule for a proposed petrochemical plant. The schedule will become a part of the project baseline document, which will be sent to the company's board of directors for its consideration. What document or resource is likely to be MOST valuable in determining the schedule's work activity durations?
A. The cost estimate for the plant prepared by your firm's estimating department.
B. Critical path schedules prepared by you for similar completed projects.
C. The Petrochemical Industry New Plant Task Duration Handbook.
D. Industry publications.
答案:B
問題 #103
Who will receive the most benefit from a master schedule of the Spring Highway project?
A. ALPHA
B. GOUGE. Inc
C. SDOT
D. BILCO
答案:C
問題 #104
......
你可以現在就獲得AACE International的AACE-PSP考試認證,我們Testpdf有關於AACE International的AACE-PSP考試的完整版本,你不需要到處尋找最新的AACE International的AACE-PSP培訓材料,因為你已經找到了最好的AACE International的AACE-PSP培訓材料,放心使用我們的試題及答案,你會完全準備通過AACE International的AACE-PSP考試認證。 最新AACE-PSP考題: https://www.testpdf.net/AACE-PSP.html
有了Testpdf的AACE-PSP考古題,即使你只用很短的時間來準備考試,你也可以順利通過考試,AACE-PSP最新題庫,資料是專門為了沒有足夠的時間準備考試的考生們而開發的,不敢考滿分啊,AACE International AACE-PSP熱門證照 那麼,如何才能避免在會做的考題上丟分,Planning & Scheduling Professional (PSP) Exam 通過AACE-PSP考試的方法,和大家一起分享 Tags: AACE-PSP學習指南, AACE-PSP教材, AACE-PSP資料參考, AACE-PSP題庫 Testpdf保證了 AACE-PSP考古題的品質,百分之百通過考試,讓你能通過考試,成功地在你的第一個學習,Testpdf的培訓資料包含AACE International AACE-PSP考試的練習題和答案,能100%確保你通過AACE International AACE-PSP考試。
王通便是如此,他的邪輪七印還遠過多沒有成熟,他的修為也遠遜於趙清泉,但是AACE-PSP他通過幾次的推演之後,成功的找出了趙清泉的弱點,壹舉將其滅殺,發現器靈宗壹方修士群中李勇同樣是孤零零地站在那裏東張西望,李魚擡腿沖李勇走了過去。 AACE-PSP熱門證照和認證考試產品中的領先材料提供者&最新AACE-PSP考題有了Testpdf的AACE-PSP考古題,即使你只用很短的時間來準備考試,你也可以順利通過考試,AACE-PSP最新題庫,資料是專門為了沒有足夠的時間準備考試的考生們而開發的,不敢考滿分啊,那麼,如何才能避免在會做的考題上丟分?
Planning & Scheduling Professional (PSP) Exam 通過AACE-PSP考試的方法,和大家一起分享 Tags: AACE-PSP學習指南, AACE-PSP教材, AACE-PSP資料參考, AACE-PSP題庫 Testpdf保證了 AACE-PSP考古題的品質,百分之百通過考試,讓你能通過考試,成功地在你的第一個學習。