EDGE-Expert最新題庫 & 最新EDGE-Expert考證有些網站在互聯網上為你提供高品質和最新的EDGE的EDGE-Expert考試學習資料,但他們沒有任何相關的可靠保證,在這裏我要說明的是這Testpdf一個有核心價值的問題,所有EDGE的EDGE-Expert考試都是非常重要的,但在個資訊化快速發展的時代,Testpdf只是其中一個,為什麼大多數人選擇Testpdf,是因為Testpdf所提供的考題資料一定能幫助你通過測試,,為什麼呢,因為它提供的資料都是最新的,這也是大多數考生通過實踐證明了的。 最新的 GBCI EDGE EDGE-Expert 免費考試真題 (Q70-Q75):問題 #70
Which of the following is a primary resource for the EDGE Auditor when performing the site visit?
A. EDGE software
B. Roof insulation U-value
C. Window to Wall Ratio (WWR)
D. EDGE Auditor's checklist
答案:D
解題說明:
During a site visit for post-construction certification, the EDGE Auditor relies on specific tools to verify compliance. The EDGE Expert and Auditor Protocols specify: "The primary resource for an EDGE Auditor during a site visit is the EDGE Auditor's checklist, which provides a structured list of items to verify, including the implementation of selected measures, alignment with the self-assessment, and compliance with EDGE standards" (EDGE Expert and Auditor Protocols, Section 4.4: Site Audit Procedures). Option C, EDGE Auditor's checklist, matches this description as the key resource guiding the audit process. Option A (EDGE software) is a tool for assessment, not a resource for the site visit: "The EDGE software is used for self-assessment and desk audits, not directly during site visits" (EDGE Certification Protocol, Section 3.2:
Audit Requirements). Option B (roof insulation U-value) and Option D (Window to Wall Ratio) are specific data points the Auditor may verify, not primary resources: "U-values and WWR are elements to check, not tools for the Auditor" (EDGE Expert and Auditor Protocols, Section 4.4: Site Audit Procedures). The checklist ensures all aspects of the project are systematically reviewed, making it the primary resource (Option C).
Reference:EDGE Expert and Auditor Protocols, Section 4.4: Site Audit Procedures; EDGE Certification Protocol, Section 3.2: Audit Requirements.
問題 #71
To claim efficiency measure Insulation for Cold Storage Envelope, which of the following documents is required as evidence at the preliminary certification stage?
A. Purchase receipts showing the U-value specification of the cold storage envelope
B. Calculations of Coefficient of Performance (COP)
C. Manufacturer's data sheets for the HVAC system
D. Drawing(s) showing the U-value specification of the cold storage envelope
答案:D
解題說明:
The preliminary certification stage requires specific documentation to verify the implementation of efficiency measures like Insulation for Cold Storage Envelope. The EDGE Certification Protocol outlines the evidence requirements: "For measures involving insulation, such as Insulation for Cold Storage Envelope, the Client must provide drawings at the preliminary certification stage that specify the U-value of the installed insulation to demonstrate compliance with the measure's requirements. The U-value must be lower than the Base Case to qualify for savings" (EDGE Certification Protocol, Section 3.2: Audit Requirements). Option C, drawings showing the U-value specification of the cold storage envelope, directly aligns with this requirement. Option A (calculations of Coefficient of Performance) is irrelevant, as COP applies to HVAC systems, not insulation:
"COP is used for chillers, not insulation measures" (EDGE User Guide, Section 4.2: Energy Efficiency Measures). Option B (manufacturer's data sheets for the HVAC system) is also unrelated, as the measure focuses on the envelope, not HVAC: "HVAC documentation is not required for insulation measures" (EDGE Certification Protocol, Section 3.2: Audit Requirements). Option D (purchase receipts showing the U-value) is more relevant at the post-construction stage: "Purchase receipts are typically required at the post-construction stage to confirm installation, while drawings suffice for design-stage verification" (EDGE Certification Protocol, Section 3.4: Post-Construction Requirements). Thus, drawings with U-value specifications (Option C) are required at preliminary certification.
Reference:EDGE Certification Protocol, Section 3.2: Audit Requirements, Section 3.4: Post-Construction Requirements; EDGE User Guide Version 2.1, Section 4.2: Energy Efficiency Measures.
問題 #72
To maintain their licensed status, what must EDGE Auditors do?
A. Undertake at least one building project audit every three years.
B. Attend refresher training for at least two hours every two years.
C. Undertake at least one building project audit every two years.
D. Attend refresher training for at least two hours every three years.
答案:C
解題說明:
EDGE Auditors must meet specific requirements to maintain their licensed status, ensuring they remain active and competent in their role. The EDGE Expert and Auditor Protocols provide detailed guidance: "To maintain their licensed status, EDGE Auditors must undertake at least one building project audit every two years. This requirement ensures that Auditors remain actively engaged in the certification process and maintain their practical experience in verifying EDGE projects" (EDGE Expert and Auditor Protocols, Section 5.1:
Maintaining Auditor Status). Option A, undertake at least one building project audit every two years, directly aligns with this requirement. Option B (attend refresher training for at least two hours every two years) and Option C (attend refresher training for at least two hours every three years) are incorrect, as the protocols specify a different training requirement: "EDGE Auditors must attend refresher training as required by IFC, typically every three years, but the duration is not specified as a minimum of two hours; the focus is on completing the training, not the exact hours" (EDGE Expert and Auditor Protocols, Section 5.1: Maintaining Auditor Status). Option D (undertake at least one building project audit every three years) is also incorrect, as the required frequency is every two years, not three: "A three-year interval for audits does not meet the requirement of one audit every two years, which is necessary to ensure ongoing competence" (EDGE Expert and Auditor Protocols, Section 5.1: Maintaining Auditor Status). The EDGE User Guide supports this by stating: "Auditors maintain their status by conducting at least one audit every two years, ensuring they stay familiar with EDGE standards and procedures through active practice" (EDGE User Guide, Section 6.5:
Working with EDGE Auditors). Additionally, the protocols note: "Failure to conduct an audit within two years may result in a lapse of Auditor status, requiring recertification through additional training or re- examination" (EDGE Expert and Auditor Protocols, Section 5.2: Recertification Conditions). Thus, undertaking at least one audit every two years (Option A) is the correct requirement for maintaining EDGE Auditor status.
Reference:EDGE Expert and Auditor Protocols, Section 5.1: Maintaining Auditor Status, Section5.2:
Recertification Conditions; EDGE User Guide Version 2.1, Section 6.5: Working with EDGE Auditors.
問題 #73
Which of the following is NOT a characteristic of the EDGE standard?
A. Simple, as beneath the intuitive interface is a powerful engine that understands local climate and how buildings will be used
B. Fast tool with ideal measures for the best return on investment
C. Holistic approach that takes into account wider sustainability issues
D. Smart, as capital costs and payback period for buildings are displayed
答案:C
解題說明:
The EDGE standard is designed to be a practical, focused tool for green building certification, emphasizing specific resource efficiency metrics. The EDGE User Guide describes its characteristics: "EDGE is a simple, fast, and smart tool for green building certification. It provides an intuitive interface with a powerful engine that accounts for local climate and building use (simple), identifies measures with the best return on investment (fast), and displays capital costs and payback periods (smart)" (EDGE User Guide, Section 1.1:
Introduction to EDGE). Options A, C, and D align with these descriptions. However, Option B (holistic approach that takes into account wider sustainability issues) is not a characteristic of EDGE, as the standard focuses narrowly on energy, water, and embodied energy in materials, not broader sustainability issues like biodiversity or social equity. This is clarified in the EDGE Certification Protocol: "EDGE is not a holistic sustainability standard; it specifically targets resource efficiency in energy, water, and materials, excluding wider sustainability metrics such as indoor air quality or ecological impact" (EDGE Certification Protocol, Section 1.2: Scope of EDGE Standard). Thus, Option B is not a characteristic of the EDGE standard.
Reference: EDGE User Guide Version 2.1, Section 1.1: Introduction to EDGE; EDGE Certification Protocol, Section 1.2: Scope of EDGE Standard.
問題 #74
The Client has sent a copy of the local occupancy permit for a project being audited. This permit:
A. Replaces the need to audit EDGE Materials measures.
B. Replaces the need to audit all EDGE measures.
C. Does not replace the need for desktop studies.
D. Does not replace the need to audit all EDGE measures.
答案:D
解題說明:
An occupancy permit indicates that a building meets local regulatory requirements for occupancy,but it does not address the specific green building measures required for EDGE certification. The EDGE Certification Protocol clearly outlines the role of such permits in the audit process: "A local occupancy permit provided by the Client confirms that the building complies with local building codes and is ready for use. However, it does not replace the need to audit all EDGE measures, as EDGE certification requires verification of specific energy, water, and materials efficiency measures that are not typically covered by local permits" (EDGE Certification Protocol, Section 3.4: Post-Construction Requirements). Option A, does not replace the need to audit all EDGE measures, directly aligns with this guidance, as the Auditor must still verify each claimed measure (e.g., insulation, low-flow fixtures, fly ash concrete) against EDGE standards. Option B (replaces the need to audit all EDGE measures) is incorrect, as the permit does not address EDGE-specific requirements:
"Local permits do not verify EDGE measures like energy savings or embodied energy reductions, so a full audit is still required" (EDGE Expert and Auditor Protocols, Section 4.4: Site Audit Procedures). Option C (does not replace the need for desktop studies) is partially correct but less comprehensive, as desktop studies are only one part of the audit process: "Desktop studies are part of the audit, but the occupancy permit does not exempt any aspect of the EDGE audit, including site visits and measure verification" (EDGE Certification Protocol, Section 3.2: Audit Requirements). Option D (replaces the need to audit EDGE Materials measures) is also incorrect, as materials measures (e.g., use of fly ash concrete) require specific evidence like manufacturer's data sheets, not covered by an occupancy permit: "Materials measures require detailed documentation of embodied energy reductions, which local permits do not address" (EDGE User Guide, Section 7.2: Materials Efficiency Measures). The EDGE User Guide further reinforces: "The Auditor must verify all EDGE measures through appropriate documentation and site visits, regardless of local permits, to ensure compliance with the EDGE standard" (EDGE User Guide, Section 6.3: Post-Construction Certification). Thus, the occupancy permit does not replace the need to audit all EDGE measures (Option A).
Reference:EDGE Certification Protocol, Section 3.4: Post-Construction Requirements, Section 3.2: Audit Requirements; EDGE Expert and Auditor Protocols, Section 4.4: Site Audit Procedures; EDGE User Guide Version 2.1, Section 6.3: Post-Construction Certification, Section 7.2: Materials Efficiency Measures.