olypropylene is a plastic material often used in packaging or pipes, but it is not recognized in EDGE as an insulation material due to its poor thermal resistance compared to standard insulation options like polystyrene or polyurethane" (EDGE Methodology Report Version 2.0, Section 6.1: Embodied Energy in Materials). The EDGE software's material database further excludes polypropylene from insulation options, focusing instead on materials with established thermal properties for building envelopes. Thus, polypropylene (Option C) is not an insulation option in EDGE.
reliminary Certification is based on a desk audit, not a site visit, which occurs at the post- construction stage" (EDGE Certification Protocol, Section 3.3: Certification Decision). Thus, compliance documents (Option C) are required in the submission.
hotographs are required at the post- construction stage to confirm installation, not at the design stage" (EDGE Certification Protocol, Section 3.4:
urchase receipts verify installation, not design intent" (EDGE Certification Protocol, Section 3.4: Post-Construction Requirements).
reparation EDGE-Expert Store[/url]| Welcome Firefly Open Source Community (https://bbs.t-firefly.com/) | Powered by Discuz! X3.1 |