可靠的SAP 免費下載C-P2W22-2504考題和最佳的Testpdf - 資格考試的領先提供商目前SAP的C-P2W22-2504認證考試真的是一門人氣很高的考試。還沒有取得這個考試的認證資格的你,是不是也想參加考試呢?確實,這是一門很難的考試。但是這並不代表不能獲得高分輕鬆通過考試。那麼,還不知道通過這個考試的捷徑在哪里的你,是不是想知道通過考試的技巧呢?現在我來告訴你,就是利用Testpdf的C-P2W22-2504考古題。 最新的 SAP Certified Associate C-P2W22-2504 免費考試真題 (Q54-Q59):問題 #54
When does the system trigger replenishment for a Kanban container?
A. When you set the container to Empty
B. When you set the container to In transit
C. When you set the container to Full
D. When you set the container to Waiting
答案:A
問題 #55
What are prerequisites for a production version to be selected for a production order? Note: There are 3 correct answers to this question.
A. The production quantity must only lie within the lot-size range of the routing in the production version.
B. The production quantity must lie within the lot-size range of the production version.
C. The basic end date of the order must lie within the validity period of the production version.
D. The production version must NOT be deleted.
E. The basic start date of the order must lie within the validity period of the production version.
答案:A,B,E
問題 #56
What happens when you set up detailed scheduling with the finite scheduling mode Insert Operation?
A. An operation is scheduled as close as possible to the desired date.
B. Sequencing on multi-activity resources is automatically updated during planning.
C. Operations on multi-resources are planned finitely in a sequence.
D. To create a slot, neighbouring operations are moved in both planning directions.
答案:A
問題 #57
How do you model a production line in repetitive manufacturing?
A. As a resource network
B. As a work center
C. As a routing
D. As an operation
答案:B
問題 #58
You want to set up a make-to-order planning scenario for a finished product. The bill of material contains two components: one should be procured for each sales order individually, and the other should be procured jointly for all independent requirements. Forecasting for the finished product is NOT possible. Which settings do you make to achieve this?
A. Choose planning strategy 20 (Make-to-Order) and select the corresponding Mixed MRP indicator
B. Choose planning strategy 50 (Planning without final assembly) and select the corresponding Mixed MRP indicator
C. Choose planning strategy 20 (Make-to-Order) and select the corresponding Individual/Collective indicator
D. Choose planning strategy 50 (Planning without final assembly) and select the corresponding Individual/Collective indicator