CTAL-TM-001資格認定 & CTAL-TM-001問題と解答CTAL-TM-001問題集の品質を確かめ、この問題集はあなたに合うかどうかを確認することができるように、It-PassportsはCTAL-TM-001問題集の一部のダウンロードを無料で提供します。二つのバージョンのどちらでもダウンロードできますから、It-Passportsのサイトで検索してダウンロードすることができます。体験してから購入するかどうかを決めてください。そうすると、CTAL-TM-001問題集の品質を知らないままに問題集を購入してから後悔になることを避けることができます。 ISTQB Certified Tester Advanced Level - Test Manager 認定 CTAL-TM-001 試験問題 (Q152-Q157):質問 # 152
Your team has been assigned to lest a new product that is tightly integrated with existing systems The integrations include data transfers and transformations You have access to the architectural design documents and the integration specifications and some of your testers are former developers.
Given this information, what is the most appropriate test approach?
A. Risk-based and non-functional
B. Model-based and white-box
C. Requirements-based and functional
D. Experience-based and black-box
正解:B
解説:
* Context Analysis:
* The scenario involves tight integration, architectural design, and data transformations, requiring detailed and structured approaches.
* Access to architectural documents and experienced testers (former developers) aligns with model- based and white-box techniques.
* Evaluation of Options:
* A. Model-based and white-box:
* Correct. Model-based testing leverages design documents, while white-box testing uses internal knowledge for detailed integration testing.
* B. Experience-based and black-box:
* Incorrect. This is less structured and doesn't utilize available design documentation or tester expertise.
* C. Risk-based and non-functional:
* Incorrect. Risk-based testing focuses on high-priority areas but doesn't leverage the design documents for integration specifics.
* D. Requirements-based and functional:
* Incorrect. While functional testing is relevant, requirements-based testing does not utilize internal system knowledge effectively.
* Syllabus Alignment:
* ISTQB emphasizes model-based and white-box testing as appropriate for systems with complex integrations (TM-1.2.6).
References:
ISTQB Advanced Level Test Management Syllabus (TM-1.2.6)
質問 # 153
The introduction of reviews and inspections has often failed as a process improvement action. Identify the THREE most important measures that should be taken to reduce the risk that this test process improvement will fail. 2 Credits (for 2 out of 3 correct 1 credit)
A. Usage of a more traditional software development lifecycle
B. Alignment with software process improvement
C. Training of those involved
D. Using a reference model, e.g. TMMi
E. The availability of stands and processes
F. Management support
G. Process ownership and experienced moderators who drive the inspection process.
正解:C、F、G
質問 # 154
In what environment are you most likely to see multiple defect management systems used in one project?
A. Multi-tenant
B. Sequential
C. Agile
D. Hybrid
正解:D
解説:
Context Analysis:
A hybrid environment combines methodologies (e.g., Agile and traditional), often leading to multiple tools to manage different workflows, methodologies, or team needs.
Evaluation of Options:
A . Sequential:
Incorrect. Sequential approaches usually involve a single defect management system due to their linear nature.
B . Agile:
Incorrect. Agile projects often emphasize a single integrated tool for simplicity and collaboration.
C . Hybrid:
Correct. Multiple tools are typical in hybrid models to accommodate diverse team processes.
D . Multi-tenant:
Incorrect. Multi-tenancy relates to shared infrastructure, not the use of defect management systems.
Syllabus Alignment:
ISTQB mentions hybrid approaches leading to diverse tool requirements for managing defects across different methodologies (TM-1.2.4).
Reference:
ISTQB Advanced Level Test Management Syllabus (TM-1.2.4)
質問 # 155
Your test team is in the process of completing final regression testing one week before the release date. One of your staff has just uncovered a critical defect that causes data corruption.
What should you do? [2]
A. Update the weekly status charts and change the project status to red
B. Write a high priority defect and follow the escalation communication plan as defined in your test plan
C. Write a high priority defect and call the business stakeholders to warn them about it
D. Update the risks in your test plan to cover data corruption issues and update your test cases to be sure you test for this in the future
正解:B
解説:
The best action that you should take in this situation is to write a high priority defect and follow the escalation communication plan as defined in your test plan. This is because a critical defect that causes data corruption is a serious issue that can affect the quality, functionality, and reliability of the system, and it needs to be reported and resolved as soon as possible. By writing a high priority defect, you can document the details and the impact of the defect, and alert the development team and the project manager about it. By following the escalation communication plan, you can ensure that the defect is communicated to the appropriate stakeholders, such as the business sponsors, the customers, or the senior management, in a timely and effective manner, and that the necessary actions are taken to address the defect. Defect Reporting - ISTQB not-for-profit association References: Certified Tester Advanced Level Test Manager (CTAL-TM) - ISTQB not-for-profit association, ISTQB Test Manager Certification - ISTQB Exams Worldwide - ISTQB Official Registration, Defect Reporting - ISTQB not-for-profit association
質問 # 156
You are about to release a test progress report to a senior manager, who is not a test specialist. Which of the following topics should NOT be included in the test progress report? 1 credit
A. Detailed overview of the risk-based test approach being used to ensure the exit criteria to be achieved
B. Recommendations for taking controlling actions
C. Product risks which have been mitigated and those which are outstanding.
D. Status compared against the started exit criteria