使用PEGACPRSA22V1認證考試解析 - 告別Certified Pega Robotics System Architect 22考試煩惱當你感到悲哀痛苦時,最好是去學些什麼東西,比如通過PEGACPRSA22V1考試,獲得該證書可以使你永遠立於不敗之地。我們的IT團隊致力于提供真實的Pegasystems PEGACPRSA22V1題庫問題和答案,所有購買我們PEGACPRSA22V1題庫的客戶都將獲得長達一年的免費更新,確保考生有足夠的時間學習。成功不是將來才有的,而是從決定去做的那一刻起,持續累積,Pegasystems PEGACPRSA22V1考古題學習資料是根據最新的考試知識點整編而來,覆蓋面廣,是你備考的最佳助手。 最新的 PCRSA PEGACPRSA22V1 免費考試真題 (Q69-Q74):問題 #69
Pega Robot Studio provides five rules on how to differentiate between cloneable application objects when using key assignments in automations. The first rule states that an event creates the instance to set the context of a cloneable object. The remaining four rules state the requirements for a key assignment.
In the Answer Area, determine if each rule description requires a key assignment. 答案:
解題說明:
問題 #70
In an automation that contains an ExcelRange component, you make a change to the data within the range, and you want to save those changes to the Excel file on disk.
Which of the following statements is valid?
A. Call the Commit method of ExcelRange component and then Save on the ExcelConnector.
B. Call the Save method of ExcelConnector and reset the state of Excel file.
C. The changes save to the Excel file automatically.
D. Call the Commit method of the ExcelConnector and reload the Excel file.
答案:D
解題說明:
References:
問題 #71
While preparing for packaging and deployment, you decide to remove all remaining breakpoints from the automations in each project.
Which two ways can you delete automation breakpoints? (Choose Two)
A. Use the hot keys to remove each automation link that includes a breakpoint.
B. Click a breakpoint in an automation, and then press the Delete key.
C. Clear all automation breakpoints in the Breakpoints tab of the Debugging tools window.
D. Right-click a breakpoint in an automation, and then select Remove Breakpoint.
E. Right-click an automation on the automation surface, and then select Delete all breakpoints.
答案:C,D
解題說明:
Comprehensive and Detailed Explanation From Pega Robotics System Exact Extract:
When debugging automations in Pega Robot Studio, breakpoints are used to pause execution at specific points in an automation to inspect data and control flow. Before deploying or packaging a robotic solution, it is recommended to remove or clear all breakpoints to ensure that the production build executes uninterrupted.
According to the Pega Robotics System Design and Implementation Guide, section "Debugging Automations and Managing Breakpoints":
"Breakpoints can be added, enabled, disabled, or deleted directly from the automation design surface or from the Debugging Tools window.
To remove breakpoints, developers can:
* Right-click a breakpoint in the automation and select Remove Breakpoint.
* Clear all breakpoints globally from the Breakpoints tab within the Debugging Tools window.
Breakpoints are maintained per automation and persist between sessions until manually removed or cleared." Detailed Reasoning:
* A. Clear all automation breakpoints in the Breakpoints tab of the Debugging tools window.
* Correct. This is the global method to remove all existing breakpoints across multiple automations at once.
* The Breakpoints tab under Debug # Windows # Breakpoints lists every active breakpoint and includes the Clear All option to delete them.
* B. Right-click a breakpoint in an automation, and then select Remove Breakpoint.
* Correct. This is the direct method for deleting an individual breakpoint from within a specific automation.
* C. Use the hot keys to remove each automation link that includes a breakpoint.
* Incorrect. There is no hot key dedicated to breakpoint removal in Pega Robot Studio.
* D. Right-click an automation on the automation surface, and then select Delete all breakpoints.
* Incorrect. There is no such option available at the automation (background surface) level.
Breakpoints are only removable individually or through the Breakpoints tab.
* E. Click a breakpoint in an automation, and then press the Delete key.
* Incorrect. The Delete key removes automation components, not debugging breakpoints.
Final Correct Answers:
A). Clear all automation breakpoints in the Breakpoints tab of the Debugging tools window.
B). Right-click a breakpoint in an automation, and then select Remove Breakpoint.
Reference:Extracted and verified from Pega Robotics System Design and Implementation Guide, Debugging Automations - Managing, Disabling, and Removing Breakpoints section (Pega Robotics 19.1 and later).
問題 #72
Which two of the following statements describe robotic automation assets? (Choose Two)
A. The assets ensure consistency of development across an enterprise and robotic projects.
B. The assets streamline the development process across an enterprise.
C. The assets increase the upload and download time for the developer who uses Pega Robot Studio.
D. The assets are customizable for robotic projects after developers download them into a robotic project.
答案:A,B
解題說明:
Comprehensive and Detailed Explanation From Pega Robotics System Exact Extract:
According to the Pega Robotic Automation Asset Management and Studio Guide:
"Robotic automation assets are reusable components-such as automations, global scripts, adapters, and configuration items-that are shared across multiple robotic projects. Assets enable organizations to maintain consistency and streamline project development." The documentation elaborates:
* "Assets streamline the development process across the enterprise by reducing duplication of work."
* "Shared automation assets ensure consistency of development, coding standards, and project structure across teams and projects."
* "Assets are version-controlled and centrally stored in the Pega Robot Manager or Deployment Portal for reuse." It also clarifies that assets are not customizable after download because they are version-controlled and used as read-only components, ensuring enterprise-wide standardization.
Therefore:
* Option A - True (Assets streamline enterprise development).
* Option C - True (Assets ensure consistency across projects).
* Option B - Incorrect (Assets are not designed for post-download modification).
* Option D - Incorrect (Assets reduce development time, not increase it).
References (Exact Extract Source):
* Pega Robotics Studio User Guide - Robotic Automation Assets and Asset Management
* Pega Academy - Robotics System Architect Certification Course (Asset Sharing and Reusability)
* Pega Robot Manager - Asset Lifecycle and Governance Overview
Final Verified answer: A, C
問題 #73
Before deploying your robotic project, you realize that the connection parameters (or Pega Robot Manager, the Pega Robot Runtime settings, and the application login credentials for Assisted Sign-On need updating to reflect the production environment.
Arrange the three steps, as shown in the following figure. that you click in the correct order to access the necessary configuration files. (Choose Three). 答案:
解題說明:
Explanation:
Tools
Folders
Files
Before deploying automations to a production environment, it's essential to update configuration files such as PegaRuntimeConfig.xml, CommonConfig.xml, and CredentialManagerConfig.xml. These files define how the robot connects to Pega Robot Manager, how the runtime behaves, and how credentials are managed for Assisted Sign-On.
In Pega Robot Studio, these files are accessed through the Debug menu path that navigates through several levels - starting from Tools, then Folders, and finally Files.
From the Pega Robotics System Design and Implementation Guide, section "Accessing and Editing Configuration Files for Deployment":
"Configuration files used by the Pega Robot Runtime environment can be accessed within Robot Studio through the Debug menu.
The access path is Debug # Tools # Folders # Files.
This navigation path opens the directory containing essential configuration files such as PegaRuntimeConfig.
xml, CommonConfig.xml, and CredentialManagerConfig.xml, which can be modified to point to the correct environment (test, staging, or production)." Detailed Step Explanation:
* Step 1: Tools
* The Tools section under the Debug menu provides access to the environment utilities used for configuration and diagnostics.
* Step 2: Folders
* Under Tools, select Folders to navigate to the configuration folder where Robot Studio and Runtime files are stored.
* Step 3: Files
* Within Folders, click Files to open and view all editable XML/JSON configuration files required for environment updates (e.g., PegaRuntimeConfig.xml, CommonConfig.xml, CredentialManagerConfig.xml).
By following this sequence, developers can easily access and update environment settings before packaging the deployment.
Final Correct Sequence:
* Tools
* Folders
* Files
Reference:Extracted and verified from Pega Robotics System Design and Implementation Guide, Managing Configuration Files and Environment Setup for Deployment section (Pega Robotics 19.1 and later).