1z0-1066-25最新題庫,1z0-1066-25熱門證照還在為怎樣才能順利通過Oracle 1z0-1066-25 認證考試而苦惱嗎?還在苦苦等待Oracle 1z0-1066-25 認證考試的最新資料嗎?KaoGuTi研究出了最新的Oracle 1z0-1066-25 認證考試相關資料。想通過Oracle 1z0-1066-25 認證考試考試嗎?快將KaoGuTi的Oracle 1z0-1066-25認證考試的最新練習題及答案加入你的購物車吧!KaoGuTi已經在網站上為你免費提供部分Oracle 1z0-1066-25 認證考試的練習題和答案,你可以免費下載作為嘗試。相信你對我們的產品會很滿意的。利用它你可以很輕鬆地通過考試。我們承諾,如果你使用了KaoGuTi的最新的Oracle 1z0-1066-25 認證考試練習題和答案卻考試失敗,KaoGuTi將會全額退款給你。 最新的 Oracle Cloud 1z0-1066-25 免費考試真題 (Q96-Q101):問題 #96
Which two are valid settings when defining a replenishment planning cluster?
A. Reserved safety stock percentage (optional)
B. Sweep location (required)
C. Location hierarchy (required)
D. Source system (required)
答案:C,D
解題說明:
When setting up a replenishment planning cluster, the location hierarchy is necessary for structuring replenishment relationships, while specifying a reserved safety stock percentage is optional. The Source system setting is not required within the cluster definition context but is typically a part of the broader replenishment configuration ORACLE
問題 #97
Your client wants to exclude all of the inventory from the 'Reject' subinventory from only one of their supply plans. What action must be taken to meet this requirement?
A. Manage Plans > Search and select supply plans > 'Organizations and Schedules' tab > 'Supply Schedules' > 'Subinventory Netting' > Deselect 'Reject' subinventory for each organization
B. Manage Subinventories > Search and select subinventory > Deselect 'Nettable'
C. Manage Subinventories > Choose a material status in which 'Nettable' is unchecked
D. Manage Plans > Search and select supply plans > 'Organizations and Schedules' tab > 'Organizations' >
'Subinventory Netting' > Deselect 'Reject' subinventory for each organization
E. It is not possible to exclude one subinventory from a particular supply plan.
答案:D
問題 #98
Your customer has seasonal demand and wants to generate forecast for next six months. You ran a demand plan for first time using six months of shipments history but the forecast accuracy was low.
Identify two statements that are true in this scenario. (Choose two.)
A. Running a demand plan with both shipments and seasonal shipments forecast profile is required to forecast seasonal demand.
B. Running a demand plan with six months of booking history instead of six months of shipment history is required for seasonal demand.
C. Running a demand plan with 18 to 36 months of shipments history is recommended.
D. Running a demand plan with less than one year of history will impact seasonal analysis.
E. Running a demand plan with both shipments and booking forecast profile is required to forecast seasonal demand.
答案:B,C
問題 #99
Your buyers are very attentive in maintaining the approved supplier lists as needed. One of your planners regularly uses the portal to communicate with some of their key suppliers and has noticed that the publication process is taking a lot longer to complete because the business has grown. The planner is also complaining that the collaboration candidates' list is cluttered with items that are not yet required.
Which two steps should you take to address the planner's complaint?
A. Activate the "Ignore for Supplier Collaboration" item attribute.
B. Activate a Supply Chain Collaboration setting to ignore zero forecast combinations.
C. Disable the decomposition and generate candidates' parameters in the Publish Order Forecast scheduled process.
D. Activate a profile option called "Publish Order Forecast Using Sourcing Rules".
答案:C,D
解題說明:
To improve performance and reduce unnecessary items in the collaboration candidates list, you can activate settings to ignore zero forecast combinations, which prevents items with no forecast from appearing in the candidates list. Additionally, activating the "Ignore for Supplier Collaboration" attribute for specific items ensures that these are excluded from supplier collaboration processes, streamlining the list to relevant items only. These options help in managing supply collaboration settings efficiently and are verified in Oracle documentation on Supply Chain Collaboration and Publish Order Forecast processes
問題 #100
Planner 1 works in Europe and needs to see three measures in kilograms (the default UOM). Planner 2 is US- based and needs to see those same three measures in pounds. Both planners need to use five tables in their plan analyses on a regular basis. At the moment, all five tables are displayed in kilograms.
Which two options would most efficiently address this requirement?
A. There is no efficient solution to this requirement.
B. Duplicate all five tables, then format the three measures in the copied tables to be displayed in pounds.
C. Open each table and format measures to duplicate the three measures and then format the duplicated measures to be displayed in pounds.
D. Create duplicates of the three measures in Manage Planning Measures and change each new measure's UOM from kilograms to pounds, then duplicate the five tables but use the new measures.
E. Planner 2 opens a table, formats each measure to be displayed in pounds. When Planner 1 opens the same table, they reformat back to be displayed in kilograms.
答案:C,D
解題說明:
The most efficient way to accommodate both planners' needs is to create duplicates of the required measures in pounds and then duplicate the tables to include the reformatted measures. This allows both planners to access tables in their preferred units without repetitive reformatting MY ORACLE SUPPORT