Firefly Open Source Community

   Login   |   Register   |
New_Topic
Print Previous Topic Next Topic

Latest C_TS422_2023 Test Practice - 100% Pass-Sure Questions Pool

140

Credits

0

Prestige

0

Contribution

registered members

Rank: 2

Credits
140

Latest C_TS422_2023 Test Practice - 100% Pass-Sure Questions Pool

Posted at yesterday 17:02      View:18 | Replies:0        Print      Only Author   [Copy Link] 1#
BTW, DOWNLOAD part of TestInsides C_TS422_2023 dumps from Cloud Storage: https://drive.google.com/open?id=19bkZzQLUQ067-W9qbc51k7oCsruitHFi
The latest SAP S/4HANA Cloud Private Edition - Production Planning and Manufacturing C_TS422_2023 exam and exam study guide is reliable, SAP S/4HANA Cloud Private Edition - Production Planning and Manufacturing C_TS422_2023 with reasonable exam price and guaranteed questions answers. SAP offers actual SAP S/4HANA Cloud Private Edition - Production Planning and Manufacturing to sure your success in C_TS422_2023 Exam. Don't worry, this SAP S/4HANA Cloud Private Edition - Production Planning and Manufacturing C_TS422_2023 test price is benefit and content is 365 days updates!
SAP C_TS422_2023 Exam Syllabus Topics:
TopicDetails
Topic 1
  • Capacity Planning in SAP S
  • 4HANA: This section covers a discussion of SAP S
  • 4HANA best practices, SAP HANA database concept, SAP Fiori user experience, and embedded analytics capabilities.
Topic 2
  • Material Requirements Planning in SAP S
  • 4HANA: This part of the exam covers an examination of planning strategies, tools, and long-term planning concepts. Overview of MRP fundamentals and lot size procedures.
Topic 3
  • Master Data in SAP S
  • 4HANA: This section covers the exploration of crucial production-related master data elements, with emphasis on bill of material, routing, and production version.
Topic 4
  • Production Orders in SAP S
  • 4HANA: This section covers BOM item categorization, order status management, availability checks, routing selection, order type setup, and material handling processes.
Topic 5
  • Lean Manufacturing in SAP S
  • 4HANA: This section covers repetitive manufacturing master data, line load planning, and Kanban systems.
Topic 6
  • Introduction to SAP S
  • 4HANA Supply Chain Planning: This part covers the background and motivation for SAP S
  • 4HANA, its main components, business applications, and user experience strategy.
Topic 7
  • Managing Clean Core: This section covers the application of clean core principles to enhance business process agility, reduce adaptation efforts, and drive innovation in ERP systems.
Topic 8
  • Demand Management in SAP S
  • 4HANA: This section covers a comparison of production methods in various manufacturing environments.

Quiz SAP - C_TS422_2023 - Updated Latest SAP S/4HANA Cloud Private Edition - Production Planning and Manufacturing Test PracticeDo you think it is difficult to success? Do you think it is difficult to pass IT certification exam? Are you worrying about how to pass SAP C_TS422_2023 exam? I think it is completely unnecessary. IT certification exam is not mysterious as you think and we can make use of learning tools to pass the exam. As long as you choose the proper learning tools, success is a simple matter. Do you want to know what tools is the best? TestInsides SAP C_TS422_2023 Practice Test materials are your best learning tools. TestInsides exam dumps collect and analysis many outstanding questions that have come up in the past exam. According to the latest syllabus, the dumps add many new questions and it can guarantee you pass the exam at the first attempt.
SAP S/4HANA Cloud Private Edition - Production Planning and Manufacturing Sample Questions (Q77-Q82):NEW QUESTION # 77
Mode selection is one of the scheduling options available with Advanced Planning in SAP S/4HANA Cloud Private Edition. When can you use mode selection?
  • A. When several operations are maintained for one product
  • B. When several production versions are maintained for one product
  • C. When multiple planned orders are scheduled in parallel on one resource
  • D. When alternative resources are used within one operation
Answer: D
Explanation:
In SAP S/4HANA PP/DS,mode selectionrefers to choosing between alternative production modes (combinations of resources and recipes) within detailed scheduling (e.g., /SAPAPO/CDPS0 or heuristics). It is used:
* When alternative resources are used within one operation(B): In the PP/DS resource (mapped from work center, CR02) and operation (routing, CA02), modes define different resource options (e.g., Machine A vs. Machine B) for the same operation. Mode selection (configured in the PPM or PDS,
/SAPAPO/RES01) allows PP/DS to pick the best resource based on availability, priority (Mode Priority field), or cost during scheduling.
Several operations for one product(A) involves operation sequencing, not mode selection.Several production versions(C) (MRP 4 view) define BOM/routing combinations at the material level, not within an operation.
Multiple planned orders in parallel(D) relates to resource loading, not mode-specific choices. This is per SAP' s PP/DS scheduling options.

NEW QUESTION # 78
which actions does the system perform by default when you save a confirmation for a finished product in repetitive manufacturing?
Note: There are 3 Correct answers to this question.
  • A. Material staging for next order in sequence
  • B. Archiving of document for assembly scrap
  • C. Posting of production costs to the production cost collector
  • D. posting of goods receipt for the product
  • E. Reduction of associated capacity requirements
Answer: C,D,E
Explanation:
When you save a confirmation for a finished product in repetitive manufacturing, the system performs the following actions by default12:
Posting of production costs to the production cost collector: The system calculates the actual costs for the confirmed quantity and posts them to the production cost collector assigned to the product. The production cost collector is a cost object that collects the costs for all confirmations of a product in a plant for a period.
Posting of goods receipt for the product: The system posts the confirmed quantity as a goods receipt to the warehouse. The product is valuated at the standard price defined in the material master record. The difference between the standard price and the actual costs is posted to a price difference account.
Reduction of associated capacity requirements: The system reduces the capacity requirements for the work center where the confirmation was made. The capacity requirements are calculated based on the confirmed quantity and the standard values for setup, machine, and labor time in the routing. Reference: 1: Repetitive Manufacturing Confirmation | SAP Help Portal(https://help.sap.com/docs/SAP_S4 ... 1f300a04ae24ac.html)2: Confirming Production in Repetitive Manufacturing | SAP Help Portal(https://help.sap.com/docs/SAP_S4 ... 0000000a44538d.html).

NEW QUESTION # 79
Which of the following processes lead to an entry in the MRP planning file? Note: There are 2 correct answers to this question.
  • A. Changing the storage bin in warehouse management
  • B. Changing the stock in inventory management
  • C. Changing the procurement type in the product master
  • D. Changing the delivery address in transportation management
Answer: B,C
Explanation:
In SAP S/4HANA, the MRP planning file (table MDVM, visible via MD05) tracks changes that trigger MRP to re-evaluate a material's planning situation. Entries are created when:
* Changing the procurement type in the product master(C): The procurement type (material master, MRP
2 view, field: Procurement Type) determines whether a material is produced in-house ("E"), procured externally ("F"), or both ("X"). Changing it (e.g., via MM02) affects how MRP generates planned orders or purchase requisitions, so an entry is added to the planning file (e.g., NETCH or NETPL indicator) to prompt recalculation.
* Changing the stock in inventory management(D): Any stock change (e.g., goods receipt via MIGO, goods issue via MB1A) updates the available stock (MD04). This triggers an MRP planning file entry because it alters the net requirements calculation, requiring MRP (MD01/MD02) to reassess supply versus demand.
Changing the delivery address in transportation management(A) affects logistics execution (e.g., shipment documents), not MRP planning directly-no entry is created.Changing the storage bin in warehouse management(B) (e.g., via LT10) is a WM-level movement that doesn't impact MRP unless stock quantity changes, which falls under (D). This is per SAP's MRP planning file logic.

NEW QUESTION # 80
You want to reduce planning efforts for B C classified materials. Which planning procedure do you recommend?
  • A. Material Requirements Planning
  • B. Advanced Planning
  • C. Subassembly Planning
  • D. Consumption Based Planning
Answer: D

NEW QUESTION # 81
What are the possible results of a production planning run in Advanced Planning (PP/DS)? Note: There are 2 correct answers to this question.
  • A. Purchase Order
  • B. Production Order
  • C. Scheduling agreement schedule line
  • D. Planned Order
Answer: B,D
Explanation:
A production planning run in Advanced Planning (PP/DS) is a process that optimizes the supply and demand situation for a set of materials and locations within a given planning horizon. The possible results of a production planning run are:
Planned Order: A planned order is a proposal for internal production or external procurement of a material. A planned order can be converted into a production order or a purchase order, depending on the source of supply. A planned order can also be firmed, which means that it is not changed or deleted by subsequent planning runs.
Production Order: A production order is a document that defines the operations, materials, resources, and costs required to produce a material. A production order is created from a planned order or directly by the user. A production order can be released, confirmed, and settled as part of the production process. Reference: [SAP S/4HANA Production Planning and Manufacturing Certification Guide], page 181; [SAP Help Portal: Production Planning Run].

NEW QUESTION # 82
......
Our SAP C_TS422_2023 practice materials compiled by the most professional experts can offer you with high quality and accuracy SAP S/4HANA Cloud Private Edition - Production Planning and Manufacturing C_TS422_2023 practice materials for your success. Up to now, we have more than tens of thousands of customers around the world supporting our SAP exam torrent.
Practice C_TS422_2023 Test Engine: https://www.testinsides.top/C_TS422_2023-dumps-review.html
BONUS!!! Download part of TestInsides C_TS422_2023 dumps for free: https://drive.google.com/open?id=19bkZzQLUQ067-W9qbc51k7oCsruitHFi
Reply

Use props Report

You need to log in before you can reply Login | Register

This forum Credits Rules

Quick Reply Back to top Back to list