Firefly Open Source Community

   Login   |   Register   |
New_Topic
Print Previous Topic Next Topic

[General] C-TS422-2023 Reliable Exam Pdf - C-TS422-2023 Dumps Torrent

131

Credits

0

Prestige

0

Contribution

registered members

Rank: 2

Credits
131

【General】 C-TS422-2023 Reliable Exam Pdf - C-TS422-2023 Dumps Torrent

Posted at before yesterday 10:04      View:9 | Replies:0        Print      Only Author   [Copy Link] 1#
DOWNLOAD the newest TopExamCollection C-TS422-2023 PDF dumps from Cloud Storage for free: https://drive.google.com/open?id=14_t1UTSGqOALhJ1zww4_r10hZf_zkEoj
TopExamCollection publishes SAP C-TS422-2023 reliable practice exam vce online which is nearly 98% similar with the real test. It is not only providing you valid questions and answers but also simulate scene like the real test. If you have bad mood while testing, you can choose to practice many times with C-TS422-2023 reliable practice exam vce online, you will be used in exam feel, have a strong psychological diathesis, and finally get out of examination-phobia.
SAP C-TS422-2023 Exam Syllabus Topics:
TopicDetails
Topic 1
  • Advanced Planning in SAP S
  • 4HANA: This section includes an overview of advanced planning fundamentals and master data. Explanation of key tools and processes. Discussion of planning evaluation concepts.
Topic 2
  • Process Orders in SAP S
  • 4HANA: This section covers an introduction to process order components, processing, and relevant master data objects. Overview of Good Manufacturing Practices (GMP) features.
Topic 3
  • Managing Clean Core: This section covers the application of clean core principles to enhance business process agility, reduce adaptation efforts, and drive innovation in ERP systems.
Topic 4
  • Production Orders in SAP S
  • 4HANA: This section covers BOM item categorization, order status management, availability checks, routing selection, order type setup, and material handling processes.
Topic 5
  • Introduction to SAP S
  • 4HANA Production Planning: This section covers an overview of production planning components, functions, and planning approaches. Exploration of emerging trends.
Topic 6
  • Demand Management in SAP S
  • 4HANA: This section covers a comparison of production methods in various manufacturing environments.

Quiz SAP - C-TS422-2023 - SAP S/4HANA Cloud Private Edition - Production Planning and Manufacturing Accurate Reliable Exam PdfWith the principles of serve first and customers first, we will company you during you whole preparation. We offer you free demo before buying C-TS422-2023 exam dumps of us, and you can get your downloading link and password when you finish your payment. And you can get them about ten minutes after your payment. What’s more, we have free update for one year after purchasing, and the updated version will send to your email automatically. If you have any questions about the C-TS422-2023 Exam Dumps, you can consult our online service stuff.
SAP S/4HANA Cloud Private Edition - Production Planning and Manufacturing Sample Questions (Q19-Q24):NEW QUESTION # 19
You are trying to create a production order, but NO valid production version can be selected. What could be the reasons? Note: There are 2 correct answers to this question.
  • A. NO production lines are assigned to the production versions.
  • B. NO bills of material (BOMs) are assigned to the production versions.
  • C. The order lot size is NOT within the validity range of a production version.
  • D. All production versions for the material are locked.
Answer: C,D
Explanation:
In SAP S/4HANA, a production order (transaction CO01) requires a valid production version (material master, MRP 4 view). If none can be selected, possible reasons include:
* The order lot size is NOT within the validity range of a production version(A): Each production version specifies a lot size range (e.g., 100-1000 units). If the order quantity (entered in CO01) falls outside this range, the version is invalid, and the system cannot select it.
* All production versions for the material are locked(C): If production versions are locked (MRP 4 view, field: Lock indicator), they are excluded from planning and order creation, even if otherwise valid, preventing selection.
NO production lines assigned(B) is irrelevant-production versions link BOMs and routings, not production lines (a repetitive manufacturing concept).NO BOMs assigned(D) would invalidate a version, but the system checks BOM validity within the version, and this is typically caught during version creation (C223), not order creation. This is per SAP's production version validation rules.

NEW QUESTION # 20
What are some benefits of planning with planned independent requirements for finished materials? Note: There are 2 correct answers to this question.
  • A. Option to use maketoorder production
  • B. Reduced times for final assembly
  • C. Reduced delivery times
  • D. Option to forecast planning for production resources
Answer: B,C

NEW QUESTION # 21
What determines whether the planned independent requirements in dem management are consumed by other requirements? Note: There are 2 correct answers to this question.
  • A. Order type
  • B. Requirements profile
  • C. Requirements type
  • D. Planning strategy
Answer: C,D

NEW QUESTION # 22
What will happen in the MRP run if you have created a new MRP-relevant material that supports both in- house production and external procurement?
  • A. The MRP run assumes in-house production.
  • B. The MRP run does NOT consider the material; it has to be planned interactively.
  • C. The MRP run assumes external procurement.
  • D. The MRP run plans the material only if a quotation has been maintained.
Answer: A
Explanation:
When a new MRP-relevant material in SAP S/4HANA supports both in-house production and external procurement (procurement type "X" in the MRP 2 view), MRP defaults to a specific behavior unless overridden by additional settings (e.g., source list, quota arrangement). By default,the MRP run assumes in- house production(B). This is because SAP's standard logic prioritizes in-house production (procurement type
"E") over external procurement ("F") when both are possible,unless a valid source of supply (e.g., scheduling agreement, contract) explicitly directs it to external procurement.
Option A is incorrect because external procurement requires a source list or quota arrangement to take precedence. Option C is false, as quotations are not a prerequisite for MRP planning; they are optional for external procurement. Option D is also incorrect-MRP will plan the material automatically based on its master data, not require interactive planning. This behavior is documented in SAP's MRP processing rules.

NEW QUESTION # 23
You want to set up a make-to-order planning scenario for a finished product. The bill of material contains two components: one should be procured for each sales order individually, and the other should be procured jointly for all independent requirements. Forecasting for the finished product is NOT possible. Which settings do you make to achieve this?
  • A. Choose planning strategy 20 (Make-to-Order) and select the corresponding Individual/Collective indicator.
  • B. Choose planning strategy 50 (Planning without final assembly) and select the corresponding Mixed MRP indicator.
  • C. Choose planning strategy 50 (Planning without final assembly) and select the corresponding Individual
    /Collective indicator.
  • D. Choose planning strategy 20 (Make-to-Order) and select the corresponding Mixed MRP indicator.
Answer: A
Explanation:
For a make-to-order (MTO) scenario in SAP S/4HANA without forecasting, where components have different procurement behaviors:
* Choose planning strategy 20 (Make-to-Order) and select the corresponding Individual/Collective indicator(D): Strategy 20 (material master, MRP 3 view, Strategy Group: 20) is pure MTO, where production is triggered by sales orders (VA01) without PIRs-fitting the "no forecasting" requirement.
TheIndividual/Collective indicator(material master, MRP 4 view, field: Ind./Coll.) is set to "1" (Individual Requirements) for the component procured per sales order, generating separate dependent requirements per order, and "2" (Collective Requirements) for the component procured jointly, aggregating requirements across all orders into a single planned order or requisition.
Planning strategy 50 (Planning without final assembly)(A, C) relies on PIRs for subassemblies, conflicting with the "no forecasting" condition.Mixed MRP indicator(B, C) (MRP 4 view) applies to mixed MTS/MTO scenarios (e.g., strategy 11), not pure MTO, and doesn't address the individual/collective split directly.
Strategy 20 with the indicator meets SAP's MTO configuration standards.

NEW QUESTION # 24
......
Once you have practiced and experienced the quality of our C-TS422-2023 exam preparation, you will remember the serviceability and usefulness of them. For the excellent quality of our C-TS422-2023 training questions explains why our C-TS422-2023 practice materials helped over 98 percent of exam candidates get the certificate you dream of successfully. Believe me with our C-TS422-2023 Guide quiz, you will be more confident to pass the exam in the shortest time with ease.
C-TS422-2023 Dumps Torrent: https://www.topexamcollection.com/C-TS422-2023-vce-collection.html
2026 Latest TopExamCollection C-TS422-2023 PDF Dumps and C-TS422-2023 Exam Engine Free Share: https://drive.google.com/open?id=14_t1UTSGqOALhJ1zww4_r10hZf_zkEoj
Reply

Use props Report

You need to log in before you can reply Login | Register

This forum Credits Rules

Quick Reply Back to top Back to list