【General】 CDCS Pass Guarantee & CDCS Demo Test

Posted at yesterday 10:16      View:9 | Replies:0        Print      Only Author   [Copy Link] 1#
DOWNLOAD the newest itPass4sure CDCS PDF dumps from Cloud Storage for free: https://drive.google.com/open?id=1w0j3X8NrnKJohxfV1pwYWkgo8PTSl7Mq
Each question and answer of our CDCS training questions are researched and verified by the industry experts. Our team updates the CDCS certification material periodically and the updates include all the questions in the past thesis and the latest knowledge points. So our service team is professional and top-tanking on the CDCS Exam braindump. And if you have any questions on our study guide, our services will help you with the right and helpful suggestions. Just have a try on our CDCS learning prep!
EXIN CDCS Exam Syllabus Topics:
TopicDetails
Topic 1
  • Designing and Implementing a Data Centre: In this module, the exam assesses the knowledge of Exin data center professionals tasked with the design and implementation of data centers. Candidates will learn the key principles of creating an efficient data center layout, including considerations for scalability, redundancy, and security.
Topic 2
  • Data Centre Life Cycle and Standards: This section of the exam measures the skills of data center professionals and covers the various stages involved in the life cycle of a data center, from planning and design to implementation and decommissioning.
Topic 3
  • Data Centre Environmental Considerations and Efficiency: This section evaluates the proficiency of data center professionals in addressing environmental factors and promoting efficiency within data center operations. The target audience, including data center managers and engineers, will be tested on their ability to identify and implement measures that enhance energy efficiency, cooling management, and sustainable practices.

Perfect 100% Free CDCS – 100% Free Pass Guarantee | CDCS Demo TestAll CDCS online tests begin somewhere, and that is what the CDCS training course will do for you: create a foundation to build on. Study guides are essentially a detailed CDCS tutorial and are great introductions to new CDCS training courses as you advance. The content is always relevant, and compound again to make you pass your CDCS Exams on the first attempt. You will frequently find these CDCS PDF files downloadable and can then archive or print them for extra reading or studying on-the-go.
EXIN EPI Certified Data Centre Specialist Sample Questions (Q97-Q102):NEW QUESTION # 97
The humidity in the computer room has increased from about 60% up to 85% Relative Humidity (RH). What potential risk does this pose to your equipment?
  • A. The electrostatic discharge (ESD) levels will go up
  • B. No risks at all
  • C. The risk of excessive wear and corrosion will increase
  • D. There will be a cooling risk due to a high wet bulb temperature
Answer: C
Explanation:
High relative humidity (above 80%) creates a serious risk for corrosion of electronic contacts, printed circuit boards (PCBs), and metallic components. Moisture in the air condenses more easily, especially when surfaces are cooler than ambient dew point. This can lead to oxidation of connectors, degradation of solder joints, and eventual failures in ICT hardware.
Electrostatic discharge (ESD) risks, by contrast, increase at low humidity (below 30%) because dry air promotes charge buildup. Therefore, option C is incorrect here. Similarly, option D (cooling risk from wet- bulb temperature) applies to evaporative cooling efficiency, not directly to ICT risk.
ASHRAE recommends data centers maintain RH between 40-60% for optimal reliability. Values above 80% RH are considered outside the recommended operating envelope and significantly increase the risk of corrosion, especially in the presence of airborne contaminants like sulfur dioxide (SO#) or hydrogen sulfide (H#S).
Therefore, the verified risk at 85% RH is corrosion-related degradation.
References: ASHRAE TC 9.9 Thermal Guidelines (2016 Edition, Table 4.1), IEC 60721-3-3 Environmental Conditions for ICT Equipment.

NEW QUESTION # 98
Which formula is correct?
  • A. Phase-to-Neutral Voltage = Phase-to-Phase voltage * 1.732
  • B. Phase-to-Neutral Voltage = (Phase-to-Phase voltage * 1.732) / Phase-to-Neutral Voltage
  • C. Phase-to-Neutral Voltage = Phase-to-Neutral voltage * 1.732
  • D. Phase-to-Neutral Voltage = Phase-to-Phase voltage /1.732
Answer: D
Explanation:
The correct formula for calculating Phase-to-Neutral Voltage in a three-phase power system is Phase-to- Neutral Voltage = Phase-to-Phase Voltage / 1.732. This formula applies to balanced three-phase systems, where 1.732 (or #3) represents the relationship between line-to-line and line-to-neutral voltages.
Detailed Explanation:
In three-phase systems, Phase-to-Phase Voltage is higher than Phase-to-Neutral Voltage by a factor of #3.
Dividing the phase-to-phase voltage by 1.732 gives the phase-to-neutral voltage, which is critical for understanding power distribution in three-phase electrical systems commonly found in data centers.
EPI Data Center Specialist References:
EPI electrical training highlights the importance of knowing these calculations for designing and maintaining balanced power systems, which are essential for stable and efficient data center operations.

NEW QUESTION # 99
A data center is located in an area where the demand for power is higher than the utility power company is able to deliver. This results in frequent power outages and, therefore, power shedding (scheduled/controlled power shutdown for areas) is frequently applied. The mains power is more than 650 hours/year not available.
What type of generators should be installed?
  • A. Continuous generators should be installed, at least in an N+1 configuration
  • B. Standby generators should be installed in at least an N+1 configuration
  • C. Continuous generators should be installed; no N+1 configuration is needed as the generators will run all the time
  • D. A combination of standby-, prime-, and continuous-generators, as the duration of the power outage is unpredictable. The total available capacity of the generators should be at least 500% of the data center load
Answer: A
Explanation:
In areas with frequent and extended power outages, continuous generators with at least an N+1 configuration are necessary to ensure consistent power availability. Continuous generators are designed for prolonged operation, making them suitable for scenarios where utility power is frequently unavailable, as in this case with outages exceeding 650 hours per year. An N+1 configuration ensures redundancy, which is critical for maintaining uptime in a high-availability data center.
Detailed Explanation:
Continuous generators provide reliable power over long durations, unlike standby generators, which are intended only for short-term use. The N+1 configuration ensures that there is always an additional generator available in case of failure, thus maintaining power supply even if one generator goes offline.
EPI Data Center Specialist References:
EPI best practices recommend continuous generators with redundancy for data centers located in areas with high power instability to maintain reliability and continuous operation.

NEW QUESTION # 100
You are installing new copper cabling.
What is the advantage or disadvantage of choosing pre-terminated category 6 or 6A cabling?
  • A. There is no advantage as most new copper cabling network designs are based on category 3 or 5E for horizontal cabling.
  • B. Pre-terminated cabling makes ordering of the copper cables more complex, as you need to know in advance on which side the male or female connector needs to be located.
  • C. Pre-terminated cabling has a higher fire rating.
  • D. Pre-terminated cabling is already factory tested and saves installation time.
Answer: D
Explanation:
Choosing pre-terminated category 6 or 6A cabling provides several advantages, primarily related to time savings and reliability. Since pre-terminated cables are factory tested, they ensure consistent quality and performance, reducing the need for additional testing during installation. This makes installation faster and more efficient, which can significantly reduce labor costs and deployment times.
Detailed Explanation:
Pre-terminated cabling systems are manufactured and tested in controlled environments, which ensures they meet industry standards for performance. This factory testing process minimizes the likelihood of faults, reducing the need for troubleshooting and retesting on-site. Moreover, pre-terminated solutions can help to streamline installations because they eliminate the need for on-site terminations, which can be time-consuming and require skilled labor.
This is especially beneficial for data centers, where rapid deployment and minimizing potential points of failure are critical to maintaining uptime. However, it is important to note that pre-terminated cables require accurate planning, as lengths and connector configurations must be predetermined.
EPI Data Center Specialist References:
According to EPI Data Center Specialist guidelines, pre-terminated cabling is advantageous in data center environments due to reduced installation time and enhanced reliability from factory testing. These attributes align with best practices for efficient data center management, where maintaining performance and minimizing downtime are priorities.

NEW QUESTION # 101
What is the main disadvantage of using a ToR (Top of Rack) design?
  • A. A ToR (Top of Rack) switch has only optical interfaces.
  • B. You need a separate rack to install all your ToR (Top of Rack) switches.
  • C. A single ToR (Top of Rack) switch is more expensive than an EoR (End of Row) switch.
  • D. There will be more switches to manage.
Answer: D
Explanation:
A Top of Rack (ToR) design typically requires more switches because each rack has its own switch to manage network connections, as opposed to End of Row (EoR) or centralized designs, which consolidate switches.
While ToR designs improve cabling efficiency and reduce latency, they also increase the number of switches, thus raising management complexity and potentially increasing capital and operational costs.
Detailed Explanation:
In a ToR setup, each rack's individual switch allows for quick access and streamlined cabling within the rack.
However, this setup means more devices to configure, monitor, and maintain, which can increase administrative overhead and network management complexity.
EPI Data Center Specialist References:
EPI documentation notes that ToR designs can improve performance but also lead to increased management needs due to the higher switch count, making them less ideal in environments where simplified network management is prioritized.

NEW QUESTION # 102
......
For candidates who have little time to prepare for the exam, buying high-quality CDCS exam materials is quite necessary. With the experienced professionals to edit, CDCS exam materials of us are high-quality, and they will help you pass the exam and get the certificate just one time. You just need to spend about 48 to 72 hours on practicing, and you can pass the exam. We also pass guarantee and money back guarantee if you fail to pass the exam. We provide you with free update for 365 days if you purchase CDCS Exam Materials from us.
CDCS Demo Test: https://www.itpass4sure.com/CDCS-practice-exam.html
2026 Latest itPass4sure CDCS PDF Dumps and CDCS Exam Engine Free Share: https://drive.google.com/open?id=1w0j3X8NrnKJohxfV1pwYWkgo8PTSl7Mq
Reply

Use props Report

You need to log in before you can reply Login | Register

This forum Credits Rules

Quick Reply Back to top Back to list