Firefly Open Source Community

   Login   |   Register   |
New_Topic
Print Previous Topic Next Topic

[General] AP-209 Dumps Cost & Hottest AP-209 Certification

130

Credits

0

Prestige

0

Contribution

registered members

Rank: 2

Credits
130

【General】 AP-209 Dumps Cost & Hottest AP-209 Certification

Posted at 12 hour before      View:17 | Replies:0        Print      Only Author   [Copy Link] 1#
Our AP-209 study materials take the clients’ needs to pass the test smoothly into full consideration. The questions and answers boost high hit rate and the odds that they may appear in the real exam are high. Our AP-209 study materials have included all the information which the real exam is about and refer to the test papers in the past years. Our AP-209 study materials analysis the popular trend among the industry and the possible answers and questions which may appear in the real exam fully. Our AP-209 Study Materials stimulate the real exam’s environment and pace to help the learners to get a well preparation for the real exam in advance. Our AP-209 study materials won’t deviate from the pathway of the real exam and provide wrong and worthless study materials to the clients.
Salesforce AP-209 Exam Syllabus Topics:
TopicDetails
Topic 1
  • Assets: This domain examines asset architecture including hierarchies and relationships, and strategies for tracking and managing customer assets throughout their lifecycle.
Topic 2
  • Implementation Strategies and Design: This domain covers the full consulting project lifecycle from planning and requirements gathering through deployment, and determining appropriate deployment strategies and licensing needs for Field Service implementations.
Topic 3
  • Resource Management: This domain focuses on managing resource availability, Service Territory Management capabilities, handling different resource types, and implementing optimal scheduling strategies for field service personnel.
Topic 4
  • Optimization: This domain covers using service objectives for automated scheduling, global optimization engine capabilities, troubleshooting optimization issues, and strategies to improve scheduling quality and efficiency.

100% Pass Quiz Professional Salesforce - AP-209 - Advanced Field Service Accredited Professional Dumps CostThere are a lot of experts and professors in or company in the field. In order to meet the demands of all people, these excellent experts and professors from our company have been working day and night. They tried their best to design the best AP-209 certification training materials from our company for all people. By our study materials, all people can prepare for their AP-209 Exam in the more efficient method. We can guarantee that our AP-209 study materials will be suitable for all people and meet the demands of all people, including students, workers and housewives and so on.
Salesforce Advanced Field Service Accredited Professional Sample Questions (Q23-Q28):NEW QUESTION # 23
A customer has few types of resources: internal full-time, internal part-time, and full-time contractors. The requirement is to prefer full-time employees over contractors, and contractors over part-time employees.
How should a consultant implement this requirement?
  • A. Use 'Resource Priority' Service Objective, set the full-time employees with priority '10', contractors with priority '9' and part-time with priority '8'.
  • B. Use 'Preferred Resource' Service Objective, assign the full-time employees as preferred for all Accounts.
  • C. Use the 'Required Resource' Work Rule and set the full-time employees as required for all Accounts, use the 'Preferred Resource' Service Objective, and set the part-time and contractors as preferred to all Accounts.
  • D. Use 'Resource Priority' Service Objective, set the full-time employees with priority '1', contractors with priority '2' and part-time employees with priority '3'.
Answer: A
Explanation:
To tier resources generally (not per customer), you use the Resource Priority Service Objective.
* Option C is correct.TheResource Priorityobjective works on a scoring scale where aHigher Value indicates aHigher Priority. The optimization engine attempts to assign the appointment to the resource that yields the highest overall schedule score.
* By assigning Full-Time = 10, Contractors = 9, and Part-Time = 8, the engine will "score" the Full- Time option highest, followed by the Contractor.
* Option Duses the inverse logic (1, 2, 3). If deployed, the engine would favor the Part-Time employees (Score 3) over the Full-Time employees (Score 1), which is the opposite of the requirement.
* Options A and Brefer toPreferred Resource, which is typically defined on theAccountorWork Order level (e.g., "Bob is preferred for Customer X"). It is not efficient for ranking entiregroupsof employees globally.

NEW QUESTION # 24
Which three topics should a consultant raise during the project scoping discussion of a field service implementation?
  • A. Work Parameters: how work is being defined
  • B. Project Objectives: what is essential
  • C. Solution Design: request for acceptance
  • D. Terminology: translate objectives and priorities into Field Service
  • E. Sprint Review: to review what will be done during the sprint cycle
Answer: A,B,D
Explanation:
During Scoping (the initial phase), the goal is to align on the "What" and "Why" before moving to the "How."
* Option A is correct (Work Parameters):You must define what constitutes a "Job" (Work Order), how long it takes, and what skills are needed. This is the foundation of the data model.
* Option C is correct (Terminology):Mapping the customer's language to Salesforce terms (e.g., "We have 'Truck Rolls' -> In Salesforce, that is a 'Service Appointment'") is crucial to avoid confusion throughout the project.
* Option D is correct (Project Objectives)efining what is "Essential" (MVP) vs. "Nice to Have" sets the project boundaries and success metrics.
* Option B (Sprint Review) happensduringthe build phase (Agile methodology), not during initial scoping.
* Option E (Solution Design) is theoutputof the scoping/analysis phase, not a topic you ask about during the initial discovery.

NEW QUESTION # 25
Green Energy Solutions are trying to forecast the number and type of licenses needed to be purchased to support the following resource structure:
Service Territory A has 2 internal resources and 2 contractors set as capacity-based resources: ABC and XYZ, both represent a contractor company. ABC contracting company has 3 individual resources and XYZ contracting company has 4 individual resources.
What type of Field Service licenses and how many of each should Green Energy Solutions purchase?
  • A. 1 Dispatcher, 1 Technician, and 3 Contractors, plus 7 Contractors (3 for ABC and 4 for XYZ)
  • B. 2 Dispatchers, 2 Technicians, and 1 Contractor, plus 7 Contractors (3 for ABC and 4 for XYZ)
  • C. 1 Dispatcher, 2 Technicians, and 2 Contractors, plus 7 Contractors (3 for ABC and 4 for XYZ)
  • D. 1 Dispatcher, 9 Technicians, and 2 Contractors
Answer: C
Explanation:
This question tests your understanding of Salesforce Field Service License types (Dispatcher, Technician, Contractor).
* 1 Dispatcher:Although not explicitly stated as a user in the text, you always need at least one dispatcher license to manage the schedule. (Typically implied in licensing questions unless "0" is an option).
* 2 Technicians:Territory A has "2 internal resources"1. Internal mobile workers require the standard Field Service Mobile(Technician) license.
* 2 Contractors (Capacity-Based):The question states "2 contractors set as capacity-based resources:
ABC and XYZ."2These are the "Bucket" accounts. In Salesforce, even capacity-based container users often consume a license (typically aContractororCommunity Pluslogin) to access the portal
/community where they might view their aggregate schedule.
* 7 Contractors (Individuals):The question specifies "ABC... has 3 individual resources and XYZ... has
4 individual resources"3. Even if theschedulingis done at the capacity (bucket) level, if these 7 people need to log in to the app or community to close jobs, they each need a license.
* Result: 1 Dispatcher + 2 Technicians (Internal) + 2 Contractors (The Managers/Buckets) + 7 Contractors (The Workers) = Option D.
(Note: Licensing models can be complex. In some strictly capacity-based models, you might not license the 7 individuals if they never log in, but Option D is the most complete answer reflecting a standard model where all participants need system access).

NEW QUESTION # 26
Green Energy Solutions would like to track their vehicles' availability, so that once a Work Order is created, both a Service Resource and a vehicle need to be assigned to the work, to ensure that the resource will use an available vehicle for the job.
How would a consultant recommend implementing this requirement?
  • A. Set the vehicle as a Service Resource, create a Work Order and two Service Appointments, one for the mobile worker and one for the vehicle, use 'Complex Work' with a dependency of type 'Same Start'
  • B. Set the vehicle as a 'Required Product'. Once a resource is assigned to the work a 'vehicle' product will be consumed via the Field Service mobile App to indicate that this vehicle is being used
  • C. Set the vehicle as a Service Resource, create a Work Order and two Service Appointments, one for the mobile worker and one for the vehicle, use 'Complex Work' with a dependency of type 'Immediately Follow'
  • D. Set the vehicle as a 'Required Product'. Once the Work Order is created it will inherit the 'Required Product' and notify the resource that this vehicle needs to be used for the job
Answer: A
Explanation:
The requirement is to schedule two distinct resources (a Human and a Vehicle) for the same job at the same time.
* Option C is correct.
* Vehicle as Service Resource:You must model the vehicle as a Service Resource (Type: Asset) to track its availability on the Gantt and prevent double-booking.
* Complex Work (Same Start):To ensure the vehicle and the technician are booked together, you use Complex Work dependencies. "Same Start" ensures that the vehicle appointment and the technician appointment are scheduled to begin simultaneously.
* Options A and Dare incorrect becauseProductsare not scheduled. Consuming a product does not check if the vehicle is available at that specific time, potentially leading to double-booking the van.
* Option Bis incorrect because "Immediately Follow" implies a sequence (Technician finishes -> Vehicle starts), which is not how a shared ride/equipment scenario works.

NEW QUESTION # 27
Universal Containers offers installation services that takes four days to complete and requires certain parts.
After the installation, a training session is provided and a swag kit and framed certificate is provided upon completion.
How should a Field Service consultant model the work so that both visits should have a qualified tech to complete work on each job?
  • A. Create Work Order and two Work Order Line Items, each Work Order Line Item has one Service Appointment: one Service Appointment (Multi Day) for installation, and one Service Appointment for training. When the installation Service Appointment is scheduled, update the training Service Appointment so the 'Earliest Start Date' is the day after the 'Scheduled End Date' of the installation Service Appointment
  • B. Create Work Order and two Work Order Line Items, each Work Order Line Item has one Service Appointment: one Service Appointment (Multi Day) for installation, and one Service Appointment for Training. Leverage 'Complex Work' to ensure the training is done after the installation
  • C. Create two Work Order Line Items, with parent-child dependency. Each Work Order Line Item has one Service Appointment: The parent Work Order Line Item has one Service Appointment (Multi Day) for installation, and one Service Appointment for training. Leverage Crews and add a Training resource as a Crew Member on the last day of the Service Appointment
  • D. Create Work Order and two Service Appointments: one Service Appointment (Multi Day) for installation, and one Service Appointment for training. Leverage 'Complex Work' to ensure the training is done after the installation
Answer: B
Explanation:
This scenario involves two distinct types of work (Installation vs. Training) with different durations and likely different skill requirements, but they are part of the same customer order.
* Option C is correct.
* Data Model:UsingWork Order Line Items (WOLIs)is the best practice here. You create one WOLI for the "Installation" (linked to a Work Type that allows Multi-Day) and a separate WOLI for "Training" (linked to a different Work Type). This allows you to track the status and skills for each part separately.
* Dependency:UsingComplex Work(specifically a "Start After Finish" dependency) ensures the Training appointment cannot be scheduled until the Installation is complete.
* Option A puts both Appointments on thesameWork Order parent. While possible, it makes it harder to report on "Training" vs "Install" costs separately and limits the ability to use different Work Types for each appointment automatically.
* Option B relies on manual updates or custom automation ("When scheduled, update..."), whereas Complex Work (Option C) handles the logic natively during optimization.

NEW QUESTION # 28
......
Looking for top-notch Implementing and Operating Advanced Field Service Accredited Professional (AP-209) exam questions? You've come to the right place! ActualTestsQuiz offers a comprehensive and affordable solution for all your AP-209 exam needs. Our AP-209 Exam Questions are regularly updated, and we provide a range of attractive features to enhance your preparation, including PDF format, an online practice test engine.
Hottest AP-209 Certification: https://www.actualtestsquiz.com/AP-209-test-torrent.html
Reply

Use props Report

You need to log in before you can reply Login | Register

This forum Credits Rules

Quick Reply Back to top Back to list