Firefly Open Source Community

   Login   |   Register   |
New_Topic
Print Previous Topic Next Topic

[General] 新版的IDPX題庫上線 -下載IDPX題庫 &通過IDPX認證考試

131

Credits

0

Prestige

0

Contribution

registered members

Rank: 2

Credits
131

【General】 新版的IDPX題庫上線 -下載IDPX題庫 &通過IDPX認證考試

Posted at before yesterday 10:45      View:15 | Replies:0        Print      Only Author   [Copy Link] 1#
2026 NewDumps最新的IDPX PDF版考試題庫和IDPX考試問題和答案免費分享:https://drive.google.com/open?id=19mo0IJ1qq2vQ5tSb5gFfmoaPE7yBPA3_
想要通過IDPX認證考試?擔心考試會變體,來嘗試最新版本的題庫學習資料。我們提供的CIDQ IDPX考古題準確性高,品質好,是你想通過考試最好的選擇,也是你成功的保障。你可以免費下載100%準確的IDPX考古題資料,我們所有的CIDQ產品都是最新的,這是經過認證的網站。它覆蓋接近95%的真實問題和答案,快來訪問NewDumps網站,獲取免費的IDPX題庫試用版本吧!
CIDQ IDPX 考試大綱:
主題簡介
主題 1
  • Professional Business Practices: This section of the exam measures skills of an Interior Design Consultant and addresses business structures, scope of practice, proposals, contracts, and basic project accounting. It prepares candidates to understand legal obligations, manage finances, and structure project proposals professionally.
主題 2
  • Project Process, Roles, and Coordination: This section of the exam measures the skills of a Project Design Manager and focuses on team roles, stakeholder engagement, budgeting, project timelines, and collaboration with allied professionals. It also includes managing deliverables, specifications, phased construction, and conducting post-occupancy evaluations.
主題 3
  • Code Requirements, Laws, Standards, and Regulations: This section of the exam measures the skills of a Regulatory Compliance Specialist and covers environmental regulations, accessibility standards, building codes, and zoning laws. It also addresses understanding jurisdictional permit processes and legal implications for design compliance.

CIDQ IDPX考古題介紹,IDPX認證考試解析關於IDPX認證考試的相關資料,有很多網站都可以提供。但是,他們都不能保證考試資料的品質,同時也不能給你考試失敗就全額退款的保障。比起那些普通的參考資料,NewDumps的IDPX考古題完全是一個值得你利用的工具。在NewDumps的指導和幫助下,你完全可以充分地準備考試,並且可以輕鬆地通過考試。如果你想在IT行業有更大的發展,那你有必要參加IT認證考試。如果你想順利通過你的IT考試嗎,那麼你完全有必要使用NewDumps的考古題。
最新的 Interior Design Certification IDPX 免費考試真題 (Q109-Q114):問題 #109
Where open risers are permitted in a commercial space, what is the MAXIMUM clear space between risers?
  • A. 3" [76 mm]
  • B. 4" [102 mm]
  • C. 7" [178 mm]
  • D. 11" [279 mm]
答案:B
解題說明:
Per IBC Section 1011.5.5.3, open risers are allowed in commercial spaces (non-residential) if the clear space between risers doesn't exceed 4" (102 mm), preventing small objects or feet from passing through, ensuring safety. Options A (3") is stricter than required, C (7") and D (11") exceed the limit, violating code. The 4" maximum (B) applies to occupancies like offices or retail where open risers are permitted (not Group I or R-
3).
Verified Answer from Official Source:B - 4" [102 mm]
"In commercial spaces where open risers are allowed, the maximum clear space between risers is 4 inches (102 mm) per IBC." (NCIDQ IDPX Study Guide, Section 1: Codes and Standards) Explanation from Official Source:The NCIDQ references IBC to ensure stair safety, with 4" as the standard to balance design flexibility and occupant protection.
Objectives:
* Apply stair design codes (IDPX Objective 1.4).

問題 #110
What is the MINIMUM illumination level at the walking surface for a means of egress?
  • A. 9 footcandles [96.88 lux]
  • B. 1 footcandle [10.76 lux]
  • C. 5 footcandles [53.82 lux]
  • D. 2 footcandles [21.53 lux]
答案:B
解題說明:
The International Building Code (IBC) Section 1008.2.1 and NFPA 101 (Life Safety Code) specify that the minimum illumination level for means of egress, including walking surfaces like corridors and stairs, must be
1 footcandle (10.76 lux) at the floor level during normal conditions. This ensures safe evacuation by providing adequate visibility. Higher levels (e.g., B, C, D) may apply to specific tasks or spaces (e.g., assembly areas), but 1 footcandle is the baseline for egress paths. Emergency lighting must also maintain this level if power fails, but the question focuses on standard conditions. Option A aligns with code requirements.
Verified Answer from Official Source:A - 1 footcandle [10.76 lux]
"The minimum illumination level for means of egress at the walking surface shall be 1 footcandle (10.76 lux) per IBC and NFPA standards." (NCIDQ IDPX Study Guide, Section 1: Codes and Standards) Explanation from Official Source:The NCIDQ references IBC and NFPA to ensure designers provide sufficient lighting for safe egress, a critical life safety requirement in all occupancies.
Objectives:
* Apply life safety codes to lighting design (IDPX Objective 1.4).

問題 #111
A designer who is working on a non-profit community center in a historic building has met individually with the project's benefactor, the community center's board, the center's director and staff, local community members, the municipality's historic preservation committee, and the retained contractor. Which of the following is the designer's GREATEST challenge?
  • A. Balancing material and finishes that have historical significance
  • B. Working with the community towards a concept that will use the space as desired
  • C. Working with the contractor towards a unique design
  • D. Balancing the various stakeholders' preferences
答案:D
解題說明:
The NCIDQ IDPX exam tests the designer's ability to manage complex projects with multiple stakeholders, particularly in challenging contexts like a non-profit community center in a historic building. The designer must navigate the needs and preferences of diverse groups while ensuring the project meets its goals.
* Option A (Balancing the various stakeholders' preferences):This is the correct choice. The project involves a wide range of stakeholders-the benefactor, board, director, staff, community members, historic preservation committee, and contractor-each with potentially conflicting preferences and priorities. Balancing these diverse interests while keeping the project on track is the designer's greatest challenge, as it requires diplomacy, communication, and compromise to achieve a cohesive design that satisfies all parties.
* Option B (Working with the contractor towards a unique design):While working with the contractor is important, the question does not indicate that the design needs to be unique in a way that poses a significant challenge. Contractor coordination is a standard part of the designer's role and not the greatest challenge in this context.
* Option C (Balancing material and finishes that have historical significance):While historic preservation is a challenge due to the building's status, the designer has already met with the historic preservation committee, suggesting that guidelines for materials and finishes are likely established. This challenge, while significant, is more specific and manageable compared to balancing stakeholder preferences.
* Option D (Working with the community towards a concept that will use the space as desired):
Engaging the community is important, but this is only one group among many stakeholders. The broader challenge lies in balancing the community's desires with those of the other stakeholders, which is encompassed in Option A.
Verified Answer from Official Source:
The correct answer is verified from NCIDQ's official study materials on project management and stakeholder coordination.
"In projects with multiple stakeholders, the designer's greatest challenge is often balancing the diverse preferences and priorities of all parties to achieve a cohesive design solution." (NCIDQ IDPX Study Guide, Project Management Section) The NCIDQ IDPX Study Guide highlights that managing multiple stakeholders with differing preferences is a significant challenge, especially in community-driven projects like a non-profit center. The designer must act as a mediator to align these interests, making Option A the greatest challenge in this scenario.
Objectives:
* Understand the challenges of managing multiple stakeholders (NCIDQ IDPX Objective: Project Management).
* Apply communication strategies to balance diverse priorities (NCIDQ IDPX Objective: Professional Practice).

問題 #112
Why is corrective work completed post-occupancy often MORE costly for the contractor?
  • A. Progress payments are not included
  • B. Revisions are billed on a cost-plus basis
  • C. The work must be performed after hours
  • D. The warranty has expired
答案:C
解題說明:
The NCIDQ IDPX exam tests the designer's understanding of construction administration and the financial implications of post-occupancy corrective work. Corrective work after occupancy refers to fixing deficiencies or errors after the client has moved into the space, which often increases costs for the contractor.
* Option A (The warranty has expired):If the warranty has expired, the contractor may not be obligated to perform the corrective work at all, or it may be at the owner's expense. However, most warranties (e.g., one-year standard) cover the initial post-occupancy period, so this is not the primary reason for increased costs.
* Option B (Progress payments are not included)rogress payments are typically tied to the original construction contract and are completed by the time occupancy occurs. However, corrective work is often covered under warranty or a separate agreement, and the lack of progress payments is not the main reason for higher costs.
* Option C (The work must be performed after hours):This is the correct choice. Post-occupancy corrective work often must be done after regular business hours to avoid disrupting the client's operations (e.g., in an office or commercial space). After-hours work typically incurs higher labor costs due to overtime rates, increased supervision, and logistical challenges, making it more expensive for the contractor.
* Option D (Revisions are billed on a cost-plus basis):Corrective work is usually performed under the original contract or warranty, not on a cost-plus basis. Even if billed cost-plus, this does not inherently make the work more expensive compared to the impact of after-hours labor costs.
Verified Answer from Official Source:
The correct answer is verified from NCIDQ's official study materials on construction administration and post- occupancy considerations.
"Corrective work after occupancy is often more costly for the contractor because it must be performed after hours to avoid disrupting the client's operations, resulting in higher labor costs." (NCIDQ IDPX Study Guide, Construction Administration Section) The NCIDQ IDPX Study Guide highlights that after-hours work is a primary reason for increased costs in post-occupancy corrective work, as it requires overtime labor and additional coordination. This directly aligns with Option C, making it the correct answer.
Objectives:
* Understand the cost implications of post-occupancy corrective work (NCIDQ IDPX Objective:
Construction Administration).
* Apply knowledge of construction processes to manage project closeout (NCIDQ IDPX Objective:
Project Closeout).

問題 #113
A new hospital includes a cafeteria and a 60-person conference room. Which occupancy classifications would apply?
  • A. assembly and industrial
  • B. assembly and business
  • C. institutional and assembly
  • D. institutional and business
答案:C

問題 #114
......
NewDumps的IDPX考古題是經過眾多考生檢驗過的資料,可以保證有很高的成功率。如果你用過考古題以後仍然沒有通過考試,NewDumps會全額退款。或者你也可以選擇為你免費更新考試考古題。有了這樣的保障,實在沒有必要擔心了。
IDPX考古題介紹: https://www.newdumpspdf.com/IDPX-exam-new-dumps.html
2026 NewDumps最新的IDPX PDF版考試題庫和IDPX考試問題和答案免費分享:https://drive.google.com/open?id=19mo0IJ1qq2vQ5tSb5gFfmoaPE7yBPA3_
Reply

Use props Report

You need to log in before you can reply Login | Register

This forum Credits Rules

Quick Reply Back to top Back to list