【General】 Construction Specifications Institute CDT Exam Practice Material in Three Divers

Posted at yesterday 23:51      View:12 | Replies:0        Print      Only Author   [Copy Link] 1#
As is known to us, the leading status of the knowledge-based economy has been established progressively. It is more and more important for us to keep pace with the changeable world and improve ourselves for the beautiful life. So the CDT certification has also become more and more important for all people. Because a lot of people long to improve themselves and get the decent job. In this circumstance, more and more people will ponder the question how to get the CDT Certification successfully in a short time.
Hundreds of IT aspirants have cracked the Construction Documents Technologist CDT examination by just preparing with our real test questions. If you also want to become a Construction Specifications Institute CDT certified without any anxiety, download Network Security Specialist CDT updated test questions and start preparing today. These real CDT Dumps come in desktop practice exam software, web-based practice test, and Construction Specifications Institute CDT PDF document. Below are specifications of these three formats.
CDT Reliable Dumps Free & CDT Related ContentIf you are willing to purchase valid Construction Specifications Institute CDT reliable vce exam simulator, you should be eagle-eyed since there are so much information on the internet. Valid products are hard to tell, once you find them, you will fell as if you'd found a priceless treasure. Our CDT reliable vce exam simulator will be your priceless products. Our passing rate is 100% recent two years. We can assure you that No Pass Full Refund. Our materials are valid and the best absolutely.
Construction Specifications Institute Construction Documents Technologist Sample Questions (Q113-Q118):NEW QUESTION # 113
Which party has the ultimate authority to approve a change order?
  • A. Construction manager
  • B. Architect/engineer
  • C. Owner
  • D. Contractor
Answer: C

NEW QUESTION # 114
The three types of commissioning include systems and equipment commissioning, building envelope commissioning, and what other process?
  • A. Facility commissioning
  • B. Process commissioning
  • C. Mechanical commissioning
  • D. Total project commissioning
Answer: B

NEW QUESTION # 115
When is decommissioning required for a facility?
  • A. When the facility is no longer needed for operations
  • B. When the building changes owners
  • C. When the entire building is going to be demolished
  • D. When the facility will not be used again in the future
Answer: A

NEW QUESTION # 116
What is the basis of payment for a contract negotiated between an owner and a contractor for a fixed price?
  • A. Cost-plus-fee
  • B. Stipulated sum
  • C. Cost-plus-fee with guaranteed maximum price
  • D. Unit price
Answer: B
Explanation:
CSI's treatment of methods of payment / contract pricing (as used in standard owner-contractor agreements and CDT content) includes several common bases of payment:
* Stipulated Sum (Lump Sum)
* The contractor agrees to provide the work for a single fixed price.
* The price does not change except through formal changes to the work (change orders).
* This is the classic "fixed-price" contract form.
* Unit Price
* The contractor is paid based on measured quantities of work completed multiplied by agreed unit rates.
* Final cost depends on actual quantities installed, not a single fixed total.
* Cost-Plus-Fee
* The owner reimburses actual cost of the work (labor, materials, equipment, etc.) plus a fee (fixed or percentage) as contractor's compensation.
* The final cost is not fixed; it varies with actual costs incurred.
* Cost-Plus-Fee with Guaranteed Maximum Price (GMP)
* A variation of cost-plus where the total reimbursable cost plus fee is capped at a guaranteed maximum.
* Still not the same as a straightforward fixed lump sum; the basis is cost reimbursement up to a cap.
The question specifically asks: "for a fixed price." In CSI and standard contract terminology, "fixed price"
= "stipulated sum" (or lump sum). That is:
* The owner and contractor negotiate a single dollar amount for the entire scope of work;
* The contractor's compensation is that stipulated sum, adjusted only by approved changes.
Why the other options are not correct:
* B. Unit price - The total cost is not fixed at the time of contracting; it depends on actual installed quantities.
* C. Cost-plus-fee - Costs are reimbursed; final price is open-ended and therefore not fixed.
* D. Cost-plus-fee with guaranteed maximum price - This sets a cap, but the actual final cost is not a single fixed price; it is "actual cost plus fee" up to the GMP.
Therefore, the correct basis of payment for a fixed-price contract is Stipulated sum (Option A), consistent with CSI's classification of contract types and standard owner-contractor agreements.
Key CSI References (titles only, no links):
* CSI Project Delivery Practice Guide - sections on "Basis of Payment" and contract pricing methods (stipulated sum, unit price, cost-plus, GMP).
* CSI CDT Body of Knowledge - Contract Types and Methods of Payment.
* Standard owner-contractor agreements discussed in CSI materials (e.g., stipulated sum as the fixed- price form).

NEW QUESTION # 117
Which member of the project team initiates the project, assumes the risk, controls and manages the design and construction process, and provides the funding?
  • A. Designer
  • B. Owner
  • C. Supplier
  • D. Contractor
Answer: B
Explanation:
CSI's description of project roles is very clear about the owner's role in project delivery:
* The owner is the party that:
* Identifies the need or opportunity and therefore initiates the project.
* Provides the funding for design and construction.
* Retains the design and construction teams and selects the project delivery method.
* Ultimately assumes the primary financial and project risk, because the owner is the one investing in and depending on the completed facility.
In contrast:
* The designer (architect/engineer) is responsible for planning and design, preparing construction documents, and administering the construction contract on the owner's behalf, but does not typically initiate the project or provide funding.
* The contractor is responsible for constructing the project in accordance with the contract documents; the contractor bears construction execution risk, but not the basic project-initiative and funding role.
* Suppliers provide materials/equipment and have no overarching control over the project delivery process.
The question lists all of the characteristics that CSI attributes to the owner:
"initiates the project, assumes the risk, controls and manages the design and construction process, and provides the funding." Thus, the correct answer is Option D - Owner.
CSI references (by name only, no links):
* CSI Project Delivery Practice Guide - "Participants in Project Delivery" (owner, designer, constructor, suppliers)
* CDT Body of Knowledge - descriptions of owner responsibilities and risk

NEW QUESTION # 118
......
The world today is in an era dominated by knowledge. Knowledge is the most precious asset of a person. If you feel exam is a headache, don't worry. CDT test answers can help you change this. CDT study material is in the form of questions and answers like the real exam that help you to master knowledge in the process of practicing and help you to get rid of those drowsy descriptions in the textbook. CDT Test Dumps can make you no longer feel a headache for learning, let you find fun and even let you fall in love with learning. The content of CDT study material is comprehensive and targeted so that you learning is no longer blind. CDT test answers help you to spend time and energy on important points of knowledge, allowing you to easily pass the exam.
CDT Reliable Dumps Free: https://www.itexamguide.com/CDT_braindumps.html
If for any reason you do not pass your CDT exam, ExamsLead will provide you with a full refund or another exam of your choice absolutely free within 90 days from the date of purchase, However, Itexamguide is the leading source provider of the Construction Specifications Institute Certification CDT exam practice materials, What's more, we will send you the latest one immediately once we have any updating of CDT Reliable Dumps Free - Construction Documents Technologist exams4sure pdf.
and setting up automated processes for Twitter, Facebook, CDT and LinkedIn, Playing QuickTime Files from Your Desktop, If for any reason you do not pass your CDT Exam, ExamsLead will provide you with a full refund or another exam of your choice absolutely free within 90 days from the date of purchase.
100% Pass Fantastic Construction Specifications Institute - CDT - Exam Construction Documents Technologist Simulator FreeHowever, Itexamguide is the leading source provider of the Construction Specifications Institute Certification CDT exam practice materials, What's more, we will send you the latest one immediately once we have any updating of Construction Documents Technologist exams4sure pdf.
It also supports offline use, If your answer is yes, it is high time for you to use the CDT question torrent from our company.
Reply

Use props Report

You need to log in before you can reply Login | Register

This forum Credits Rules

Quick Reply Back to top Back to list