【Hardware】 Download NewPassLeader Project-Management Exam Real Questions and Start Preparat

Posted at yesterday 16:43      View:15 | Replies:0        Print      Only Author   [Copy Link] 1#
What's more, part of that NewPassLeader Project-Management dumps now are free: https://drive.google.com/open?id=1I3LoX5LXTpXwcmrf7ODoDOqqh69fP9DP
We provide varied functions to help the learners learn our Project-Management study materials and prepare for the exam. The Project-Management self-learning and self-evaluation functions help the learners check their learning results and the statistics. The timing function of our Project-Management guide questions help them adjust their speeds to answer the questions and the function of stimulating the exam can help the learners adapt themselves to the atmosphere and pace of the exam. Thus the learners can master our Project-Management Practice Engine fast, conveniently and efficiently and pass the Project-Management easily.
You will get high passing score in the NCARB Project-Management Real Exam with our valid test questions and answers. NewPassLeader can provide you with the most reliable Project-Management exam dumps and study guide to ensure you get certification smoothly. We guarantee the high accuracy of questions and answers to help candidates pass exam with 100% pass rate.
Free PDF Quiz Reliable NCARB - Project-Management - ARE 5.0 Project Management (PjM) Exam Practice Questionsour advanced operation system on the Project-Management learning guide will automatically encrypt all of the personal information on our Project-Management practice dumps of our buyers immediately, and after purchasing, it only takes 5 to 10 minutes before our operation system sending our Project-Management Study Materials to your email address, there is nothing that you need to worry about, and we will spear no effort to protect your interests from any danger and ensure you the fastest delivery.
NCARB ARE 5.0 Project Management (PjM) Exam Sample Questions (Q43-Q48):NEW QUESTION # 43
An architecture firm is negotiating a contract with an owner for a $2,000,000 project. The proposed architectural-only fee is 5% of the cost of construction through the end of the Construction Document Phase.
During the negotiations, the owner wants to apply for a building permit in 7 weeks without exceeding the original budget constraints. The project staff currently consists of 2 people who have an hourly rate of $100.
What is the minimum project staff required to meet the owner's new schedule?
  • A. 0
  • B. 1
  • C. 2
  • D. 3
Answer: B
Explanation:
Comprehensive Detailed Explanation:
Step 1: Fee available through CD phase:
$2,000,000 × 5% = $100,000
Step 2: Time constraint: 7 weeks
Hourly rate: $100/person
Max hours affordable: $100,000 ÷ $100 = 1,000 hours
Step 3: Hours per person over 7 weeks:
Assume 40 hours/week # 1 person = 280 hours
X = number of people
280 × X = 1,000 hours # X = ~3.57 # round up # 4 people
References:
NCARB ARE 5.0 Handbook - Fee calculation, budgeting, and scheduling
Ballast ARE 5 Review Manual - Staff planning exercises

NEW QUESTION # 44
The architect is on site to evaluate the completed work by the contractor. During the evaluation, the architect notices a structural connection that deviates from the contract documents.
According to AIA B101, to which party should the architect report this observed deviation?
  • A. Structural engineer
  • B. Owner
  • C. Building inspector
  • D. Contractor
Answer: B
Explanation:
Per AIA B101 § 3.6.2.1, the architect is required to notify the owner of any deviations from the contract documents observed during site visits. While the architect may also discuss it with the contractor and engineer, the formal obligation is to report it to the owner. The contractor is ultimately responsible for conformance with contract documents, and further action (like issuing a notice of nonconformance or requiring correction) may follow.
References:
AIA B101-2017 § 3.6.2.1
AIA A201-2017 §§ 3.3 and 4.2
NCARB ARE 5.0 Handbook - Construction Administration Task Overview

NEW QUESTION # 45
A new site has been identified for a prototype fast food restaurant. The geotechnical report indicates fill materials were found in the subsurface conditions along the east side of the proposed building location.
What member of the project team should be involved in modifications to the prototype building design to address this issue?
  • A. Excavation Contractor
  • B. Landscape Architect
  • C. Environmental Engineer
  • D. Structural Engineer
Answer: D
Explanation:
Comprehensive Detailed Explanation:
When fill material is discovered in the geotechnical report, the structural engineer must assess the stability and bearing capacity of the soil to determine whether foundations need to be redesigned or modified. Fill can result in settlement or poor load-bearing conditions. The structural engineer will use the geotechnical report to modify foundation types, slab-on-grade design, or structural systems accordingly.
References:
NCARB ARE 5.0 Handbook - Project Management (PjM) division: Coordination with consultants CSI MasterFormat - Division 31 (Earthwork) and Division 03 (Concrete) AIA Document B101 - Architect's responsibility to coordinate structural implications with consultants

NEW QUESTION # 46
What type of contract involves payment based on actual costs plus a fee?
  • A. Cost-Plus Contract
  • B. Lump Sum Contract
  • C. Time and Materials Contract
  • D. Unit Price Contract
Answer: A
Explanation:
Cost-Plus Contracts reimburse the contractor for actual costs plus an agreed fee or percentage. This contract type shifts some risk to the owner but allows flexibility for uncertain scopes. Lump sum contracts are fixed price; unit price contracts pay per unit; time and materials pay based on labor and material costs but usually with a cap. ARE 5.0 PjM covers contract types and their implications.

NEW QUESTION # 47

Refer to the exhibit.
The following changes occur during the project:
* The owner delayed the project kickoff until September Year 1 due to delays in finalizing the Owner- Architect Agreement.
* The architect did not have enough staff available to start the project on time, so the firm hired temporary staff for 2 months.
* The owner made a design change in January Year 2 that added 2 weeks to the schedule.
* Not enough bids were received, and the project was bid a second time with additional advertising.
* The owner made design changes in May and July of Year 2 that each added 3 weeks to the schedule.
When were the construction documents completed based on the project changes?
  • A. August Year 3
  • B. June Year 3
  • C. November Year 2
  • D. September Year 2
Answer: C
Explanation:
According to the baseline schedule in the exhibit, Construction Documents (CDs) were initially scheduled from March to July of Year 2 (5 months). Here are the project delays:
Owner kickoff delay: shifted the entire timeline by 1 month # CD starts April Year 2 January Year 2 change: +2 weeks May and July changes: +3 weeks each (6 weeks total) Rebid due to low response: +1 month
= Total added to CDs: ~2.5 months
April to July = 4 months
2.5 months = mid-to-late September # factoring rebid delay leads to November References:
NCARB ARE 5.0 Handbook - Schedule management and owner-requested changes AIA B101 - Project schedule adjustments Project Execution Plan and Change Management in Construction

NEW QUESTION # 48
......
After cracking the ARE 5.0 Project Management (PjM) Exam (Project-Management) exam you will receive the credential badge. It will pave your way toward well-paying jobs or promotions in any reputed tech company. At NewPassLeader have customizable NCARB Project-Management practice exams for the students to review and improve their preparation. The NCARB Project-Management Practice Test material product of NewPassLeader are created by experts with the dedication to help customers crack the NCARB Project-Management exam on the first attempt.
Exam Project-Management Simulations: https://www.newpassleader.com/NCARB/Project-Management-exam-preparation-materials.html
NCARB Project-Management Practice Questions The procedure of refund is very simple, Furthermore, all browsers and operating systems support this version of the NCARB Project-Management practice exam, The NCARB Project-Management Exam Dumps have been made under the expert advice of 90,000 highly experienced NCARB professionals from around the globe, IT field is becoming competitive; a NCARB Exam Project-Management Simulations certification can help you do that.
Comprehensive Guide to Project Management Schedule Project-Management Exam Certification Cost and Cost Control, A: Methods and Models for Managing the Project Lifecycle, After these elementshave been quantified, management must validate the Project-Management Practice Questions reasonableness of the numbers so that the plan can be put into place to address and effect change.
Free PDF 2026 Newest Project-Management: ARE 5.0 Project Management (PjM) Exam Practice QuestionsThe procedure of refund is very simple, Furthermore, all browsers and operating systems support this version of the NCARB Project-Management Practice Exam, The NCARB Project-Management Exam Dumps have been made under the expert advice of 90,000 highly experienced NCARB professionals from around the globe.
IT field is becoming competitive; a NCARB certification can Project-Management help you do that, We apply the international recognition third party for the payment, and it will protect the interests of you.
DOWNLOAD the newest NewPassLeader Project-Management PDF dumps from Cloud Storage for free: https://drive.google.com/open?id=1I3LoX5LXTpXwcmrf7ODoDOqqh69fP9DP
Reply

Use props Report

You need to log in before you can reply Login | Register

This forum Credits Rules

Quick Reply Back to top Back to list