【General】 DumpExam Actual and Updated The Open Group OGA-032 PDF Questions

Posted at yesterday 16:04      View:15 | Replies:0        Print      Only Author   [Copy Link] 1#
P.S. Free & New OGA-032 dumps are available on Google Drive shared by DumpExam: https://drive.google.com/open?id=1OspmEIjUen1bZaYfS-Cz9Ltiti7MFnYU
Users who use our OGA-032 study materials already have an advantage over those who don't prepare for the exam. Our study materials can let users the most closed to the actual test environment simulation training, let the user valuable practice effectively on OGA-032 study materials, thus through the day-to-day practice, for users to develop the confidence to pass the exam. For examination, the power is part of pass the exam but also need the candidate has a strong heart to bear ability, so our OGA-032 Study Materials through continuous simulation testing, let users less fear when the real test, better play out their usual test levels, can even let them photographed, the final pass exam.
The Open Group OGA-032: ArchiMate 3 Part 2 exam is an essential certification for enterprise architects who want to validate their knowledge and gain recognition in the field. It is a challenging test that requires a deep understanding of the ArchiMate 3.0 specification and practical experience in its application. Candidates who Pass OGA-032 Exam have a globally recognized certification that demonstrates their expertise in enterprise architecture, which can lead to opportunities for career growth and advancement.
Reliable and Guarantee Refund of The Open Group OGA-032 Practice Test According to Terms and ConditionsIt would be really helpful to purchase ArchiMate 3 Part 2 Exam exam dumps right away. If you buy this The Open Group Certification Exams product right now, we'll provide you with up to 1 year of free updates for OGA-032 authentic questions. You can prepare using these no-cost updates in accordance with the most recent test content changes provided by the OGA-032 Exam Dumps. The OGA-032 actual questions we sell also come with a free demo.
The Open Group ArchiMate 3 Part 2 Exam Sample Questions (Q10-Q15):NEW QUESTION # 10
Please read this scenario prior to answering the question
ArchiAir Catering Services (ACS) manages the catering services for ArchiAir, a leading airline. ACS is the sole catering supplier for all ArchiAir flights, and its services include full provisioning to the aircraft.
Currently, ACS operates three central production facilities, supported by distribution hubs and local pre-flight production facilities. The central production facilities are responsible for producing standardized non-food materials (such as plates, cutlery, and boxes), non-perishable food products, and key ingredients required by the local production facilities. These materials are subsequently distributed to the distribution hubs, whichalso serve as warehouses for the local production facilities. Within the local production facilities, multiple production machines are utilized, each featuring dedicated workstations for chefs and quality inspectors. Most of the local production facilities employ fully automated assembly lines, including built-in packaging stations. The loaded service trolleys are then transported to the aircraft using small lorries.
In response to investor pressure for ArchiAir to reduce its carbon footprint, the CEO of ACS has announced a plan to address this environmental concern. Subsequently, the Ministry of Social Welfare and Health has enacted a law mandating a reduction in CO2 emissions from all production facilities by the end of the year. Additionally, the airline's decision to raise ticket prices due to escalating fuel costs has led to a decrease in passenger numbers. This, in turn, impacts the volume of non-food materials required from ACS. An intemal investigation has produced a report highlighting the potential benefits of centralizing production facilities and reducing the number of distribution centers. Such changes would result in lower CO2 emissions while still effectively meeting all the requirements of ArchiAir.
In addition to evaluating its supply chain to reduce its carbon footprint, ArchiAir is taking proactive steps to achieve a net zero carbon footprint for its IT operations. The Chief Information Officer (CIO) has identified two crucial requirements to support this endeavor. The first requirement involves switching to renewable energy for ACS facilities, which are often located in remote areas where traditional fuels are the primary source of energy. To align with sustainability goals, ArchiAir aims to transition these facilities to renewable energy sources. By utilizing renewable energy, ArchiAir can significantly reduce its reliance on traditional fuels and contribute to a greener operation. The second requirement pertains to the scalability of ArchiAir's IT operations, taking into account the airline's susceptibility to seasonal changes in demand. The CIO has observed notable disparities between sites that have additional blade servers and can scale their capacity, and sites that solely rely on the two mainframes housed in central facilities. A comprehensive report has revealed that the blade servers have a negligible impact on resource waste, whereas the mainframes are notorious for their power inefficiency, particularly during periods of low demand.
Refer to the Scenario
Which of the following answers best describes the proposed transition from baseline to target, including details of motivation for changes? Note that there is no need to show the details of the target state.
  • A.
  • B.
  • C.
  • D. A diagram of a process Description automatically generated

Answer: B
Explanation:
The correct answer isD, as it best describes the transition from the baseline to the target state, including the motivation for changes based on the scenario. Here's a detailed explanation of whyDis the most accurate model:
* Baseline and Target:
* TheBaselinestate in all answers correctly depicts the current structure of ACS's operations, including theACS Central Production,Local Trucking,ACS Local Production, andFully Automated Assembly Line.
* Dcaptures the essential transition from this baseline state to the target state by illustrating how the organization is aiming to decrease CO2 emissions, as required by the new regulations, and how they intend to centralize production facilities.
* Motivation for Changes (Decrease in CO2 Emissions):
* The CEO's plan to reduceCO2 emissionsis a critical driver for change. This is captured clearly in D, which shows the effects ofDecreasing CO2 Emissions,Complying with Laws and Regulations, andCentralizing Production Facilities.
* TheMinistry of Social Welfare and Health's lawmandating CO2 reductions is accurately reflected inD, showing compliance as part of the motivation.
* Dalso depicts the motivation to centralize production facilities, which helps reduce CO2 emissions and aligns with the internal report suggesting that fewer distribution centers can meet ACS's needs effectively.
* Business and Environmental Factors:
* The scenario also points out thatpassenger numbers have decreaseddue to rising ticket prices, which reduces the demand for non-food materials from ACS. This factor is linked to the centralization effort, as reducing the need for distribution centers can reduce costs while still meeting business needs.
* Dreflects this by linkingFewer Distribution CentersandCentralized Production Facilitiesto both decreased emissions and operational efficiency.
* Compliance with Laws and Regulations:
* Dshows a clear connection between compliance withCO2 Emission Lawsand theAmount of CO2 Emissionsgenerated by ACS, which is an essential driver of change in the scenario.
* The need to ensure that emissions are within the legal limit is modeled effectively inD, reflecting the scenario's requirement to meet regulatory expectations by the end of the year.
* Centralization of Production:
* The scenario suggests thatcentralizing productionis one way to reduce emissions and achieve operational efficiency. This is depicted clearly inD, whereProduction Facilities Centralized leads to both fewer distribution centers and a significant decrease in CO2 emissions.
* Dlinks the motivation for fewer distribution centers to environmental sustainability (CO2 reduction) as well as operational improvements.
* Comprehensive ArchiMate® 3 Compliance:
* Daligns well with ArchiMate® 3 standards. It models theMotivation Elementssuch as goals (e.g., Decrease CO2 Emissions), assessments (e.g.,CO2 Emission Above Norm), and requirements (e.
g.,Comply with Laws and Regulations) accurately.
* The relationships between these motivation elements are correctly depicted using ArchiMate® connectors like influences and associations, ensuring that the transition from baseline to target is clear and fully compliant with ArchiMate® 3 best practices.
Conclusion:AnswerDprovides the best representation of the proposed transition, focusing on the motivations for centralization and reduction of CO2 emissions. It accurately reflects the scenario's requirements, including legal compliance, environmental goals, and operational changes, all while following ArchiMate® 3 modeling standards.

NEW QUESTION # 11
Please read this scenario prior to answering the question
The ArchiSurance Mobile consumer solution is used for selling and renewing insurance products, providing customer service, enabling accurate and convenient home recordkeeping, and capturing and processing claims. The solution consists of three applications. The Consultant application lets customers review their existing coverage, and update it based on common life events, such as getting a new car, moving into a new home, or having a family member move in or out. If necessary, they can speak or chat with a customer service representative. The Home Manager application helps customers photograph and catalogue their valuable possessions in order to support the filing of accurate claims in case of loss or damage. The Claim Manager application enables customers to quickly file a claim for loss or damage to an insured auto, home or possession. It enables customers to describe the incident by referencing information captured with the Consultant and the Home Manager applications. In addition, it allows the customer to add photographs, audio, video and text to support a claim, submit the claim, and monitor its progress.
The ArchiSurance Mobile applications rely on a number of application services hosted by ArchiSurance. The first is an Auto Identification and Description (AID) service that the Consultant application uses to validate and complete auto information entered by customers. The second service, Home Identification and Description (HID) performs the same function for home information, and is used by the Home Manager application. The Consultant application also uses the Virtual Agent service to guide customers as they select coverage options, the Payment Processor service to arrange premium payments, and the Coverage Activator service to generate policies and put them in force.
ArchiSurance Mobile also relies on a number of technology services. The Home Manager application uses a Multimedia Repository service to store and retrieve information about insured homes. The Claim Manager application also uses this service for claim information entered by customers. All three ArchiSurance Mobile applications use a Personal Security service to register and authenticate customers, and to manage their profiles.
Each application service is realized by an application component with the same name. Each technology service is realized by a system software environment, having the same name. ArchiSurance hosts both the application components and system software environments in a virtualized server pool within its data center. Each service has its own virtual server. Each virtual server is connected to a data center network (DCN) which in turn connects to a commercial wide area network (WAN).
Refer to the Scenario
You have been asked to show the applications that make up the ArchiSurance Mobile solution and the technology that supports these applications.
Which of the following answers provides the best description? Note that it is not necessary to model the networks.
  • A. A diagram of a server Description automatically generated
  • B. A diagram of a server Description automatically generated
  • C. A diagram of a server Description automatically generated
  • D. A diagram of a computer server Description automatically generated

Answer: D
Explanation:
In this scenario, the focus is on modeling theArchiSurance Mobile solution, showing theapplicationsthat make up this solution and thetechnology infrastructurethat supports them. This includes applications, application services, and the system software environments (technology services) upon which the applications rely.
Key ArchiMate® 3.2 Concepts Applied:
* Application Components and Services:
* Consultant Application:This allows customers to review, update coverage, and speak with customer service representatives. It uses the following application services:
* Auto Identification and Description (AID)for validating auto information.
* Virtual Agentfor helping customers select options.
* Payment Processorto arrange payments.
* Coverage Activatorto generate and activate policies.
* Home Manager Application:This allows customers to catalogue possessions and use theHome Identification and Description (HID)service to validate home information.
* Claim Manager Application:Enables filing of claims, referencing data from theConsultantand Home Managerapplications and storing information (such as photos, videos) via theMultimedia Repository.
* Technology Services:
* Personal Security Service:Used for customer registration, authentication, andprofile management across all three applications.
* Multimedia Repository Service:Used to store and retrieve information related to home possessions and claim details, supporting both theHome ManagerandClaim Manager applications.
* Technology Infrastructure:
* Each application component (Consultant, Home Manager, Claim Manager) is hosted on its own virtual serverwithin avirtualized server pool.
* Each technology service is realized by a corresponding system software environment (e.g., Multimedia Repository, Personal Security), each with its own virtual server.
* The infrastructure is hosted in a data center, but the focus here is on the services rather than the network connections.
Why Option C is Correct:
* Option Caccurately represents the keyapplications(Consultant, Home Manager, Claim Manager) in connection with the appropriatetechnology servicesand their respectivevirtual servers.
* The model shows the relationships between the applications and their dependencies onPersonal SecurityandMultimedia Repository, aligning with the description provided.
* Thevirtual server poolis depicted clearly, showing how the applications and services are realized within this infrastructure.
* The relationships betweenapplicationsandapplication services(AID, HID, Virtual Agent, Payment Processor, Coverage Activator) are not modeled in full detail here, but they are implicitly understood through the applications.
Why Other Options Are Incorrect:
* Option AandOption Dboth incorrectly depict some relationships between the applications and their supporting technology services or servers, or miss certain dependencies.
* Option Bdoes not provide as clear a depiction of the virtualized infrastructure and how the applications relate to theMultimedia RepositoryandPersonal Securityservices.
Conclusion:
Option Cprovides the most accurate and complete description of theArchiSurance Mobile solutionand the supporting technology, as required by the scenario. It correctly illustrates the relationships between the applications, the virtual servers, and the supporting technology services according to ArchiMate® 3.2 principles.

NEW QUESTION # 12
Please read this scenario prior to answering the question
The ArchiSurance senior management, board members, customers, and major stockholders have expressed long-standing concerns regarding the business continuity risks associated with relying on a single data center.
Located in an area prone
to flooding, earthquakes, and occasional water leaks from the cafeteria above, the current data center has significant vulnerabilities.
To address these concerns and mitigate the risks, ArchiSurance has developed a comprehensive plan to relocate its existing data center to two separate ready-to-use data centers in different cities. As a major undertaking, the approval of the Board of Directors is required to proceed with the project.
The primary objectives of the data center move are to reduce the risk of business interruptions, reduce both planned and unplanned downtime for critical applications, and provide reassurance to ArchiSurance stakeholders. Ensuring minimal disruption during the transition is crucial. However, several constraints make the planned migration to the new data centers particularly challenging. Certain critical ArchiSurance applications cannot be offline for more than one hour, and any planned downtime must be restricted to specific four-hour windows on weekends. Additionally, the migration cannot take place during quarterly or year-end closing periods to avoid disrupting critical processing operations.
ArchiSurance management has devised a multi-phase data center transformation program to facilitate a smooth transition. Each phase is critical for establishing stable and fully functional data center configurations throughout the transformation process. The initial phase entails detailed scheduling and planning to develop a comprehensive transformation plan aligned with ArchiSurance's timing and scheduling requirements. During the second phase, ArchiSurance will procure the necessary hardware and software for the new data centers, while also seeking refunds for the hardware and software in the current data center once it is decommissioned. The third phase involves setting up the new data centers and conducting parallel testing of the new hardware and software alongside the existing production environment. The transition between the old and new data centers occurs in the fourth phase, followed by the fifth phase, which is the decommissioning of the old data center. This involves returning the hardware and software to obtain the contracted refunds. Each phase, from the second to the fifth, is initiated once specific conditions outlined in the previous phase have been met.
Refer to the Scenario
The program manager overseeing the data center transformation has asked you to model an outline of the implementation plan which has three stable states defined. You should show the deliverables associated with each plateau in connection with the physical elements. Additionally, you need to show how each phase contributes to achieving a stable state for the data center transformation.
Which of the following answers provides the best description?
  • A. A diagram of a data center Description automatically generated
  • B. A diagram of a software process Description automatically generated
  • C. A diagram of a software system Description automatically generated
  • D. A diagram of a data processing process Description automatically generated

Answer: D
Explanation:
This question focuses on modeling the implementation plan for the data center transformation atArchiSurance. The goal is to represent how the different phases of the project contribute to achieving the three stable states, orplateaus, while illustrating the deliverables connected to these plateaus and the physical elements involved.
Key ArchiMate® 3.2 Concepts Applied:
* Plateauslateaus representintermediate stable stateswithin an architecture transformation, showing the condition of the architecture at specific moments in time. In this scenario, the plateaus correspond to the stable data center configurations at different phases:
* Plateau 1:Only the old data center is in use.
* Plateau 2:Both the old and new data centers are in use simultaneously.
* Plateau 3:Only the new data center is in use, and the old data center is fully decommissioned.
* Physical Elements:These refer to thedata centers,hardware,software, andnetworksthat make up the infrastructure being migrated. These should be clearly depicted in connection with each phase of the transformation program.
* Deliverables and Phases:Each phase of the transformation process includes specific deliverables, such as:
* Procurement of new hardware and software.
* Setting up and testing the new data centers.
* Transitioning between the old and new data centers.
* Dismantling the old data centerand returning its hardware for refunds.
* Work Packages and Dependencies:Work packages represent activities or tasks in ArchiMate® and are connected to the plateaus. These must be modeled with proper sequencing, showing how each phase contributes to reaching the next stable state.
Why Option A is Correct:
* Option Aaccurately represents the three plateaus (stable states) and clearly illustrates the deliverables (e.g., the new data center, tested hardware and software, and dismantled old data center) in relation to each phase of the transformation.
* The connections between the physical elements (such as the centralized data center, distributed data center, and backup data center) are properly displayed and aligned with the described multi-phase process.
* The phases are laid out logically, showing how each phase (e.g., procurement, testing, transition) leads to the next stable state (plateau), following the principles of aplateauandwork packagetransformation in ArchiMate®.
* Theflow of deliverablesfrom one plateau to the next is consistent with the need for dependencies (e.g., the new data center cannot be fully active until the hardware and software have been tested in parallel).
Why Other Options Are Incorrect:
* Option BandOption Ddo not show the relationships between the phases and the stable states as clearly asOption A. They lack some critical connections or do not accurately represent the progression between plateaus and the physical infrastructure.
* Option Cis closer but misses important sequencing in how the work packages (activities) and plateaus interact, leading to an incomplete representation of the transformation.
Conclusion:
Option A provides the most complete and accurate description based on ArchiMate® 3.2 modeling principles.
It correctly demonstrates how each phase of the data center transformation contributes to achieving the stable states (plateaus) and ensures that the physical elements, work packages, and deliverables are properly aligned.

NEW QUESTION # 13
Please read this scenario prior to answering the question
The IT Operations (IT Ops) department at ArchiSurance has five core responsibilities, each encompassing a dedicated business process: (1) Batch Operations (Batch Ops), (2) Online Operations (Online Ops), (3) Security Operations (Security Ops), (4) User Support and (5) Continuous Improvement. Service level agreements (SLAs) are in place for Batch Ops and Online Ops, and each Ops process generates monitoring data that is utilized by the Continuous Improvement process.
The System Ops category consists of Batch Ops, Online Ops, and Security Ops, each having an incident management sub-process. These sub-processes are triggered by Batch, Online, and Security Incidents, respectively. In the initial stages of the incident management sub-processes, an Incident Alert is shared with the other System Ops processes by posting it to the Alert Buffer.
Batch Ops relies on a schedule that outlines all batch jobs and their dependencies. This schedule serves two sub-processes: Batch Planning, which updates the schedule for use by the Execution Management sub-process.
The Batch Ops process relies on a suite of interconnected applications to facilitate its operations. Among these applications, the Batch Scheduler plays a vital role by allowing users to manage a comprehensive database of jobs, job schedules, and dependencies. It effectively launches batch jobs according to the information stored in the database.
Working in conjunction with the Batch Scheduler, the Batch Monitor application utilizes the job schedules as a reference point to monitor job execution. It identifies any exceptional conditions that may arise during the execution process. To ensure effective handling of these exceptions, the Batch Monitor communicates the information to both the Batch Scheduler and the Incident Handler applications through the previously mentioned Alert Buffer.
The Incident Handler application operates based on a defined set of business rules. It uses these rules to determine the relevant systems and individuals that need to be notified in the event of each incident.
Subsequently, the Incident Handler
application generates appropriate notifications according to these determinations.
Recognizing the criticality of the Batch Scheduler, Batch Monitor, and Incident Handler applications, ArchiSurance has implemented redundant hosting arrangements across multiple geographically distributed data centers. In each data center, these three applications are supported by fully redundant virtual server clusters. Each cluster is connected to two site local area networks, both of which are further linked to separate storage array hardware devices.
Refer to the scenario
As part of an IT service management initiative, you have been assigned the task to show how applications and technology support the Batch Ops process. This should show the relationships between the applications, their functions, the data they access, and the technology that hosts the applications and data, along with the networks that connect the servers. It is only necessary to model a single data center.
Which of the following answers provides the most complete and accurate model?
  • A. A diagram of a work flow Description automatically generated
  • B. A diagram of a firefighter Description automatically generated
  • C. A diagram of a software system Description automatically generated with medium confidence
  • D. A diagram of a work flow Description automatically generated

Answer: B
Explanation:
The correct answer isCas it provides the most complete and accurate model according to the ArchiMate® 3 framework and the given scenario.
Here's why:
* Business Processes and Sub-Processes:
* Batch Operations (Batch Ops)is one of the core responsibilities in IT Operations, and its processes are modeled clearly. TheBatch Scheduleris responsible for managing batch jobs, schedules, and dependencies.
* TheBatch Monitoris correctly shown to monitor the job execution and notify exceptions using theAlert Buffer.
* TheIncident Handleris used to notify relevant systems and individuals, triggered by the incident detection fromBatch Monitor. This is modeled by the use of incident handling rules and notifications.
* Application Layer (Application Components and Functions):
* TheBatch Scheduler,Batch Monitor, andIncident Handlerare accurately depicted as the main applications. These applications are crucial for managing job scheduling, monitoring execution, and handling incidents.
* These applications share the same virtual server cluster, which is an important detail reflecting redundancy and high availability, which was mentioned in the scenario.
* The interrelationships between applications are accurately depicted: theBatch Schedulerlaunches jobs, theBatch Monitorchecks their status, andIncident Handlerdeals with exceptions.
* Data Access:
* TheBatch Scheduleraccesses and updates batch jobs and schedules, and this is represented clearly.
* TheIncident dataandIncident notificationsare accurately modeled as being used byIncident Handler.
* Technology Layer:
* TheVirtual server cluster,Storage arrays, andSite Local Area Networksare appropriately connected to support the application infrastructure.
* Redundancy is shown through the use of multiple storage arrays and network connections, as described in the scenario.
* Accuracy in Relationship Types (ArchiMate® 3) References:
* The relationships between components are modeled using ArchiMate® 3 standards, such as flow relationships between the Batch Monitor and Alert Buffer or between the Incident Handler and storage components.
* Triggeringrelationships exist between the applications that manage batch jobs and the monitoring
/notification process, ensuring correct job execution and incident handling.
Conclusion:AnswerCis the most complete model, as it accurately reflects the roles of the various applications, their interactions, and the underlying technology components in support of theBatch Ops process, following the guidelines and modeling standards of ArchiMate® 3.

NEW QUESTION # 14
Please read this scenario prior to answering the question
ArchiSurance has decided to leverage its financial expertise by offering defined contribution retirement plans.
Each trading day, ArchiSurance submits consolidated mutual fund trading transactions to a stock exchange on behalf of its retirement plan participants.
The daily mutual fund trading cycle consists of four key processes: Transaction capture, pricing, trading and reconciliation. Transaction capture consists of two sub-processes: manual exchange and loans and distributions (L&D). For transaction capture, retirement plan participants use an online account management application to enter manual fund exchange transactions. For L&D, plan participants use a separate application to enter requests. The L&D application determines whether the request can be fulfilled based on the mutual fund balances held in each plan balances and a set of business rules. Each day's captured manual exchange transactions accumulate in a transaction database.
ArchiSurance contracts with a third-party information service to receive a file of mutual fund prices at the close of each trading day. The pricing application uses this file to convert captured transaction into trades, and then validates each trade against the mutual fund balances held in each plan. The pricing application generates a trade file with the minimum number of trades necessary. The trading application sends this file to an external trading service. When the trading application receives a confirmation file back from the trading service, it passes it to the reconciliation application, which updates the plan recordkeeping database.
The lead application Architect has decided to merge the pricing application, the trading application and the reconciliation application into one application, which will be serving the pricing, trading and reconciliation processes respectively. The reason for this is that maintenance costs for these three components are too high and the performance is too slow. This implementation will increase the performance and lower the maintenance cost significantly.
The CIO has agreed on this plan, but wants this to be done in two phases, each in a separate project. Phase 1 should include the merger of the Trading and Pricing applications. Phase 2 should then merge the merged applications with the Reconciliation application respectively. Each project phase has a number of defined deliverables. Phase 1 has two deliverables, TraPri application implemented and tested' and 'Active TraPri application', whichtogether form a first transition architecture. Phase 2 has two deliverables, 'Recon 2.0 application implemented and tested' and 'Back-up applications phased out', which together form the second transition architecture. These two projects are part of the ArchiSurance application integration program scheduled for the next 6 months.
Refer to the Scenario
You have been asked by the lead application architect to show how the applications used for daily trading can be migrated. This should include a description of the work packages, deliverables and transition architectures.
Which of the following answers best describes the applications and migration plan?
  • A. A diagram of a trading application AI-generated content may be incorrect.
  • B. A diagram of a process flow AI-generated content may be incorrect.
  • C. A diagram of a process flow AI-generated content may be incorrect.
  • D. A diagram of a process AI-generated content may be incorrect.

Answer: B
Explanation:
We need to determine the best model that:
* Shows the current applications and their functions- Pricing, Trading, and Reconciliation applications.
* Represents the migration phases-
* Phase 1:Merges the Trading and Pricing applications intoTraPri.
* Phase 2:MergesTraPriwith the Reconciliation application to createRecon 2.0.
* Includes transition architectures- Each phase has distinct deliverables marking the transition from old applications to new merged applications.
* Shows the work packages and dependencies- The sequence of activities leading to the final implementation.
Why D is the Best Choice:
#Clearly distinguishes baseline (existing) applications and the new applicationsafter the migration.# Illustrates the two transition states correctly-
* First transition:Implementation and activation of theTraPriapplication.
* Second transition:Implementation ofRecon 2.0and phase-out of backup applications.#Depicts the migration process sequentially- Ensuring a clear understanding of how the applications evolve over time.#Work packages and deliverables are well structured- Aligning with the phases described in the scenario.
Why Not A, B, or C?
* Aoes not correctly represent the transition phases and their deliverables.
* Backs clarity in differentiating baseline applications from transition architectures.
* C:Misrepresents dependencies and transition states, making the migration process unclear.

NEW QUESTION # 15
......
For there are some problems with those still in the incubation period of strict control, thus to maintain the OGA-032 quiz guide timely, let the user comfortable working in a better environment. You can completely trust the accuracy of our The Open Group OGA-032 Exam Questions because we will full refund if you failed exam with our training materials.
OGA-032 Latest Test Guide: https://www.dumpexam.com/OGA-032-valid-torrent.html
2026 Latest DumpExam OGA-032 PDF Dumps and OGA-032 Exam Engine Free Share: https://drive.google.com/open?id=1OspmEIjUen1bZaYfS-Cz9Ltiti7MFnYU