Firefly Open Source Community

   Login   |   Register   |
New_Topic
Print Previous Topic Next Topic

ハイパスレ`トのPDD恷仟Y匯指栽鯉-嗤慎弔PDD庁M貨}

136

Credits

0

Prestige

0

Contribution

registered members

Rank: 2

Credits
136

ハイパスレ`トのPDD恷仟Y匯指栽鯉-嗤慎弔PDD庁M貨}

Posted at yesterday 12:43      View20 | Replies0        Print      Only Author   [Copy Link] 1#
2026定GoShikenの恷仟PDD PDFダンプおよびPDDYエンジンのo創慌嗤https://drive.google.com/open?id=1l1Hzjx7xIYY8vqxsHihZtEyF8bx3cXKT
GoShikenのNCARBのPDDYトレ`ニングY創は屎_來が互くて、カバ`楕もレい。あなたがNCARBのPDDJ協Yに栽鯉するのに恷も措くて、恷も駅勣な僥縮可です。うちのNCARBのPDD}鹿を澓したら、暴たちは匯定gでo創厚仟サ`ビスを戻工することができます。もし僥縮可は}があれば、賜いはYに音栽鯉になる栽は、畠~卦署することを隠^いたします。
NCARB PDD J協Yの竃}譯
トピック竃}
トピック 1
  • Project Manual & Specifications: This section of the exam measures the skills of Specifications Writers and emphasizes the importance of developing documentation that goes beyond drawings. Candidates must understand how to identify and prioritize elements needed to prepare, maintain, and refine both the project manual and project specifications. It also assesses the ability to align and coordinate these specifications with the construction documents to ensure consistency and accuracy.
トピック 2
  • Construction Documentation: This section of the exam measures skills of Project Architects and addresses the creation and management of project documentation. Candidates are expected to demonstrate knowledge of documenting building design and site features, preparing detailed architectural drawings, and applying industry standards to produce a coordinated set of construction documents. The section also includes understanding how project changes impact documentation and how to communicate these updates effectively to both the design team and the client.:
トピック 3
  • Construction Cost: This section of the exam measures the skills of Construction Managers and focuses on the financial side of project execution. It evaluates the ability to analyze construction cost estimates to confirm that they align with project design intent and budgetary constraints. Although this is the smallest section, it is critical for ensuring projects remain feasible and economically viable.
トピック 4
  • Codes & Regulations: This section of the exam measures skills of Building Code Specialists and examines how codes and regulations apply at a detailed level during documentation. Candidates are expected to demonstrate knowledge of compliance with the International Building Code (IBC) as well as other specialty regulations, as well as how to interpret and apply these standards to ensure design and documentation meet legal and safety requirements.
トピック 5
  • Integration of Building Materials & Systems: This section of the exam measures the skills of Architectural Designers and focuses on the ability to resolve and integrate various building systems into cohesive project goals. It covers analyzing architectural systems and technologies, determining the size of structural, mechanical, electrical, and plumbing systems, and incorporating specialty systems such as acoustics, lighting, security, and communications. It also evaluates the ability to detail how multiple building systems work together and to coordinate across disciplines to achieve a unified design.

PDD庁M貨} & PDD嚠誑YIT室gの識堀なk婢につれて、ITJ^Yの}は械に筝されています。したがって、GoShikenのPDD}鹿も~えずに厚仟されています。それに、GoShikenの縮可を澓すれば、GoShikenは匯定gのo創アップデ`ト・サ`ビスを戻工してあげます。}が厚仟される泙蝓GoShikenは岷ちに恷仟井のPDDY創を僕ってあげます。そうすると、あなたがいつでも恷仟バ`ジョンのY創を隔っていることが隠^されます。GoShikenはあなたがYに栽鯉するのを廁けることができるだけでなく、あなたは恷仟の岑Rを僥ぶのを廁けることもできます。このような殆這らしいY創をぜひ毛さないでください。
NCARB ARE 5.0 Project Development and Documentation Exam J協 PDD Y} (Q38-Q43):| # 38
A significant advantage of glass-fiber-reinforced concrete panels over architectural precast concrete panels is which one of the following?
  • A. Increased quality control
  • B. Decreased weight
  • C. Decreased fabrication time
  • D. Increased strength
屎盾B
盾h
Glass-fiber-reinforced concrete (GFRC) panels offer several advantages compared to architectural precast concrete panels:
GFRC panels are lighter due to their thin profile and use of fiber reinforcement, reducing structural load and facilitating installation.
Precast concrete panels are heavier and thicker.
Strength of GFRC is adequate but typically not higher than traditional precast.
Quality control and fabrication time are comparable or vary depending on the project and fabrication process.
Therefore, the significant advantage is decreased weight.

| # 39
Which of the following siding types should only be applied vertically?
  • A. Plain bevel
  • B. V-shiplap
  • C. V-groove tongue and groove
  • D. Board and batten
屎盾D
盾h
Board#and#batten is a vertical siding system: wide vertical boards with narrow battens covering the joints; its detailing, drainage, and expansion behavior are intended for vertical application only.
By contrast, plain bevel (lap) siding is typically horizontal; V#shiplap and V#groove T&G can be detailed either direction depending on manufacturer, but are commonly horizontal on walls.
PDD References: Exterior wall cladding and detailing under "Materials & Assemblies-Exterior enclosure," CSI Div. 06 & 07 application details.

| # 40
Coordination of a motorized movable partition used to subdivide a gymnasium should include which of the following?
  • A. Fire protection engineer and the electrical engineer
  • B. Structural engineer and the electrical engineer
  • C. Structural engineer and the mechanical engineer
  • D. Fire protection engineer and the furniture and equipment consultant
屎盾B
盾h
A motorized movable partition used to subdivide a gymnasium requires coordination with:
The structural engineer: to ensure the partition loads are supported, especially if the system is suspended or has track supports.
The electrical engineer: to provide power for the motorized operation, controls, and safety systems.
Mechanical and fire protection engineers are typically less involved unless the partition affects HVAC zones or fire separation requirements, and furniture consultants typically do not deal with structural or electrical coordination.
References:
NCARB ARE 5.0 Review Manual, Building Systems and Coordination chapter
Manufacturer installation guidelines for motorized partitions
MEP coordination best practices

| # 41
An architect is coordinating the mechanical and structural systems in a building with exposed ceilings. The HVAC ducts are interfering with a large concrete beam in the open office area.
  • A. Increase the ceiling height
  • B. Shift the HVAC ducts below the beam
  • C. Request the mechanical engineer to reroute the ductwork
  • D. Relocate the beam to accommodate the ductwork
屎盾C
盾h
In PDD, the architect must coordinate consultant drawings. When a conflict exists (here, duct vs. beam), the best course is to ask the responsible engineer (mechanical) to reroute the ductwork to clear the beam. As per ARE 5.0 Handbook Objective 3.1, the architect is expected to "coordinate building systems and their integration."

| # 42
A family-owned apple farm in the Upper Midwest is taking advantage of a change in the local zoning code that added a new Agri-Tourism class in the existing farm zone. This allows the Owner to build a new facility on their existing site. The building will be open to the public and include a brewery, distillery, tap room, and market. The architect is ready to submit the drawings to the Owner for the 50% construction documents review.
To accommodate a compressed construction schedule, the Owner will be utilizing a design-build process. The Contractor has submitted the Pre-Engineered Metal Building (PEMB) shop drawings to the Architect for review, due to the lead time on this critical path item. Once construction begins, farming operations must be able to continue uninterrupted.
Key project information includes:
* Brewing and distilling will operate year-round.
* Brewery will initially include four fermenting tanks. Owner has requested space for at least two additional tanks. Potential expansion will be based on future sales.
* Distillery will produce 16% alcohol, which is classified as a flammable liquid. Fire separations are required.
* Tap Room is designed with seating for 300 people, not including exterior patio seating. It will have views to the working orchards and the historic buildings on site.
* Tap Room is scheduled to be open from August through November. Owner would like options to extend operating dates based on popularity.
* The Market area will feature local farm products and is not conditioned.
* Entire building will be fully sprinklered.
* Selected building materials are low-maintenance, as requested by the Owner, for durability and to reflect the nature of a working farm.
* Mechanical and electrical systems will be hung from the building structure. These loads are included in PEMB shop drawings.
* Public water and sewer is not available at the Project Site.
* Occupancy sensors are included to reduce utility costs and achieve energy conservation requirements.
The following resources are available for your reference:
* Architectural Drawings, including plans, elevations, sections, and schedules
* Consultant Drawings, including structural, HVAC, power distribution, and plumbing
* PEMB Shop Drawings
* Design and Construction Schedule
* Specification Excerpts, showing relevant spec sections
* IBC and ADA Excerpts, showing relevant code and accessibility sections
* After reviewing the documents, the architect discovers a coordination issue in the corridor.
Per the current energy code, the building envelope requirement for walls above grade in this climate zone is R13 + R10c.i.
What specification section must be added to the project?
  • A. Specification Section 075419: Polyvinyl-Chloride (PVC)
  • B. Specification Section 072119: Foamed-In-Place Insulation
  • C. Specification Section 072100: Thermal Insulation
屎盾C
盾h
The energy code requirement R-13 + R-10 c.i. (continuous insulation) for above-grade walls necessitates adding/confirming a thermal insulation section that covers both cavity insulation (R-13) and continuous exterior insulation (R-10) (e.g., rigid boards, mineral wool boards). Section 072100-Thermal Insulation is the correct overarching specification.
072119 Foamed-In-Place is a product-specific section and not required unless using SPF as the c.i.
075419 PVC is roofing.
PDD Reference: IECC/ASHRAE 90.1 envelope compliance; CSI Div. 07-Thermal Insulation (072100) including rigid continuous insulation requirements

| # 43
......
PDD庁MYを澓した岷瘁に、NCARBYの籏Y創をダウンロ`ドしてYの笋鬚垢襪海箸できます。 Yの撹孔のQ泣から、rgが嶷勣な勣殆であることはレくJRされています。 PDDトレ`ニングY創の笋堀MやすrgがLいほど、Yに栽鯉する辛嬬來が互くなります。 そして、GoShikenのPDDの僥トレントを聞喘すると、ARE 5.0 Project Development and Documentation ExamYファイルの塘佚を棋つために恷兜にMやしたrgを恷寄泙忙醵辰任ます。 PDDテスト簫Yが匯違寄\に鞭け秘れられる尖喇があります。
PDD庁M貨}: https://www.goshiken.com/NCARB/PDD-mondaishu.html
2026定GoShikenの恷仟PDD PDFダンプおよびPDDYエンジンのo創慌嗤https://drive.google.com/open?id=1l1Hzjx7xIYY8vqxsHihZtEyF8bx3cXKT
Reply

Use props Report

You need to log in before you can reply Login | Register

This forum Credits Rules

Quick Reply Back to top Back to list