Firefly Open Source Community

   Login   |   Register   |
New_Topic
Print Previous Topic Next Topic

[General] Pass Guaranteed 2026 NCARB Pass-Sure Project-Management: Latest ARE 5.0 Project

138

Credits

0

Prestige

0

Contribution

registered members

Rank: 2

Credits
138

【General】 Pass Guaranteed 2026 NCARB Pass-Sure Project-Management: Latest ARE 5.0 Project

Posted at 1/22/2026 03:59:04      View:49 | Replies:0        Print      Only Author   [Copy Link] 1#
BTW, DOWNLOAD part of PassTestking Project-Management dumps from Cloud Storage: https://drive.google.com/open?id=1tgDfeoCJBfkxR091wT7_3NwU8AU-YY3T
As you know, we are now facing very great competitive pressure. We need to have more strength to get what we want, and Project-Management exam dumps may give you these things. After you use our study materials, you can get Project-Management certification, which will better show your ability, among many competitors, you will be very prominent. The 99% pass rate is the proud result of our study materials. If you join, you will become one of the 99%. I believe that pass rate is also a big criterion for your choice of products, because your ultimate goal is to obtain Project-Management Certification. In Project-Management exam dumps, you can do it.
Achieving the NCARB Project-Management test certification can open up unlimited possibilities for your future career, if you are truly dedicated to jump out your career and willing to make additional learning and extra income. PassTestking Project-Management exam dumps can help you to overcome the difficulty—from understanding the necessary and basic knowledge to passing the Architect Registration Examination ARE 5.0 Project Management (PjM) Exam exam test. The goal of NCARB Project-Management is to help our customers optimize their IT technology by providing convenient, high quality Architect Registration Examination exam prep training that they can rely on. NCARB Project-Management sure pass exam dumps empower the candidates to master their desired technologies for their own Architect Registration Examination exam test.Dear every one, passing the NCARB Project-Management actual test is an easy case for you.
New Project-Management Test Vce Free & Project-Management Valid Test PrepGenerally speaking, the clients will pass the test if they have finished learning our Project-Management test guide with no doubts. The odds to fail in the test are approximate to zero. But to guarantee that our clients won’t suffer the loss we will refund the clients at once if they fail in the test unexpectedly. The procedures are very simple and the clients only need to send us their proofs to fail in the Project-Management test and the screenshot or the scanning copies of the clients’ failure scores. The clients can consult our online customer staff about how to refund, when will the money be returned backed to them and if they can get the full refund or they can send us mails to consult these issues.
NCARB ARE 5.0 Project Management (PjM) Exam Sample Questions (Q58-Q63):NEW QUESTION # 58
An architecture firm has a C401 agreement with their consultants for a new design-bid-build residential tower.
The architect has approved a schedule provided by the mechanical engineer that includes a two-week quality control review after each delivery milestone.
During the design development phase, the owner requests that the architect change the 8,000-square-foot business center amenity for tenants to a private restaurant. The mechanical engineer informs the architect that their schedule must be extended by four weeks to meet the owner's request.
What should the architecture firm do first to maintain the start of construction?
  • A. Request that compensation be adjusted by the owner to reflect the change in scope.
  • B. Approve the design loads of the new mechanical system following the next quality control review.
  • C. Receive the owner's approval of the schedule change in writing from the consultant.
  • D. Change the C401 agreement to reflect the additional four-week extension.
Answer: A
Explanation:
When an owner requests a significant change during the design development phase-such as changing an amenity space from a business center to a private restaurant-this constitutes achange in scope. Such changes often require additional design work, engineering effort, and potentially extended schedules.
The mechanical engineer has indicated the schedule must be extended by four weeks due to this scope change.
To maintain project momentum and avoid delays, the architecture firm shouldfirst address the issue of compensationfor this added scope and extended time. This ensures that the consultants are compensated fairly before additional work proceeds.
* Option Ais the correct first step: The architect should request the owner to approve an adjustment to compensation reflecting the additional scope and time required.
* Option B(approving design loads) is premature before addressing scope and compensation changes.
* Option C(receiving owner's written approval of the schedule change) is important but generally follows agreement on compensation and scope adjustment.
* Option D(changing the C401 agreement to reflect schedule extension) might be required eventually but the initial and most critical step is securing compensation approval from the owner before contract modifications.
This aligns with standard project management practices and AIA contract guidelines that emphasize properly managing changes in scope, compensation, and schedule to avoid disputes and maintain project control.
References from ARE 5.0 Project Management (PjM) division:
* AIA Document C401 (Architect-Consultant Agreement) - managing scope changes, compensation adjustments, and schedule modifications
* Project Management best practices for scope, schedule, and compensation control
* NCARB ARE 5.0 PjM study materials on change management during design phases
* Contract administration guidance on coordinating owner-consultant agreements when scope changes occur

NEW QUESTION # 59
Which project delivery method allows the owner to engage the architect, contractor, and key consultants in a single collaborative contract?
  • A. Construction Manager at Risk (CMAR)
  • B. Design-Build
  • C. Design-Bid-Build
  • D. Integrated Project Delivery (IPD)
Answer: D
Explanation:
Integrated Project Delivery (IPD) is a project delivery method characterized by a single, multiparty contract involving the owner, architect, contractor, and key consultants. IPD promotes early collaboration, shared risk/reward, and transparency to optimize project outcomes. This contrasts with traditional methods like Design- Bid-Build where contracts are separate. ARE 5.0 PjM includes IPD as a critical topic, focusing on teamwork, roles, and responsibilities unique to this delivery method.

NEW QUESTION # 60
Who is responsible for verifying the accuracy of the contractor's payment application?
  • A. Contractor's accountant
  • B. Owner
  • C. Construction manager
  • D. Architect
Answer: D
Explanation:
The architect reviews the contractor's payment applications to verify work progress aligns with the schedule of values and contract documents. The architect recommends payment amounts to the owner but does not release funds. This function protects owner interests and ensures proper contract administration, as emphasized in ARE 5.0 PjM.

NEW QUESTION # 61
An architect is working on a large renovation project with an AIA B101 contract. The owner decides to contract separately with an electrical engineer and a security firm. The security firm asks the engineer and architect to coordinate the details for a new card reader access control system.
What is the first step the architect should take?
  • A. Request authorization from the owner to provide additional services
  • B. Provide coordination drawings to the engineer
  • C. Ask the engineer to provide details to the security firm
Answer: A
Explanation:
Since the security firm is a direct contractor of the owner, coordination falls outside the architect's basic scope as defined in AIA B101. Coordination with third parties not under the architect's consultant team typically constitutes additional services. Therefore, before taking on that responsibility, the architect must request written authorization from the owner.
References:
AIA B101-2017 § 4.2.1 and § 3.1.3
AHPP, 15th ed., Chapter 10 - Project Delivery and Consultant Coordination

NEW QUESTION # 62
Which document defines the architect's scope of services and responsibilities?
  • A. General Conditions (A201)
  • B. Owner-Architect Agreement (B101)
  • C. Contractor's Bid Proposal
  • D. Construction Documents
Answer: B
Explanation:
The Owner-Architect Agreement (AIA B101) is the primary contract outlining the architect's scope, deliverables, compensation, and responsibilities. It establishes the legal framework for services. General Conditions cover construction contract provisions; bid proposals are contractor documents; construction documents are design deliverables. ARE 5.0 PjM requires knowledge of these agreements to manage scope and responsibilities.

NEW QUESTION # 63
......
Individuals who pass the ARE 5.0 Project Management (PjM) Exam (Project-Management) certification exam demonstrate to their employers and clients that they have the knowledge and skills necessary to succeed in the industry. PassTestking is aware that preparing with outdated ARE 5.0 Project Management (PjM) Exam (Project-Management) study material results in a loss of time and money.
New Project-Management Test Vce Free: https://www.passtestking.com/NCARB/Project-Management-practice-exam-dumps.html
Our Architect Registration Examination Project-Management reliable test vce will firstly help you to build a complete structure of IT knowledge, NCARB Latest Project-Management Study Materials Practicing what you are going to face in the real exam, builds your confidence, The free demo is a part of our real New Project-Management Test Vce Free - ARE 5.0 Project Management (PjM) Exam latest Pass4sures questions, and in the demo you will have access to get a rough idea of our New Project-Management Test Vce Free - ARE 5.0 Project Management (PjM) Exam valid study vce, what's more, you will be able to get to know what it is look like after opening the software as well as the usage of our software, Our NCARB Project-Management practice exams simulate the real thing, so you can experience the pressure and environment of the actual ARE 5.0 Project Management (PjM) Exam (Project-Management) test before the day arrives.
By Chase Jarvis, They will set up a storefront where your users can pay for your application, Our Architect Registration Examination Project-Management Reliable Test Vce will firstly help you to build a complete structure of IT knowledge.
ARE 5.0 Project Management (PjM) Exam Pass4sure Test - Project-Management Pdf Vce & Project-Management Latest ReviewsPracticing what you are going to face in the real exam, builds your Latest Project-Management Study Materials confidence, The free demo is a part of our real ARE 5.0 Project Management (PjM) Exam latest Pass4sures questions, and in the demo you will have access to get a rough idea of our ARE 5.0 Project Management (PjM) Exam valid study vce, what's Project-Management more, you will be able to get to know what it is look like after opening the software as well as the usage of our software.
Our NCARB Project-Management practice exams simulate the real thing, so you can experience the pressure and environment of the actual ARE 5.0 Project Management (PjM) Exam (Project-Management) test before the day arrives.
The only difference between PC New Project-Management Test Vce Free test engine and Online test engine is using operating system.
P.S. Free 2026 NCARB Project-Management dumps are available on Google Drive shared by PassTestking: https://drive.google.com/open?id=1tgDfeoCJBfkxR091wT7_3NwU8AU-YY3T
Reply

Use props Report

You need to log in before you can reply Login | Register

This forum Credits Rules

Quick Reply Back to top Back to list