Firefly Open Source Community

   Login   |   Register   |
New_Topic
Print Previous Topic Next Topic

[Hardware] Project-Management考試證照,Project-Management題庫分享

130

Credits

0

Prestige

0

Contribution

registered members

Rank: 2

Credits
130

【Hardware】 Project-Management考試證照,Project-Management題庫分享

Posted at 5 hour before      View:5 | Replies:0        Print      Only Author   [Copy Link] 1#
NCARB的Project-Management考試其實是一個技術專家考試, NCARB的Project-Management考試可以幫助和促進IT人員有一個優秀的IT職業生涯,有了好的職業生涯,當然你就可以為國家甚至企業創造源源不斷的利益,從而去促進國家經濟發展,如果所有的IT人員都這樣,那麼民富則國強。我們Fast2test NCARB的Project-Management考試培訓資料可以幫助IT人員達到這一目的,保證100%獲得認證,如果需要思考,還不如果斷的做出決定,選擇我們Fast2test NCARB的Project-Management考試培訓資料。
NCARB Project-Management 考試大綱:
主題簡介
主題 1
  • Contracts: This section of the exam measures the skills of project managers and covers the analysis of contracts that govern the relationships between architects, owners, contractors, and consultants. It highlights verifying adherence to agreements, interpreting key contractual elements, and ensuring consultant work is properly integrated into the project.
主題 2
  • Project Execution: This section of the exam measures skills of architectural associates and covers the management of project execution through administrative procedures rather than design decisions. It addresses evaluating budgets, managing scope changes, preparing project documentation in line with delivery methods, and securing necessary approvals from relevant authorities.
主題 3
  • Resource Management: This section of the exam measures the skills of project managers and covers how to determine the right team composition and manage time allocation for successful project delivery. It focuses on evaluating criteria for assembling teams and ensuring resources are properly managed to execute the project within agreed terms.
主題 4
  • Project Work Planning: This section of the exam measures the skills of architectural associates and covers the development and communication of an effective project work plan. It emphasizes maintaining schedules, setting clear criteria for work planning, and ensuring consistent communication with stakeholders, including owners, contractors, consultants, and internal staff.
主題 5
  • Project Quality Control: This section of the exam measures skills of project managers and covers procedures for ensuring quality and maintaining the Standard of Care throughout the project. It focuses on applying regulatory requirements, reviewing documentation for quality, reducing risks and liabilities, and managing the design process to preserve its objectives

Project-Management題庫分享,Project-Management證照考試Project-Management 認證對於雇員和雇主來說都有好處。對雇員來說,它包括技術可信度,繼續教育和事業升遷的機會,更多的工作滿足感。但是 NCARB Project-Management 考試是考生所能接受的考試,對有心應考的人來說,實在是不小的負擔。若第一次沒通過,又需一大筆的費用重考。如果您正在准備 NCARB 的 Project-Management 考試以獲得適當的知識和技能,Fast2test 考題網的練習題和答案,為您節約寶貴的時間以及金錢并順利通過考試。
最新的 Architect Registration Examination Project-Management 免費考試真題 (Q35-Q40):問題 #35
During the predesign phase of a project, the architect discovers that the owner's budget is insufficient to meet the program requirements.
Which of the following should the architect do?
  • A. Advise the owner to increase the budget.
  • B. Inform the owner that the project as budgeted is not feasible.
  • C. Recommend that the owner complete the project in two phases.
  • D. Scale down the program to meet the budget.
答案:B
解題說明:
Comprehensive Detailed Explanation:
During the predesign or programming phase, it is the architect's responsibility to advise the owner when the scope and budget are misaligned. The correct professional approach is to notify the owner that the program cannot be met within the current budget. Solutions (phasing or budget increase) may be discussed after this acknowledgment. The architect should not unilaterally scale down the program without owner input.
References:
NCARB ARE 5.0 Handbook - Budget evaluation in Programming/Predesign

問題 #36
A project achieves refinement and coordination in which of the following phases?
  • A. Schematic Design
  • B. Construction Documents
  • C. Design Development
答案:C
解題說明:
Design Development (DD) is the phase where schematic concepts are refined and systems are coordinated across disciplines. This includes structure, MEP, and materials. While Schematic Design focuses on high- level form and layout, and Construction Documents focus on detailed drawings/specifications, DD ensures integration and alignment before detailing.
References:
NCARB ARE 5.0 Handbook - Design phases
AIA B101 - Design Development phase scope

問題 #37
Evaluation and mitigation of indoor air quality in an existing facility assessment would include participation by which of the following? Check the three that apply.
  • A. Mechanical engineer
  • B. Electrical engineer
  • C. Structural engineer
  • D. Industrial engineer
  • E. Architect
  • F. Industrial hygienist
答案:A,E,F
解題說明:
Comprehensive Detailed Explanation:
Indoor air quality (IAQ) assessments require:
A). Architect - for identifying spatial and operational sources of contamination and coordinating remediation.
B). Industrial hygienist - for monitoring pollutants (e.g., mold, VOCs, CO2) and recommending mitigation strategies.
F). Mechanical engineer - for assessing HVAC system functionality, filtration, and ventilation strategies.
References:
NCARB ARE 5.0 Handbook - Existing building evaluations
CSI Division 01 (General Requirements) and 23 (HVAC)
EPA IAQ Tools for Schools Guidelines

問題 #38
Which document authorizes the contractor to proceed with work?
  • A. Notice to Proceed
  • B. Purchase Order
  • C. Certificate of Substantial Completion
  • D. Change Order
答案:A
解題說明:
The Notice to Proceed is a formal document issued by the owner or architect authorizing the contractor to begin work on the project and establishing the contract start date. Purchase orders are for procurement; change orders modify contracts; certificates of substantial completion recognize project milestones. ARE 5.0 PjM tests knowledge of construction administration documents.

問題 #39
After construction begins, an owner asks the architect to select a different roof material. The architect wants to manage the risk associated with this change.
  • A. Contact roofing suppliers to request product specifications to select a replacement.
  • B. Write a memorandum to the owner to describe the owner's request for a change.
  • C. Place a note in the project file to detail roof options and the final decision.
  • D. Contact the contractor to request a change order.
答案:B
解題說明:
Verified Answer
The correct risk management approach is to document the owner's request clearly before taking any action. A written memorandum becomes part of the formal record and clarifies scope, timing, and potential cost implications. This protects the architect from misinterpretation or dispute.
Verbal or informal changes are a legal and professional risk.
Once documented, changes can proceed via appropriate channels (change order or construction change directive).
Reference: AIA B101 §4.2.2; A201 §7.3
NCARB ARE 5.0 Handbook - PjM Content Area 5: Project Execution

問題 #40
......
當你嘗試了我們提供的關於NCARB Project-Management認證考試的部分考題及答案,你可以對我們Fast2test做出選擇了,我們會100%為你提供方便以及保障。請記住能讓你100%通過NCARB Project-Management認證考試的就是我們的Fast2test。
Project-Management題庫分享: https://tw.fast2test.com/Project-Management-premium-file.html
Reply

Use props Report

You need to log in before you can reply Login | Register

This forum Credits Rules

Quick Reply Back to top Back to list