【General】 New LEED-AP-BD-C Exam Answers - Exam Dumps LEED-AP-BD-C Free

Posted at yesterday 11:25      View:4 | Replies:0        Print      Only Author   [Copy Link] 1#
2026 Latest Prep4cram LEED-AP-BD-C PDF Dumps and LEED-AP-BD-C Exam Engine Free Share: https://drive.google.com/open?id=1Shigo5A1x_P5Rt7fjgYijZ_BgGd9a8eI
The web-based USGBC LEED-AP-BD-C practice test software is designed explicitly for the LEED AP Building Design + Construction (LEED AP BD+C) exam. It is a well-known self-preparation tool that contains LEED-AP-BD-C Exam Questions approved by USGBC Certified Professionals. Our USGBC LEED-AP-BD-C exam questions are periodically updated and are similar to the real LEED AP Building Design + Construction (LEED AP BD+C) exam questions. The USGBC LEED-AP-BD-C Practice Test has a close resemblance with the actual USGBC LEED-AP-BD-C exam. Multiple This USGBC certification exam needs to be finished in a certain time duration, therefore USGBC LEED-AP-BD-C practice test allows candidates to practice in the allocated time set according to their own needs.
Our LEED-AP-BD-C exam guide has high quality of service. We provide 24-hour online service on the LEED-AP-BD-C training engine. If you have any questions in the course of using the bank, you can contact us by email. We will provide you with excellent after-sales service with the utmost patience and attitude. And we will give you detailed solutions to any problems that arise during the course of using the LEED-AP-BD-C learning braindumps. And our LEED-AP-BD-C study materials welcome your supervision and criticism.
Exam Dumps LEED-AP-BD-C Free, Actual LEED-AP-BD-C Test PdfAfter passing the USGBC LEED-AP-BD-C exam you can gain more career opportunities and feel confident to pursue a rewarding career in your professional life. You can enhance your earning, get an instant promotion, can use the USGBC LEED-AP-BD-C Certification badge, and will be ready to gain more job roles.
USGBC LEED-AP-BD-C Exam Syllabus Topics:
TopicDetails
Topic 1
  • Energy and Atmosphere: In this topic, LEED Green Associates focuses on building reuse, including historic building renovations. It covers material reuse strategies, enclosure materials, and permanently installed interior components into new designs.
Topic 2
  • Location and Transportation: This topic measures the skills of LEED Green Associates in sustainable development. It addresses critical factors in site selection, including development constraints and opportunities related to environmental considerations, and community connectivity concepts, such as walkability and street design, which are vital for promoting sustainable transportation options.
Topic 3
  • Indoor Environmental Quality: This domain measures the skills of LEED Green Associates in creating healthy indoor environments. It emphasizes the importance of maintaining adequate ventilation levels through both natural and mechanical means. Additionally, candidates will be assessed on topics such as tobacco smoke control measures.
Topic 4
  • Integrative Strategies: It emphasizes the importance of an integrative process. The topic also covers their knowledge about the value of teamwork in developing integrative green strategies and how they can collaborate throughout different project phases.
Topic 5
  • LEED Process: This topic tests the skills of  LEED Green Associates involved in green building initiatives. It focuses on various methods to achieve LEED goals, such as developing credit interpretation rulings and utilizing Regional Priority Credits to explore synergies within the LEED system.
Topic 6
  • Building Loads: This topic is focused on optimizing building performances through effective load management. It addresses design considerations such as building orientation and glazing selection while clarifying regional factors that influence these decisions.

USGBC LEED AP Building Design + Construction (LEED AP BD+C) Sample Questions (Q277-Q282):NEW QUESTION # 277
When should a preliminary water budget analysis be conducted?
  • A. After completion of schematic design
  • B. Before completion of schematic design
  • C. At the time the design development is completed
  • D. At the time the plumbing contractor is selected
Answer: B
Explanation:
A preliminary water budget analysis should be conducted before the completion of schematic design (B). Early analysis allows the design team to understand and integrate efficient water management practices into the building's layout and system design. Conducting this analysis at an early stage helps inform sustainable water use strategies and enables more effective decision-making on fixtures, water conservation technologies, and landscape design. This proactive approach aligns with LEED's emphasis on resource conservation in design.

NEW QUESTION # 278
Location and Transportation Credit, Reduced Parking Footprint calculations must include
  • A. parking within 1/4 mi. (0.40 km) radius of the project boundary
  • B. on-street parking in public rights-of-way
  • C. motorbike spaces
  • D. parking outside the project boundary but used by the project
Answer: D
Explanation:
This option requires the project to include all parking spaces that are outside the project boundary but are used by the project occupants, visitors, or customers in the calculations for the reduced parking footprint credit1.
This option ensures that the project accounts for the total parking demand and supply associated with the project, regardless of the location of the parking spaces2.

NEW QUESTION # 279
A decorative overhead light fixture is specified for a project that costs $1,500 USD and uses recycled water bottles as part of the diffuser shade. The shades are 10% of the overall weight of the fixture and are 50% post-consumer recycled content. Assuming no other portions of the fixture meet sustainability criteria, what would the contributing value of the fixture be?
  • A. $1,500
  • B. $75
  • C. $150
  • D. $750
Answer: B
Explanation:
Explanation
This option requires the project to calculate the contributing value of the fixture by multiplying the cost of the fixture by the percentage of recycled content by weight1. Since the shades are 10% of the overall weight of the fixture and are 50% post-consumer recycled content, the contributing value of the fixture is:
$1,500 x 10% x 50% = $75
References: = LEED v4: Building Design + Construction Guide, Recycled content | U.S. Green Building Council.

NEW QUESTION # 280
When the project occupancy is not known, which method is recommended?
  • A. Occupancy measured for eight hours, between 8 a.m. and 5 p.m., for all occupancy patterns
  • B. Default occupant density from ASHRAE 62.1-2010, Table 6-1
  • C. Default occupant density from ASHRAE 90.1-2010, Table G3.1.1A
  • D. Weekly average taken into account all the occupants in a typical 24-hour day of operation
Answer: B
Explanation:
This method is recommended when the project occupancy is not known, because it provides the default occupant density values for various space types, such as offices, classrooms, retail, and restaurants1. These values are based on the typical or average occupancy of similar spaces, and can be used to estimate the ventilation requirements and energy performance of the project2.

NEW QUESTION # 281
A LEED Building Design and Construction: New Construction office building's HVAC system includes hot water from a central utility plant. The central utility plant is owned and operated by a management company.
The office pays a flat fee for hot water, included as part of the leas. The management company does not meter or invoice for actual hot water consumption. For the project to meet the requirements for Energy and Atmosphere Prerequisite, Building-Level Energy Metering, an energy meter must be installed for
  • A. nothing, because the flat fee is included as part of the lease
  • B. hot water at the main service point
  • C. natural gas
  • D. nothing, because the energy source is outside of the project's scope
Answer: B
Explanation:
Explanation
An energy meter must be installed for hot water at the main service point for the project to meet the requirements for Energy and Atmosphere Prerequisite, Building-Level Energy Metering. According to the LEED v4 BD+C Reference Guide, this prerequisite requires that "all energy sources used by the building must be metered or submetered" 1. The hot water from the central utility plant is an energy source used by the building, even if it is not directly paid by the office. Therefore, it must be metered at the point where it enters the building. The other options are incorrect because natural gas is not an energy source used by the building in this case, and the flat fee or the ownership of the energy source do not exempt the project from the metering requirement.References: LEED v4 BD+C Reference Guide, Energy and Atmosphere Category, EAp Building-Level Energy Metering, page 569.

NEW QUESTION # 282
......
Each of the formats is unique in its own way and helps every USGBC certification exam applicant prepare according to his style. All of these formats are user-friendly and very helpful to clear the USGBC LEED-AP-BD-C Exam exam on the first try. USGBC LEED-AP-BD-C dumps are packed with multiple benefits that will help you prepare USGBC LEED-AP-BD-C Exam successfully in a short time. In case of new updates, USGBC LEED-AP-BD-C dumps will immediately provide you with up to 1 year of free questions updates. These free updates will save your time in case of USGBC LEED-AP-BD-C Exam real exam changes.
Exam Dumps LEED-AP-BD-C Free: https://www.prep4cram.com/LEED-AP-BD-C_exam-questions.html
What's more, part of that Prep4cram LEED-AP-BD-C dumps now are free: https://drive.google.com/open?id=1Shigo5A1x_P5Rt7fjgYijZ_BgGd9a8eI
Reply

Use props Report

You need to log in before you can reply Login | Register

This forum Credits Rules

Quick Reply Back to top Back to list