|
|
【General】
Project-Planning-Design考試題庫,Project-Planning-Design考試資料
Posted at yesterday 15:15
View:6
|
Replies:0
Print
Only Author
[Copy Link]
1#
P.S. KaoGuTi在Google Drive上分享了免費的2026 NCARB Project-Planning-Design考試題庫:https://drive.google.com/open?id=1bmwC0SbJdXMkRltmilmvFCtm_bjU7G6c
KaoGuTi的Project-Planning-Design考古題是經過眾多考生檢驗過的資料,可以保證有很高的成功率。如果你用過考古題以後仍然沒有通過考試,KaoGuTi會全額退款。或者你也可以選擇為你免費更新考試考古題。有了這樣的保障,實在沒有必要擔心了。
KaoGuTi NCARB的Project-Planning-Design考試培訓資料是由考生在類比的情況下學習,你可以控制題型和一些問題以及每個測試的時間,在KaoGuTi網站裏,你可以沒有壓力和焦慮來準備考試,同時也可以避免一些常見的錯誤,這樣你會獲得信心,在實際測試時能重複你的經驗,你將涵蓋各個領域和類別的微軟技術,幫助你成功的獲得認證。
Project-Planning-Design考試資料,Project-Planning-Design題庫更新NCARB的Project-Planning-Design考試認證肯定會導致你有更好的職業前景,通過NCARB的Project-Planning-Design考試認證不僅驗證你的技能,也證明你的證書和專業知識,KaoGuTi NCARB的Project-Planning-Design考試培訓資料是實踐檢驗的軟體,有了它你會得到的理解理論比以前任何時候都要好,將是和你最配備知識。在你決定購買之前,你可以嘗試一個免費的使用版本,這樣一來你就知道KaoGuTi NCARB的Project-Planning-Design考試培訓資料的品質,也是你最佳的選擇。
最新的 Architect Registration Examination Project-Planning-Design 免費考試真題 (Q74-Q79):問題 #74
When considering the IBC requirements, an architect can increase the number of options from which to select structural materials for an office building by doing which one of the following?
- A. Increasing the efficiency ratio
- B. Omitting 2-hour fire ratings
- C. Increasing the occupant capacity
- D. Limiting the area of the building
答案:D
解題說明:
Comprehensive and Detailed Explanation From Exact Extract:
Limiting the building area within allowable maximums based on occupancy and type increases the range of acceptable structural materials because larger buildings have stricter fire and structural requirements.
Increasing occupant capacity (A) increases code stringency.
Increasing efficiency ratio (B) is not an IBC classification.
Omitting 2-hour fire ratings (D) is not permitted and would reduce material options.
Thus, reducing building area allows more flexibility in structural material choices under IBC.
References:
ARE 5.0 PPD - Codes and Regulations, Building Materials and Fire Ratings The Architect's Handbook of Professional Practice, 15th Edition - Building Codes
問題 #75
A site has been engineered with a 1:20 grade.
Which of the following sidewalk designs would be the most cost-effective way to get from the top to the bottom and still be in compliance with the accessibility standards?
- A. Cutting diagonally across the slope at 1:12 with no handrail
- B. Switchback ramps at 1:12 with a handrail
- C. At the same grade as the slope with no handrail
- D. Cutting diagonally across the slope at 1:10 with a handrail
答案:A
解題說明:
Comprehensive and Detailed Explanation From Exact Extract:
A 1:20 slope means a 5% grade (1 vertical unit per 20 horizontal units), which is slightly steeper than the ideal maximum slope for accessible ramps.
* Option C: Cutting diagonally across the slope at 1:12 (~8.33%) slope without a handrail is the most cost-effective design that still complies with accessibility standards. According to the Americans with Disabilities Act (ADA) and ICC A117.1, the maximum slope for an accessible ramp is 1:12. Handrails are required on ramps with a rise greater than 6 inches (150 mm). If the rise is less than 6 inches, handrails are not required.
Because the diagonal cut reduces the slope to 1:12 and the total rise is likely less than 6 inches given the gentle 1:20 original slope, handrails are not mandatory, making this solution economical and code compliant.
* Option A: Switchback ramps at 1:12 with handrails are compliant but more expensive due to increased construction complexity and space requirements.
* Option B: A 1:10 slope (10%) exceeds the maximum allowed slope for accessible ramps and requires handrails, thus non-compliant.
* Option D: Following the existing 1:20 slope without modification does not provide the maximum accessibility slope and may be acceptable but might not comply with certain stricter local codes for ramps.
Therefore, Option C balances accessibility, cost, and compliance optimally.
References:
ARE 5.0 Project Planning & Design Content Outline: Environmental Conditions and Context - Site Accessibility and Grading ADA Standards for Accessible Design (2010) ICC A117.1 Accessibility Standards The Architect's Handbook of Professional Practice, 15th Edition, Chapter 7: Site Planning and Accessibility
問題 #76
An architect is working with a developer to determine which of three available sites should be the preferred location for a new office building that will primarily utilize passive energy systems. All three sites are located in a cold, northern climate with winter winds predominantly from the north and west.
Site descriptions:
Site A: Located at the top of a hill; small vegetation and brush; expansive views in all directions.
Site B: Located along a river; heavily wooded area on the north side; coniferous trees shading the southern face of the building.
Site C: Located on a rocky, south-facing slope; wooded on the eastern edge; native grasses on southern boundary.
Primary goal: maximize solar energy potential while maintaining winter wind protection.
Which site should be selected?
- A. Site B
- B. Site A
- C. Site C
答案:C
解題說明:
Comprehensive and Detailed Explanation From Exact Extract:
Site C offers a south-facing slope, which maximizes solar exposure-crucial in cold climates for passive solar heating. The wooded eastern edge provides wind protection from cold morning winds, and native grasses on the south reduce erosion while minimally shading.
Site A, on a hilltop with sparse vegetation, lacks wind protection.
Site B has coniferous trees shading the southern face, reducing solar gain, which is counterproductive for passive solar design.
Thus, Site C optimizes both solar potential and wind protection.
References:
ARE 5.0 PPD - Environmental Conditions and Context, Passive Solar Design The Architect's Handbook of Professional Practice, 15th Edition - Sustainable Site Planning
問題 #77

Refer to the exhibit (stair connecting four stories, occupant load 100, not accessible exit).
Not including the permitted projection for handrails and stringers, what is the minimum clear width of the stair at dimension X?
- A. 48 inches
- B. 60 inches
- C. 36 inches
- D. 44 inches
答案:D
解題說明:
Comprehensive and Detailed Explanation From Exact Extract:
For stairs serving 100 occupants, building codes such as IBC require a minimum clear width of 44 inches to accommodate occupant egress.
36 inches is typical minimum for stairs serving smaller occupant loads.
Wider widths like 48 or 60 inches are required for higher occupant loads.
Handrails and projections may reduce nominal width but are not included in minimum clear width measurements.
References:
ARE 5.0 PPD - Codes and Regulations, Egress Requirements
IBC 2018 Chapter 10 - Means of Egress
問題 #78
An architect has just received client approval of the Schematic Design documents for a three-story, outpatient medical clinic. The clinic is located within a mixed-use development governed by a City-approved Planned Development (PD) document. The medical clinic design utilizes standardized departmental layouts and includes outpatient clinics, as well as treatment spaces, administrative spaces and public/lobby spaces.
The site needs to accommodate four different vehicular traffic flows: patient traffic, staff traffic, service and delivery traffic, and emergency services traffic. In addition, a pedestrian plaza must connect to the mixed-use development sidewalks. The plaza must provide space for bicycle parking and will serve as the future bus stop.
The site design addresses several challenges related to building orientation. The southeast facade, with excellent visibility from the highway, is the location of all service equipment. The building entrance faces northwest, convenient to the parking but not visible from the highway.
The client believes future patient volumes will outgrow the clinic. The PD document allows for a planned Phase 2 development on the adjacent vacant site to the southwest. Phase 2 would include a second building (2 story, 80,000 BGSF) and/or a parking deck.
Other considerations for the project include:
* Protected tree requirements are defined in the PD document.
* Easy pedestrian access must be provided from Sycamore Boulevard.
* All required parking for the clinic must be accommodated on site.
* Programmed area includes 109,450 Departmental Gross Square Feet (DGSF) / 130,184 Building Gross Square Feet (BGSF).
* Exterior material percentages are dictated by the PD document and shall not exceed specific percentages for Primary and Secondary Finishes.
* All service equipment needs to be screened; see PD document for restrictions.
* Signage opportunities are important to the client.
* Acoustical privacy is a concern of the healthcare system.
The following resources are available for your reference:
* Drawings, including a perspective, plans, and exterior elevations
* Building Program, including client's departmental program and detailed program for Treatment 01 (Infusion)
* Exterior Material Cost Comparisons
* Planned Development Document
* IBC Excerpts, showing relevant code sections
* ADA Excerpts, showing relevant sections from the ADA Standards for Accessible Design The developer decides that the 4-inch terra cotta exterior veneer is too expensive, and wants to replace the terra cotta with an alternative finish in its entirety.
Which of the following alternative materials should the architect suggest to reduce cost and meet the Planned Development Document requirements? Check the two that apply.
- A. Cultured Stone
- B. Standard Brick
- C. Low Priced Stone
- D. Artisan Brick
- E. Earth Tone EIFS
- F. Metal Panels (Fluoropolymer finish)
答案:B,E
解題說明:
To reduce costs while complying with Planned Development (PD) document restrictions on exterior finishes, the architect should select materials that are less expensive than terra cotta yet meet aesthetic and code requirements:
Standard brick (C) is a cost-effective, durable alternative with broad acceptance.
Earth tone EIFS (E) (Exterior Insulation and Finish System) offers an economical and versatile finish that can replicate various textures and colors while reducing costs.
Low priced stone (A) and cultured stone (B) may still be costly or not permitted per PD document.
Artisan brick (D) and metal panels (F) may exceed allowed percentages or not fit aesthetic guidelines.
References:
Planned Development Document
ARE 5.0 PPD - Project Integration of Program and Systems
The Architect's Handbook of Professional Practice, 15th Edition - Exterior Finishes
問題 #79
......
你可以現在就獲得NCARB的Project-Planning-Design考試認證,我們KaoGuTi有關於NCARB的Project-Planning-Design考試的完整版本,你不需要到處尋找最新的NCARB的Project-Planning-Design培訓材料,因為你已經找到了最好的NCARB的Project-Planning-Design培訓材料,放心使用我們的試題及答案,你會完全準備通過NCARB的Project-Planning-Design考試認證。
Project-Planning-Design考試資料: https://www.kaoguti.com/Project-Planning-Design_exam-pdf.html
NCARB Project-Planning-Design考試題庫 路由和交換領域的專家可以解決復雜的連接問題,利用技術解決方案提高帶寬、縮短響應時間、最大限度地提高性能、加強安全性和支持全球性應用,IT認證又是IT行業裏競爭的手段之一,通過了認證你的各方面將會得到很好的上升,但是想要通過並非易事,所以建議你利用一下培訓工具,如果要選擇通過這項認證的培訓資源,KaoGuTi NCARB的Project-Planning-Design考試培訓資料當仁不讓,它的成功率高達100%,能夠保證你通過考試,您可以通過Project-Planning-Design考古題來獲得認證,這將是您成為專業的IT人員的擁有美好未來的不錯選擇,NCARB 的 Project-Planning-Design 考試培訓資料針對性很強,不是每個互聯網上的培訓資料都是這樣高品質的,僅此一家,只有NewDumps能夠這麼完美的展現,Project-Planning-Design 專業技術認證是進入IT行業的“敲門磚”。
妳看那是什麽,秦雲有些驚訝,來也不告訴我,路由和交換領域的專家可以解決復雜的Project-Planning-Design連接問題,利用技術解決方案提高帶寬、縮短響應時間、最大限度地提高性能、加強安全性和支持全球性應用,IT認證又是IT行業裏競爭的手段之一,通過了認證你的各方面將會得到很好的上升,但是想要通過並非易事,所以建議你利用一下培訓工具,如果要選擇通過這項認證的培訓資源,KaoGuTi NCARB的Project-Planning-Design考試培訓資料當仁不讓,它的成功率高達100%,能夠保證你通過考試。
Project-Planning-Design認證考試的題目與答案您可以通過Project-Planning-Design考古題來獲得認證,這將是您成為專業的IT人員的擁有美好未來的不錯選擇,NCARB 的 Project-Planning-Design 考試培訓資料針對性很強,不是每個互聯網上的培訓資料都是這樣高品質的,僅此一家,只有NewDumps能夠這麼完美的展現。
Project-Planning-Design 專業技術認證是進入IT行業的“敲門磚”。
- 最新Project-Planning-Design考古題 🏑 最新Project-Planning-Design考古題 🍾 Project-Planning-Design試題 🤐 到➥ [url]www.newdumpspdf.com 🡄搜索⏩ Project-Planning-Design ⏪輕鬆取得免費下載最新Project-Planning-Design考古題[/url]
- Project-Planning-Design認證 🦯 Project-Planning-Design學習資料 ⬇ 免費下載Project-Planning-Design考題 ⚾ 到▛ [url]www.newdumpspdf.com ▟搜索▷ Project-Planning-Design ◁輕鬆取得免費下載Project-Planning-Design測試引擎[/url]
- 保證通過的Project-Planning-Design考試題庫&資格考試領導者和快速下載的NCARB ARE 5.0 Project Planning & Design (PPD) 🔷 立即到➤ tw.fast2test.com ⮘上搜索( Project-Planning-Design )以獲取免費下載最新Project-Planning-Design考古題
- 最好的Project-Planning-Design考試題庫,最有效的學習資料幫助妳壹次性通過Project-Planning-Design考試 🗳 【 [url]www.newdumpspdf.com 】上的免費下載▛ Project-Planning-Design ▟頁面立即打開Project-Planning-Design真題[/url]
- 最有效的Project-Planning-Design考試題庫,免費下載Project-Planning-Design學習資料幫助妳通過Project-Planning-Design考試 🙈 在“ tw.fast2test.com ”上搜索☀ Project-Planning-Design ️☀️並獲取免費下載Project-Planning-Design考古題介紹
- 最新的Project-Planning-Design認證考試資料庫 🆘 透過⇛ [url]www.newdumpspdf.com ⇚輕鬆獲取( Project-Planning-Design )免費下載Project-Planning-Design題庫最新資訊[/url]
- Project-Planning-Design最新試題 🏛 最新Project-Planning-Design考題 🍬 最新Project-Planning-Design考古題 🐪 免費下載➠ Project-Planning-Design 🠰只需在▶ [url]www.pdfexamdumps.com ◀上搜索Project-Planning-Design題庫最新資訊[/url]
- 新版Project-Planning-Design題庫 🤍 Project-Planning-Design學習資料 🎳 Project-Planning-Design測試題庫 😻 在“ [url]www.newdumpspdf.com ”網站下載免費➠ Project-Planning-Design 🠰題庫收集Project-Planning-Design題庫最新資訊[/url]
- Project-Planning-Design認證 🩳 Project-Planning-Design資訊 🔽 Project-Planning-Design認證 🐏 在⇛ [url]www.newdumpspdf.com ⇚搜索最新的➡ Project-Planning-Design ️⬅️題庫最新Project-Planning-Design考題[/url]
- Project-Planning-Design真題 🕤 新版Project-Planning-Design題庫 🌐 Project-Planning-Design學習資料 💫 請在⇛ [url]www.newdumpspdf.com ⇚網站上免費下載「 Project-Planning-Design 」題庫最新Project-Planning-Design題庫資源[/url]
- Project-Planning-Design學習資料 🕜 Project-Planning-Design試題 🧴 Project-Planning-Design測試引擎 😄 [ [url]www.pdfexamdumps.com ]上的免費下載⇛ Project-Planning-Design ⇚頁面立即打開最新Project-Planning-Design題庫資源[/url]
- www.stes.tyc.edu.tw, www.stes.tyc.edu.tw, www.stes.tyc.edu.tw, barclaytraininginstitute.com, libict.org, www.stes.tyc.edu.tw, bitizens.net, www.stes.tyc.edu.tw, bazylewiczsineath792.blogspot.com, www.stes.tyc.edu.tw, Disposable vapes
此外,這些KaoGuTi Project-Planning-Design考試題庫的部分內容現在是免費的:https://drive.google.com/open?id=1bmwC0SbJdXMkRltmilmvFCtm_bjU7G6c
|
|