Firefly Open Source Community

   Login   |   Register   |
New_Topic
Print Previous Topic Next Topic

[Hardware] 100% Pass AVIXA - CTS Authoritative Free Download Pdf

138

Credits

0

Prestige

0

Contribution

registered members

Rank: 2

Credits
138

【Hardware】 100% Pass AVIXA - CTS Authoritative Free Download Pdf

Posted at 10 hour before      View:5 | Replies:0        Print      Only Author   [Copy Link] 1#
DOWNLOAD the newest TestPassed CTS PDF dumps from Cloud Storage for free: https://drive.google.com/open?id=10YFXAjF-biHLwOzIkeiqVhoOEXT7k6c7
TestPassed is one of the leading platforms that has been helping AVIXA Exam Questions candidates for many years. Over this long time, period the Certified Technology Specialist (CTS) exam dumps helped countless Certified Technology Specialist (CTS) exam questions candidates and they easily cracked their dream AVIXA CTS Certification Exam. You can also trust Certified Technology Specialist (CTS) exam dumps and start Certified Technology Specialist (CTS) exam preparation today.
AVIXA CTS Exam Certification Details:
Sample QuestionsAVIXA CTS Sample Questions
Exam NameAVIXA Certified Technology Specialist (CTS)
Non-Member Exam Price$475(USD)
MemberExam Price$375(USD)
Passing Score350 / 500

AVIXA CTS Exam Syllabus Topics:
TopicDetails
Topic 1
  • Servicing AV Solutions: This section of the exam measures the skills of AV maintenance managers and focuses on the maintenance and repair of AV solutions. It involves supervising AV operations, conducting preventative maintenance, performing firmware and equipment upgrades, and troubleshooting and repairing AV systems to ensure they remain functional and efficient.
Topic 2
  • Supporting AV System Operation: This section of the exam measures the skills of AV support specialists and covers the ongoing support of AV systems. It includes troubleshooting issues, providing remote assistance, supporting live events, and offering in-room operation training to ensure smooth system operation.
Topic 3
  • Creating AV Solutions: This section of the exam measures the skills of AV system designers and covers the process of creating audiovisual solutions. It includes conducting customer needs analysis, performing site surveys to assess environmental factors like lighting and acoustics, developing project scopes, and designing AV solutions with detailed drawings and materials lists.
Topic 4
  • Implementing AV Solutions: This section of the exam measures the skills of AV system integrators and focuses on the implementation of AV solutions. It involves integrating AV systems, verifying their functionality, and managing the integration process, including training, documentation, and ensuring operational readiness.

Hot Free CTS Download Pdf | High Pass-Rate CTS Study Dumps: Certified Technology Specialist 100% PassTestPassed CTS exam braindumps are authorized legal products which is famous for its high passing rate. Our dumps can cover nearly 95% questions of the real test, our answers and explanations are edited by many experienced experts and the correct rate is 100%. Our AVIXA CTS Exam Braindumps provide three versions to satisfy different kinds of customers' habits: PDF version, Soft test engine and APP test engine.
AVIXA Certified Technology Specialist Sample Questions (Q33-Q38):NEW QUESTION # 33
When evaluating site conditions for an AV project that requires a free-standing rack that is 49 RU or taller, the condition that will force assembly on site instead of building the rack in the shop and delivering it fully assembled is when the:
  • A. Elevator/lift is only 7 feet [2.13 meters] tall
  • B. Construction dumpster is located close to the loading dock
  • C. Lighting is better onsite
  • D. Room is only accessible after normal working hours
Answer: A
Explanation:
A 49 RU rack is approximately 7 feet tall. If the elevator is also 7 feet or less, there won't be sufficient clearance to transport the pre-assembled rack. Therefore, it must be assembled onsite.
"Site constraints, such as doorway and elevator clearances, must be reviewed. Racks over 49 RU often require onsite assembly due to height limitations."
- CTS Exam Guide, Equipment Installation and Logistics Planning

NEW QUESTION # 34
During system verification, an issue has been noted where the microphone becomes very quiet when any laptop audio is played. What should be reviewed in the audio DSP?
  • A. Limiter
  • B. Gain structure
  • C. Feedback suppressor
  • D. Ducker
Answer: D
Explanation:
A ducker is a feature in audio DSPs that automatically reduces the level of one audio signal when another signal is present. In this scenario, the ducker is likely set to reduce the microphone level when laptop audio is detected. Reviewing and adjusting the ducker settings will resolve the issue.
Reference: CTS Certified Technology Specialist Exam Guide, Third Edition

NEW QUESTION # 35
Before confirming an anticipated completion date with the customer, it is MOST important to
  • A. ensure the date is not a holiday.
  • B. double check the floor finishes.
  • C. create the system maintenance schedule.
  • D. ensure no components are backordered.
Answer: D
Explanation:
Before confirming an anticipated completion date, it is critical to ensure that all components required for the project are available and not backordered. Backordered components can cause significant delays, impacting the overall project timeline. By verifying the availability of all necessary components, you can provide a realistic and reliable completion date to the customer. This step is essential for effective project planning and avoiding unexpected delays.

NEW QUESTION # 36
According to the AVIXA Rack Design standard, what should be the MINIMUM distance between an AC Power cable and a Data Twisted Pair cable?
  • A. 300 mm (~12 in)
  • B. 50 mm (-2 in)
  • C. 25 mm (~1 in)
  • D. 100 mm (~4 in)
Answer: D
Explanation:
According to AVIXA standards for rack design, there should be a minimum distance of 100 mm (approximately 4 inches) between AC power cables and data twisted pair cables. This spacing helps to reduce the potential for electromagnetic interference (EMI) between power and data cables, ensuring signal integrity and reducing noise.
CTS Technology Specialist Reference
The AVIXA standards emphasize proper cable management to minimize interference in AV installations.
Maintaining a 100 mm separation aligns with best practices for reducing crosstalk and preserving data quality in networked systems.

NEW QUESTION # 37
Company information, statement of work, drawings, and bill of materials are presented to the customer as what set of documents?
  • A. bid packet (response)
  • B. request for quote
  • C. contract documents
  • D. request for proposal
Answer: A
Explanation:
Company information, statement of work, drawings, and bill of materials are presented to the customer as a bid packet (response). This set of documents is used to respond to a request for proposal(RFP) and provides detailed information about how the contractor intends to meet the project requirements. Axis Technology Specialist documentation emphasizes the importance of a comprehensive bid packet to communicate the scope, approach, and cost of a project to the client.

NEW QUESTION # 38
......
If you are very busy, you can only take two or three hours a day to study our CTS study engine. Then I tell you this is enough! After ten days you can go to the exam. With such an efficient product, you really can't find the second one! In any case, many people have passed the exam after using CTS Training Materials. This is a fact that you must see. As long as you are still a sensible person, you will definitely choose CTS practice quiz. Don't hesitate! Time does not wait!
CTS Study Dumps: https://www.testpassed.com/CTS-still-valid-exam.html
BTW, DOWNLOAD part of TestPassed CTS dumps from Cloud Storage: https://drive.google.com/open?id=10YFXAjF-biHLwOzIkeiqVhoOEXT7k6c7
Reply

Use props Report

You need to log in before you can reply Login | Register

This forum Credits Rules

Quick Reply Back to top Back to list