Firefly Open Source Community

   Login   |   Register   |
New_Topic
Print Previous Topic Next Topic

[General] Exam CTS-D Cram Review | Pass CTS-D Exam

131

Credits

0

Prestige

0

Contribution

registered members

Rank: 2

Credits
131

【General】 Exam CTS-D Cram Review | Pass CTS-D Exam

Posted at yesterday 07:49      View:19 | Replies:0        Print      Only Author   [Copy Link] 1#
DOWNLOAD the newest ExamPrepAway CTS-D PDF dumps from Cloud Storage for free: https://drive.google.com/open?id=1Y85XHoB8vmTwvKGvj8EdpWI7110q7Loc
These AVIXA CTS-D exam practice questions will greatly help you to prepare well for the final CTS-D certification exam. AVIXA CTS-D exam preparation and boost your confidence to pass the CTS-D Exam. All AVIXA CTS-D exam practice test questions contain the real and updated AVIXA CTS-D exam practice test questions.
AVIXA CTS-D - Design Exam Syllabus Topics:
TopicWeight
Duty A: Conducting a Needs Assessment16.8%
Task 1: Identify Decision-makers and Stakeholders1.6%
Task 2: Identify Skill Level of End Users2.4%
Task 3: Educate AV Clients1.6%
Task 4: Review Client Technology Master Plan3.2%
Task 5: Identify Client Expectations4%
Task 6: Identify Scope of Work4%
Duty B:Coordinating with Other Professionals to Develop Project Documentation23.2%
Task 1: Review A/E (architectural and engineering) drawings4%
Task 2: Coordinate with architectural/interior design professionals4%
Task 3: Coordinate with Mechanical Professionals1.6%
Task 4: Coordinate with Structural Professionals1.6%
Task 5: Coordinate with Electrical Professionals3.2%
Task 6: Coordinate with lighting professionals2.4%
Task 7: Coordinate with IT and network security professionals4.0%
Task 8: Coordinate with acoustical professionals1.6%
Task 9: Coordinate with life safety and security professionals0.8%
Duty C: Developing AV Designs48%
Task 1: Create Draft AV Design10.4%
Task 2: Confirm site conditions8%
Task 3: Produce AV infrastructure drawings12%
Task 4: Produce AV system drawings12%
Task 5: Finalize Project Documentation5.6%
Duty D:Conducting Project Implementation Activities12%
Task 1: Participate in Project Implementation Communication3.2%

Pass AVIXA CTS-D Exam & Latest CTS-D Mock ExamThere are more and more people to try their best to pass the CTS-D exam, including many college students, a lot of workers, and even many housewives and so on. These people who want to pass the CTS-D exam have regard the exam as the only one chance to improve themselves and make enormous progress. So they hope that they can be devoting all of their time to preparing for the CTS-D Exam, but it is very obvious that a lot of people have not enough time to prepare for the important CTS-D exam. Our CTS-D exam questions can help you pass the CTS-D exam with least time and energy.
AVIXA CTS-D Exam Certification Details:
Number of Questions135
Non-Member Exam Price$575(USD)
Exam CodeCTS-D
Schedule ExamPearson VUE
MemberExam Price$475(USD)
Books / TrainingCandidate Handbook
Duration180 mins

AVIXA Certified Technology Specialist - Design Sample Questions (Q56-Q61):NEW QUESTION # 56
Which abbreviation on a drawing tells you that you will not need to install a specific display screen?
Response:
  • A. OFOI
  • B. NTS
  • C. OC
  • D. OD
Answer: A

NEW QUESTION # 57
What type of drawing would you use to find out exactly how the projector should be mounted to the ceiling?
Response:
  • A. Mechanical drawing
  • B. Section drawing
  • C. Reflected ceiling plan
  • D. Detail drawing
Answer: D

NEW QUESTION # 58
In the bid (tender) process what items SHOULD the AV Documents (RFP) detail in order to complete the scope of work for a given project?
Response:
  • A. Qualification, equipment & performance requirements
  • B. Programming detail, system warranty and client desires
  • C. Client needs, desires and budget
  • D. Equipment, benchmarking approach and budget
Answer: A

NEW QUESTION # 59
A conference room is 40 ft. x 30 ft. and the ceiling is 10 ft. high. Ceiling loudspeakers will be used to cover the room for speech reinforcement with a target SPL level of 75 dB SPL.
The loudspeakers have a coverage circle diameter of 12 ft. and the spacing between loudspeakers is approximately 8.5 ft. Assuming the ceiling mounted loudspeakers are part of 70 V distributed system, what is the minimum size power amplifier that should be used?
Loudspeaker Sensitivity: 91 dB SPL @ 1 W / 1 m Transformer Taps available: 70 V: 60 W, 30 W, 15 W, 7.5 W 100 V: 60 W, 30 W, 15 W Response:
  • A. 300 W
  • B. 90 W
  • C. 200 W
  • D. 25 W
Answer: C

NEW QUESTION # 60
How does one define project responsibilities and identify AV technology requirements?
Response:
  • A. The project manager will outline the responsibilities in the RFP
  • B. Follow guidelines determined by state and local building codes
  • C. Follow the project directory & program report
  • D. Consult with the owner as the project progresses
Answer: C

NEW QUESTION # 61
......
Pass CTS-D Exam: https://www.examprepaway.com/AVIXA/braindumps.CTS-D.ete.file.html
DOWNLOAD the newest ExamPrepAway CTS-D PDF dumps from Cloud Storage for free: https://drive.google.com/open?id=1Y85XHoB8vmTwvKGvj8EdpWI7110q7Loc
Reply

Use props Report

You need to log in before you can reply Login | Register

This forum Credits Rules

Quick Reply Back to top Back to list