Firefly Open Source Community

   Login   |   Register   |
New_Topic
Print Previous Topic Next Topic

[General] Exam Dumps NCARB Project-Management Free & Valid Project-Management Exam Tut

127

Credits

0

Prestige

0

Contribution

registered members

Rank: 2

Credits
127

【General】 Exam Dumps NCARB Project-Management Free & Valid Project-Management Exam Tut

Posted at yesterday 20:28      View:15 | Replies:0        Print      Only Author   [Copy Link] 1#
P.S. Free & New Project-Management dumps are available on Google Drive shared by ITExamSimulator: https://drive.google.com/open?id=133iSH9nUTZ-3Kn_t-Fx24nwESlyHuAC4
Combined with your specific situation and the characteristics of our Project-Management exam questions, our professional services will recommend the most suitable version of Project-Management study materials for you. We introduce a free trial version of the Project-Management learning guide because we want users to see our sincerity. Project-Management exam prep sincerely hopes that you can achieve your goals and realize your dreams.
The ARE 5.0 Project Management (PjM) Exam (Project-Management) is one of the popular exams of NCARB Project-Management. It is designed for NCARB aspirants who want to earn the ARE 5.0 Project Management (PjM) Exam (Project-Management) certification and validate their skills. The Project-Management test is not an easy exam to crack. It requires dedication and a lot of hard work. You need to prepare well to clear the ARE 5.0 Project Management (PjM) Exam (Project-Management) test on the first attempt. One of the best ways to prepare successfully for the Project-Management examination in a short time is using real Project-Management Exam Dumps.
Valid Project-Management Exam Tutorial | Reliable Project-Management Dumps QuestionsTo get the Project-Management certification takes a certain amount of time and energy. Even for some exam like Project-Management, the difficulty coefficient is high, the passing rate is extremely low, even for us to grasp the limited time to efficient learning. So how can you improve your learning efficiency? Here, I would like to introduce you to a very useful product, our Project-Management practice materials, through the information and data provided by it, you will be able to pass the Project-Management qualifying examination quickly and efficiently as the pass rate is high as 99% to 100%.
NCARB ARE 5.0 Project Management (PjM) Exam Sample Questions (Q58-Q63):NEW QUESTION # 58
Which of the following best describes the architect's role in cost estimating during schematic design?
  • A. Providing a preliminary opinion of probable construction cost
  • B. Developing a detailed quantity takeoff and vendor pricing
  • C. Approving final project budget with the owner
  • D. Verifying contractor bids and change order pricing
Answer: A
Explanation:
During schematic design, the architect provides a preliminary opinion of probable construction cost (OPCC) based on conceptual design. This estimate is less detailed but important for budgeting and feasibility analysis.
It helps the owner make informed decisions about project scope and design direction early in the process.
Detailed quantity takeoffs and vendor pricing occur later in the design development or construction documents phases. Verifying bids and approving final budgets are responsibilities tied to later stages. The ARE 5.0 PjM exam highlights early-stage cost estimating as a critical tool for scope control and project feasibility.

NEW QUESTION # 59
On a private project, which of the following actions by a subcontractor who had not been paid by the contractor is most likely to be an effective collection measure?
  • A. Demanding payment from the surety
  • B. Placing a mechanic's lien on the owner's property
  • C. Hiring a collection agency
  • D. Demanding payment from the owner
Answer: B
Explanation:
Verified Answer
On private projects, if a subcontractor is not paid, they may file a mechanic's lien against the owner's property. This legal tool can delay or block sale or refinancing until the debt is settled. It is often the most effective method for securing payment on private projects.
* A mechanic's lien attaches to the property, putting legal and financial pressure on the owner to resolve the issue.
* This is more effective than a collection agency or contacting the surety (which applies only if there is a payment bond, usually on public projects).
* Reference: AIA A201 §9.6.5
* NCARB ARE 5.0 Handbook - PjM Content Area 5: Construction Phase Responsibilities

NEW QUESTION # 60
An architecture firm is negotiating a contract with an owner for a $2,000,000 project. The proposed architectural-only fee is 5% of the cost of construction through the end of the Construction Document Phase.
During the negotiations, the owner wants to apply for a building permit in 7 weeks without exceeding the original budget constraints. The project staff currently consists of 2 people who have an hourly rate of $100.
What is the minimum project staff required to meet the owner's new schedule?
  • A. 0
  • B. 1
  • C. 2
  • D. 3
Answer: D
Explanation:
Comprehensive Detailed Explanation:
Step 1: Fee available through CD phase:
$2,000,000 × 5% = $100,000
Step 2: Time constraint: 7 weeks
Hourly rate: $100/person
Max hours affordable: $100,000 ÷ $100 = 1,000 hours
Step 3: Hours per person over 7 weeks:
Assume 40 hours/week # 1 person = 280 hours
X = number of people
280 × X = 1,000 hours # X = ~3.57 # round up # 4 people
References:
NCARB ARE 5.0 Handbook - Fee calculation, budgeting, and scheduling
Ballast ARE 5 Review Manual - Staff planning exercises

NEW QUESTION # 61
A principal architect is working with a school district on designing an 18,000-square-foot athletics training facility. During the DD phase, the principal notices that the firm's younger staff has produced equipment plans that do not coordinate with the electrical engineer's sheets.
How should the principal architect respond to the lack of coordination? Check the three that apply.
  • A. Hold a design charrette
  • B. Coordinate drawings in submittal review
  • C. Review checklists with the staff
  • D. Conduct a desk critique
  • E. Extend the design schedule
  • F. Schedule an immediate coordination meeting
Answer: C,D,F
Explanation:
These three actions represent proactive and constructive responses to coordination issues during the Design Development (DD) phase.
A). Review checklists with the staff: Using coordination checklists reinforces quality control standards and helps less-experienced staff identify typical coordination pitfalls.
D). Conduct a desk critique: This one-on-one review allows the principal to mentor younger staff, identify specific problems, and ensure corrections are made early.
E). Schedule an immediate coordination meeting: Critical to resolving discrepancies quickly with the electrical consultant and design team to realign the design set.
Incorrect options:
B). Design charrettes are typically used for creative brainstorming in schematic design, not resolving coordination issues in DD.
C). Extending the schedule is a last resort and not an efficient first step.
F). Submittal review happens during construction and is too late for addressing design-phase coordination issues.
ARE 5.0 PjM References:
NCARB ARE 5.0 Handbook - PjM: "Consultant Coordination & Document Quality Control" AHPP, 15th ed., Chapter 11: Design Phases and Staff Management Quality Management Plan strategies during DD and CD phases Let me know if you'd like follow-up questions or explanations from other divisions like CE, PPD, or PA.

NEW QUESTION # 62

Refer to the exhibit
Twenty-five acres of undeveloped rural property was purchased for the site of a new elementary school.
During the DD phase, the civil engineer and structural engineers make design proposals based on the information provided in the geotechnical report. The civil engineer indicates that several cubic yards of fill material should be installed within the proposed building footprint to make up for the change in topography (was uniformly). The structural engineer indicates a footing depth of 24 inches for the entire facility. During the CD phase, the owner asks the architect to add classrooms to one wing. The civil engineer proposes that extra fill should not be installed beneath the additional classrooms.
Which of the following should the architect do before completion of CDs? Check the three that apply.
  • A. Increase the footing depth beneath the new classrooms
  • B. Notify the structural engineer of the civil engineer's recommendation
  • C. Request an updated geotechnical evaluation
  • D. Add general notes about structural bearing to the drawings
  • E. Update the estimate of the cost of work
  • F. Schedule a quality assurance meeting with the project team
Answer: B,C,E
Explanation:
A). Update the estimate of the cost of work
# Adding classrooms affects scope and site preparation (e.g., fill material, grading, foundations), which affects cost. Per AIA B101 §6.3, architects must update the estimate of the cost of the work as the design evolves.
C). Request an updated geotechnical evaluation
# The original geotech report didn't account for this building extension. Without fill under the new addition, soil bearing capacity must be reassessed to avoid differential settlement or structural failure. This is a standard risk mitigation strategy.
D). Notify the structural engineer of the civil engineer's recommendation
# The structural engineer must know that the site prep differs under the added classrooms, as this could affect foundation design. Coordination among consultants is a core architectural responsibility (per B101 §3.1.2).
#Incorrect Options:
B). Schedule a quality assurance meeting with the project team
# While helpful, it's not critical or required specifically in this context before CDs are completed.
E). Increase the footing depth beneath the new classrooms
# The architect should not unilaterally change structural design decisions. That's the structural engineer's responsibility, and any change should be based on engineering analysis and revised soil data.
F). Add general notes about structural bearing to the drawings
# Premature. The structural engineer should first review the new geotechnical findings before any notes are added.
References:
AIA B101 - Article 3.1 & 3.2 (Architect's coordination & design responsibilities) NCARB ARE 5.0 Handbook - PjM Content Area 1: Project Coordination Geotechnical coordination practices, CSI Spec Guidelines

NEW QUESTION # 63
......
There are multiple choices on the versions of our Project-Management learning guide to select according to our interests and habits since we have three different versions of them: the PDF, the Software and the APP online. The PDF version of our Project-Management exam dumps can be printed. And the Software and APP online versions of our Project-Management Preparation materials can be practiced on computers or phones. They are new developed for the reason that electronics products have been widely applied to our life and work style.
Valid Project-Management Exam Tutorial: https://www.itexamsimulator.com/Project-Management-brain-dumps.html
NCARB Exam Dumps Project-Management Free Yes, your interest of study will rise up definitely, The course designers of ITExamSimulator Valid Project-Management Exam Tutorial are fully aware of the problems of the candidates and thus they have developed an excellent Valid Project-Management Exam Tutorial study guide which comprises an easy to grasp material, Project-Management exam materials really hope that every user can pick the right Project-Management study guide for them.
But what if there is no need to work, Set Error Capture | Move Project-Management or not move) error messages to Status function, based on option chosen, Yes, your interest of study will rise up definitely.
The course designers of ITExamSimulator are fully aware of the problems Exam Dumps Project-Management Free of the candidates and thus they have developed an excellent Architect Registration Examination study guide which comprises an easy to grasp material.
Quiz 2026 NCARB Project-Management: Latest Exam Dumps ARE 5.0 Project Management (PjM) Exam FreeProject-Management Exam Materials really hope that every user can pick the right Project-Management study guide for them, We all have known clearly that the major issue of IT industry is lack of high-quality Project-Management actual exam dumps.
The customers of our Project-Management test review material can enter our website and download the free demo just to be sure.
What's more, part of that ITExamSimulator Project-Management dumps now are free: https://drive.google.com/open?id=133iSH9nUTZ-3Kn_t-Fx24nwESlyHuAC4
Reply

Use props Report

You need to log in before you can reply Login | Register

This forum Credits Rules

Quick Reply Back to top Back to list